Stoneman v. Wick Construction Co.

349 P.2d 215, 55 Wash. 2d 639, 1960 Wash. LEXIS 547
CourtWashington Supreme Court
DecidedFebruary 11, 1960
Docket34921
StatusPublished
Cited by23 cases

This text of 349 P.2d 215 (Stoneman v. Wick Construction Co.) is published on Counsel Stack Legal Research, covering Washington Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Stoneman v. Wick Construction Co., 349 P.2d 215, 55 Wash. 2d 639, 1960 Wash. LEXIS 547 (Wash. 1960).

Opinion

Rosellini, J.

This case is before the court upon the findings of fact, which have not been challenged. Briefly, they show that the appellant intervener, Sterling of Aurora, Inc., leased certain property abutting Aurora avenue, in Seattle, from W. Glenn Stoneman, under an agreement whereby Stoneman would construct a retaining wall and fill. Stoneman submitted his proposed plan to the firm of Shannon & Wilson, engineers and soil experts, who advised him that soil conditions on the property in question might be unstable and inadequate and that soil tests would have to be made before any wall was designed for the site.

Disregarding the counsel and advice of Shannon & Wilson, Stoneman procured the services of Peter Hostmark, an engineer, who, without adequate soil tests, and without knowledge of the opinion of Shannon & Wilson, prepared plans for a retaining wall and fill, which plans were accepted by Stoneman and were approved by the building department of the city of Seattle.

Stoneman then contracted with Wick Construction Company to build the retaining wall and fill according to the plans and specifications of Peter Hostmark. Wick Construction Company subcontracted certain structural steel work to Isaacson Iron Works.

After the job was completed, ruptures and breaks began to occur. These were repaired by the respondents with the approval of Stoneman’s agent, Peter Hostmark, and the city’s building department.

Immediately after acceptance of the work, Stoneman delivered possession of the premises to the appellant, Sterling of Aurora, Inc., which proceeded to erect thereon a gas station building and other gas station facilities. During the progress of the work, various cracks in the fill were *641 noticed. Large cracks appeared in the building and in the sidewalk around it. Shortly thereafter a loud noise was heard in the structure and one of the columns supporting it leaned forward, and the asphalt paving around it settled two or three feet. Thereafter, other parts of the structure failed and started to slide downhill, and the fill and east wall were eventually unloaded and removed by the city of Seattle.

These activities and occurrences caused damages to the property below Stoneman’s property, for which damages the owners were awarded judgment against Stoneman and against the respondents, Wick Construction Company and Isaacson Iron Works. No appeal has been taken from those judgments.

Sterling of Aurora, Inc., was awarded judgment against Stoneman, but its complaint against the respondents was dismissed, as was that of Stoneman. Stoneman has not appealed from that judgment of dismissal.

The appellant, Sterling of Aurora, Inc., contends that the failure of the retaining wall was caused by the negligence of the respondents, and that, under the doctrine enunciated by this court in Freeman v. Navarre, 47 Wn. (2d) 760, 289 P. (2d) 1015, it is entitled to recover its damages from the respondents. We held in that case that a manufacturer may be liable to an owner of property for negligent manufacture of materials used in a construction job even though no privity of contract exists between them.

Assuming the correctness of the appellant’s contention that this rule is equally applicable in the case of a contractor or subcontractor who negligently performs his contract to the injury of a third person, there is nevertheless a fatal defect in the appellant’s case as it is brought to this court. The findings do not show that the respondent Wick Construction Company negligently performed its contract, nor are they clear that the respondent Isaacson Iron Works was guilty of negligence and furthermore, they do not show that any acts of the respondents were a proximate *642 cause of the damage. The significant findings as to the cause of the failure of the retaining wall are as follows:

“That the history of slides along the easterly portion of Queen Anne Hill, particularly the areas immediately north and south of subject property, and on Lot 4 in 1934, was such as to put reasonable engineering men on notice of the possibility of slides. That the standard of engineering practice in Seattle at the time of the proposed erection of the retaining wall was such as to require sub-soil explorations and laboratory tests on samples of soil. That the design of the wall and fill was made without adequate investigation of the assumptions upon which it was based, namely that of absolute stability. That the design for the retaining wall and fill did not conform to the standard of engineering practice for such a wall in this area in that it was designed on the basis of soil stability and on the theory that the pressure behind the fill would not exceed that of dry earth and in that no adequate provisions were made for keeping the earth dry from rain or subsurface percolating waters, or by compensating for the condition of the wet earth by appropriate design factors to retain such pressures resulting from water. That the earth became wet and developed pressures behind the wall in excess of its design strength. That, in fact, the strength and stability of the soil under the retaining wall and fill was insufficient for the load imposed. (Italics ours.)

