Wisconsin Electric Power Company v. William K. Reilly, Administrator and United States Environmental Protection Agency

893 F.2d 901
CourtCourt of Appeals for the Seventh Circuit
DecidedApril 3, 1990
Docket88-3264, 89-1339
StatusPublished
Cited by68 cases

This text of 893 F.2d 901 (Wisconsin Electric Power Company v. William K. Reilly, Administrator and United States Environmental Protection Agency) is published on Counsel Stack Legal Research, covering Court of Appeals for the Seventh Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Wisconsin Electric Power Company v. William K. Reilly, Administrator and United States Environmental Protection Agency, 893 F.2d 901 (7th Cir. 1990).

Opinion

CUDAHY, Circuit Judge.

The Petitioner, Wisconsin Electric Power Company (“WEPCO”), challenges two final determinations issued by the Environmental Protection Agency (the “EPA”). In these determinations, the EPA concluded that WEPCO’s proposed renovations to its Port Washington power plant would subject the plant to certain pollution control provisions of the Clean Air Act, as amended, 42 U.S.C. §§ 7401 et seq. (1982). We affirm in part, vacate in part and remand to the EPA.

I. The Underlying Dispute

A. Relevant Provisions of the Clean Air Act

Some discussion of the Clean Air Act is required before turning to the merits of this case. In 1970, Congress enacted the Clean Air Act Amendments, Pub.L. No. 91-604, 84 Stat. 1676, to establish minimum air quality standards that would regulate the emission of certain pollutants into the atmosphere. To this end, Congress instructed the EPA to develop National Ambient Air Quality Standards (“NAAQS”) that would specify the maximum permissible concentration of air pollutants in different areas across the country.

In section 111 of the 1970 Amendments, Congress required the EPA to promulgate New Source Performance Standards (“NSPS”) in order to regulate the emission of air pollutants from new sources. These standards addressed hourly rates of emission and, in addition to new sources, applied to modifications of existing facilities that created new or increased pollution. Indeed, section 111(a)(2) of the Act stated that NSPS would apply to

any stationary source, the construction or modification of which is commenced after the publication of regulations (or, if earlier, proposed regulations) prescribing a standard of performance under this section which will be applicable to such source.

42 U.S.C. § 7411(a)(2) (emphasis supplied). Congress then defined “modification” as

any physical change in, or change in the method of operation of, a stationary source which increases the amount of any air pollutant emitted by such source or which results in the emission of any air pollutant not previously emitted.

42 U.S.C. § 7411(a)(4) (emphasis supplied).

Subsequently, faced with only varying degrees of success in controlling pollution in different parts of the country, Congress enacted the Clean Air Act Amendments of 1977, Pub.L. No. 95-95, 91 Stat. 685 (codified at 42 U.S.C. §§ 7401-7642 (1982)). Congress revised the NSPS so that regulated sources of pollution would have to use “the best system of continuous emission reduction which (taking into consideration the costs of achieving such emission reduction, and any nonair quality health and environmental impact and energy requirements) the Administrator determines has been adequately demonstrated....” 42 U.S.C. § 7411(a)(1)(C). In addition, Congress added a program for the Prevention of Significant Deterioration (“PSD”), concerned with increases in total annual emissions, to ensure that operators of regulated sources in relatively unpolluted areas would not allow a decline of air quality to the minimum level permitted by NAAQS. Air quality is preserved in this program by *905 requiring sources to limit their emissions to a "baseline rate”; regulated owners or operators in areas that have attained NAAQS must obtain a permit before constructing or modifying facilities. 42 U.S.C. § 7475(a)(1). Congress also essentially adopted its NSPS definition of “modification” for the PSD program. 42 U.S.C. § 7479(2)(C).

