(1)Except as specified in
subsections (2) and (3) of this section, an applicant for a development permit shall
submit estimated water supply requirements for the proposed development in a
report prepared by a registered professional engineer or water supply expert
acceptable to the local government. The report shall include:
(a)An estimate of the water supply requirements for the proposed
development through build-out conditions;
(b)A description of the physical source of water supply that will be used to
serve the proposed development;
(c)An estimate of the amount of water yield projected from the proposed
water supply under various hydrologic conditions;
(d)Water conservation measures, if any, that may be implemented within the
development;
(e)Water demand management m
Free access — add to your briefcase to read the full text and ask questions with AI
(1) Except as specified in
subsections (2) and (3) of this section, an applicant for a development permit shall
submit estimated water supply requirements for the proposed development in a
report prepared by a registered professional engineer or water supply expert
acceptable to the local government. The report shall include:
(a) An estimate of the water supply requirements for the proposed
development through build-out conditions;
(b) A description of the physical source of water supply that will be used to
serve the proposed development;
(c) An estimate of the amount of water yield projected from the proposed
water supply under various hydrologic conditions;
(d) Water conservation measures, if any, that may be implemented within the
development;
(e) Water demand management measures, if any, that may be implemented
within the development to account for hydrologic variability; and
(f) Such other information as may be required by the local government.
(2) If the development is to be served by a water supply entity, the local
government may allow the applicant to submit, in lieu of the report required by
subsection (1) of this section, a letter prepared by a registered professional
engineer or by a water supply expert from the water supply entity stating whether
the water supply entity is willing to commit and its ability to provide an adequate
water supply for the proposed development. The water supply entity's engineer or
expert shall prepare the letter if so requested by the applicant. At a minimum, the
letter shall include:
(a) An estimate of the water supply requirements for the proposed
development through build-out conditions;
(b) A description of the physical source of water supply that will be used to
serve the proposed development;
(c) An estimate of the amount of water yield projected from the proposed
water supply under various hydrologic conditions;
(d) Water conservation measures, if any, that may be implemented within the
proposed development;
(e) Water demand management measures, if any, that may be implemented
to address hydrologic variations; and
(f) Such other information as may be required by the local government.
(3) In the alternative, an applicant shall not be required to provide a letter or
report identified pursuant to subsections (1) and (2) of this section if the water for
the proposed development is to be provided by a water supply entity that has a
water supply plan that:
(a) Has been reviewed and updated, if appropriate, within the previous ten
years by the governing board of the water supply entity;
(b) Has a minimum twenty-year planning horizon;
(c) Lists the water conservation measures, if any, that may be implemented
within the service area;
(d) Lists the water demand management measures, if any, that may be
implemented within the development;
(e) Includes a general description of the water supply entity's water
obligations;
(f) Includes a general description of the water supply entity's water supplies;
and
(g) Is on file with the local government.