“That, assuming instability of the foundations to the extent of slight vertical and horizontal movement down and easterly, which was within the standard of engineering practice for retaining walls to permit the elastic movement of soil, the design here did not permit such slight movement, and it failed to allow for the controlling of moment pressures created by any bending stresses other than those inherent in the construction of the welds and connections themselves, such as would be permitted in a chain or socket joint arrangement, as distinguished from rigidly fixed straps or bars.

“That Mr. Stoneman negligently failed to act as a reasonable man would in failing to inform Mr. Hostmark of the Shannon & Wilson report on the necessity for soil investigation.

“That Mr. Stoneman, by virtue of Peter Hostmark’s approval, City approval, and inspection by the independent supervisors of Stoneman, approved the welds and splice detail, as they were shown on the Isaacson shop plans, *643 plaintiff’s Exhibit 6, to the extent the same varied from the original design of Hostmark.

“That the proximate causes of the failure of this retaining wall were: (a) Instability of the subsurface soil to bear the structure placed on it; (b) Insufficiency of the design to contain the pressures created; and (c) Some inferior welds in the steel fabrication.

“The work required by the Wick Construction Company contract, under its contract, was substantially performed, delivered to and accepted by Stoneman.

“That plaintiff Stoneman built a structure which, due to the instability of soil and improper assumptions of design, was destined to fail, regardless of defects in welds. That had the same not failed on or about July 28, 1956, or about March 22, 1957, by reason of such defective welds, the same would have failed in close proximity to said dates. That Stoneman received what he bargained for in his contract, namely, a structure destined to fail.”

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Mohr v. Grantham
262 P.3d 490 (Washington Supreme Court, 2011)
Rounds v. Nellcor Puritan Bennett, Inc.
147 Wash. App. 155 (Court of Appeals of Washington, 2008)
Fabrique v. Choice Hotels International, Inc.
144 Wash. App. 675 (Court of Appeals of Washington, 2008)
Fabrique v. CHOICE HOTELS INTERN., INC.
183 P.3d 1118 (Court of Appeals of Washington, 2008)
Childs v. Allen
105 P.3d 411 (Court of Appeals of Washington, 2005)
Sternberg v. Debuys
967 F.2d 591 (Ninth Circuit, 1992)
Safeco Insurance Co. of America v. Hirschmann
112 Wash. 2d 621 (Washington Supreme Court, 1989)
SAFECO INSURANCE CO. OF AM. v. Hirschmann
773 P.2d 413 (Washington Supreme Court, 1989)
Safeco Insurance Co. of America v. Hirschmann
760 P.2d 969 (Court of Appeals of Washington, 1988)
Wojcik v. Chrysler Corporation
751 P.2d 854 (Court of Appeals of Washington, 1988)
Burgess Farms v. New Hampshire Insurance Group
702 P.2d 869 (Idaho Court of Appeals, 1985)
Graham v. Public Employees Mutual Insurance
656 P.2d 1077 (Washington Supreme Court, 1983)
Bernethy v. Walt Failor's, Inc.
653 P.2d 280 (Washington Supreme Court, 1982)
Van Cleve v. Betts
559 P.2d 1006 (Court of Appeals of Washington, 1977)
Litts v. Pierce County
515 P.2d 526 (Court of Appeals of Washington, 1973)
Foster v. Bylund
503 P.2d 1087 (Court of Appeals of Washington, 1972)
Ferrin v. Donnellefeld
444 P.2d 701 (Washington Supreme Court, 1968)
Ross v. Altvater
431 P.2d 701 (Washington Supreme Court, 1967)

Cite This Page — Counsel Stack

Bluebook (online)
349 P.2d 215, 55 Wash. 2d 639, 1960 Wash. LEXIS 547, Counsel Stack Legal Research, https://law.counselstack.com/opinion/stoneman-v-wick-construction-co-wash-1960.