From this statutory framework, the EPA promulgated regulations for both the NSPS and PSD programs. In this case, its regulations concerning modifications are central. The EPA defines “modification” in substantially the same terms used by Congress:

[A]ny physical or operational change to an existing facility which results in an increase in the emission rate to the atmosphere of any pollutant to which a standard applies shall be considered a modification within the meaning of section 111 [42 U.S.C. § 7411] of the Act.

40 C.F.R. § 60.14(a) (1988). To determine whether a physical change constitutes a modification for purposes of NSPS, the EPA must determine whether the change increases the facility’s hourly rate of emission. 40 C.F.R. § 60.14 (1988). For PSD purposes, current EPA regulations provide that an increase in the total amount of emissions activates the modification provisions of the regulations. 40 C.F.R. § 52.21(b)(3) (1988).

Even at first blush, the potential reach of these modification provisions is apparent: the most trivial activities — the replacement of leaky pipes, for example — may trigger the modification provisions if the change results in an increase in the emissions of a facility. As a result, the EPA promulgated specific exceptions to the modification provisions:

The following shall not, by themselves, be considered modifications under this part:
(1)Maintenance, repair, and replacement which the Administrator determines to be routine for a source category
(2) An increase in production rate of an existing facility, if that increase can be accomplished without a capital expenditure on that facility.
(3) An increase in the hours of operation ....

40 C.F.R. § 60.14(e) (1988) (NSPS program); see 40 C.F.R. § 52.21(b)(2)(iii) (1988) (PSD program). These regulations (and the statutes from which they derive) are the focal point of this case.

B. WEPCO’s Proposed Life-Extension Project

WEPCO’s Port Washington electric power plant is located on Lake Michigan north of Milwaukee, Wisconsin. The plant consists of five coal-fired steam generating units that were placed in operation between 1935 and 1950.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

West Virginia v. EPA
597 U.S. 697 (Supreme Court, 2022)
United States v. Missouri
229 F. Supp. 3d 906 (E.D. Missouri, 2017)
United States v. Duke Energy Corp.
5 F. Supp. 3d 771 (M.D. North Carolina, 2014)
United States v. DTE Energy Co.
711 F.3d 643 (Sixth Circuit, 2013)
New Jersey v. RRI Energy Mid-Atlantic Power Holdings, LLC
960 F. Supp. 2d 512 (E.D. Pennsylvania, 2013)
Emergency Services Billing Corp. v. Allstate Insurance
668 F.3d 459 (Seventh Circuit, 2012)
United States v. Eme Homer City Generation L.P.
823 F. Supp. 2d 274 (W.D. Pennsylvania, 2011)
State ex rel. Ohio Attorney General v. Shelly Holding Co.
946 N.E.2d 295 (Ohio Court of Appeals, 2010)
United States v. Cinergy Corp.
623 F.3d 455 (Seventh Circuit, 2010)
United States v. Westvaco Corp.
675 F. Supp. 2d 524 (D. Maryland, 2009)
National Parks Conservation Ass'n v. Tennessee Valley Authority
618 F. Supp. 2d 815 (E.D. Tennessee, 2009)
United States v. Alabama Power Co.
681 F. Supp. 2d 1292 (N.D. Alabama, 2008)
United States v. Cinergy Corp.
495 F. Supp. 2d 892 (S.D. Indiana, 2007)
Environmental Defense v. Duke Energy Corporation
549 U.S. 561 (Supreme Court, 2007)
United States v. East Kentucky Power Cooperative, Inc.
498 F. Supp. 2d 976 (E.D. Kentucky, 2007)
United States v. Cinergy Corporation
458 F.3d 705 (Seventh Circuit, 2006)
New York v. Environmental Protection Agency
443 F.3d 880 (D.C. Circuit, 2006)
United States v. Duke Energy Corp.
411 F.3d 539 (Fourth Circuit, 2005)

Cite This Page — Counsel Stack

Bluebook (online)
893 F.2d 901, Counsel Stack Legal Research, https://law.counselstack.com/opinion/wisconsin-electric-power-company-v-william-k-reilly-administrator-and-ca7-1990.