Syrett v. Reisner McEwin & Associates

24 P.3d 1070, 107 Wash. App. 524
Court of Appeals of Washington·Decided April 30, 2001·No. No. 46694-1-I·Published·Cited by 9 cases

Opinion

Becker, A.C.J.

A time limit provision in a marine survey contract excluded liability unless the customer gave notice of a claim within 90 days and filed suit within six months of the completion of the survey. The customer discovered concealed dry rot in his boat 18 months after the survey and filed suit against the surveyor 7 months after that. The trial court dismissed the suit on summary judgment. We affirm. The contractual notice and claim filing provision was a reasonable limitation on liability, given the object of the contract, because it allowed the customer sufficient time to ascertain any damages resulting from the transaction.

In the spring of 1997, Barry Syrett and his wife were considering the purchase of a 45-foot powerboat. Syrett hired Matthew Harris of Reisner, McEwin & Associates to perform a condition and valuation survey of the vessel. Just above the signature line the work order states: “I hereby authorize Reisner, McEwin & Assoc., Inc. to perform the professional services as requested and to issue a written report in accordance with the terms and conditions on the [526]*526reverse side of this form.” On the reverse side were 11 separate provisions printed in easily readable type, each captioned in bold face.

Item 5, captioned “Limited Report,” stated:

Customer is cautioned that this is a limited report representing a limited inspection by visual means and surroundings. Inspection of areas normally concealed, areas requiring disassembly of the vessel, scaling of masts, or the operation of equipment is specifically not included unless otherwise agreed upon in writing.

Item 6, “Limited Liability,” stated in part: “RM & A shall not be liable in any event for any loss, cost, penalty or damages in excess of $1,000.00,” and further stated that additional liability was negotiable: “It is understood by Customer that RM & A’s charges for services are based upon this limited liability. RM & A agrees to assume additional liabilities only if requested by Customer and a written agreement setting forth liabilities and additional charges are signed by both RM & A and Customer.”

Item 9, “Notice, Claim, Time Limits or Suit,” stated:

RM & A shall in no event be liable even on the limited basis identified above, unless notice of claim thereof is presented in writing to RM & A within ninety (90) days of completion of the work. Customer must also commence suit on any claim or controversy arising under this work order or the work performed pursuant to the work order, within six (6) months from completion of work.

Harris performed the survey on May 28, 1997. He conducted part of the survey with the boat in the water at its moorage, and part of it while the boat was underway between its moorage on Lake Union and a boatyard in the ship canal. When the boat was out of the water at the boatyard, Harris inspected the hull. Syrett paid $455 for the survey. Several days later, Harris submitted a written report to Syrett. The report described the boat and its equipment, estimated its value, listed recommended repairs and replacements, and generally assessed the boat to [527]*527be in good condition. Syrett purchased the boat.

In November of 1998, about a year and a half after the survey, Syrett took the boat to Anacortes for certain repairs and improvements. In the first week of January 1999, in the course of drilling a hole through one of the stringers, a worker discovered that wood inside of the fiberglass covering of a stringer was severely rotted.1 Further investigation revealed that other stringers were in the same condition. Syrett spent approximately $40,000 to replace the stringers. The repairs took approximately seven months.

Syrett filed suit against Reisner on August 9, 1999, alleging negligence and breach of contract. Reisner moved for summary judgment and the trial court granted the motion. The trial court ruled that the contractual limitation on the time to notify and bring suit was enforceable under admiralty law. Syrett appeals, contending that under both Washington and admiralty law, the limitation on liability and the notice and filing deadlines are unenforceable.

This court reviews an order of summary judgment de novo, considering the facts in the light most favorable to the nonmoving party. Reynolds v. Farmers Ins. Co., 90 Wn. App. 880, 884, 960 P.2d 432 (1998). Summary judgment is appropriate when “the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.” CR 56(c). This court may affirm summary judgment on any theory supported by the record. LaMon v. Butler, 112 Wn.2d 193, 200-01, 770 P.2d 1027 (1989).

NOTICE AND FILING PROVISION

Under Washington law, parties may agree to a shorter limitation on filing suit than the period of the [528]*528applicable statute of limitations. A stipulated limitation period will prevail unless prohibited by statute or public policy, or unless the provision is unreasonable. Yakima Asphalt Paving Co. v. Dep’t of Transp., 45 Wn. App. 663, 666, 726 P.2d 1021 (1986), review denied, 107 Wn.2d 1029 (1987). In Yakima Asphalt, this court held that a subcontractor’s suit against the state Department of Transportation was barred by a provision in the contract between the Department and the prime contractor requiring that any suit against the Department arising out of the contract had to be brought within 180 days from the date of the acceptance of the contract. We rejected the argument that the limitation period was unreasonable, seeing no reason why a contractor or subcontractor would be unable to assert a claim within the limitation period. Yakima Asphalt, 45 Wn. App. at 666. The limitation was held to be reasonable even though it required the subcontractor to bring suit before the completion of the project.

Syrett provides no explanation as to why the six month contractual limitation here should not similarly be viewed as reasonable. Instead, he argues that the contract provision at issue is unenforceable because he had a reasonable excuse for failing to bring his claim within the contractual period. His excuse is that he did not discover the defective stringers until after the contractual time period had expired. His argument hinges on a 1910 case, Sheard v. United States Fidelity & Guaranty Co., 58 Wash. 29, 107 P. 1024 (1910). In Sheard, a provision in a contractors’ bond required that any suit on the bond had to be filed by a specified date, seven months after the date of the building contract. Six months after the date of the building contract, the contractors became insolvent. A receiver who was appointed for them finished the buildings five months later, which was four months past the expiration of the limitation period. In a suit by the owner against the surety for indemnification for liens established against the owner’s property, the court held that the time limit was unenforceable because the performance which was secured by the [529]

Free access — add to your briefcase to read the full text and ask questions with AI

Syrett v. Reisner McEwin & Associates, 24 P.3d 1070, 107 Wash. App. 524 (Wash. Ct. App. 2001).

24 P.3d 1070 (Syrett v. Reisner McEwin & Associates) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Tadych v. Noble Ridge Constr., Inc.
Washington Supreme Court, 2022
EPIC, a non-profit corporation v. CliftonLarsonAllen LLP
199 Wash. App. 257 (Court of Appeals of Washington, 2017)
Mattingly v. Palmer Ridge Homes, LLC
157 Wash. App. 376 (Court of Appeals of Washington, 2010)
Nuhome Investments, LLC v. Weller
2003 WY 171 (Wyoming Supreme Court, 2003)
Syrett v. Reisner McEwin & Associates
24 P.3d 1070 (Court of Appeals of Washington, 2001)