Sprenger v. Public Service Commission

926 A.2d 238, 400 Md. 1, 2007 Md. LEXIS 352
Court of Appeals of Maryland·Decided June 21, 2007·No. 125 Sept. Term, 2006·Published·Cited by 53 cases

Opinions

CATHELL, Judge.

This case arises from the approval by the Public Service Commission (the Commission) of a plan of Clipper Windpower (“Clipper”), to construct the Allegheny Heights Windpower Facility (the “Facility”) in Garrett County, Maryland. Paul C. Sprenger and Rebecca Harvey,1 petitioners, filed an action for declaratory relief in the Circuit Court for Garrett County, asking that court to rescind two Commission orders. The first order approved Clipper’s plan to build the Facility, and the [5] second denied a request for rehearing on the approval of the Facility. The Circuit Court for Garrett County denied petitioners’ action for declaratory relief, and they appealed to the Court of Special Appeals. In a reported opinion, that court affirmed the judgment of the Circuit Court. Sprenger v. Public Service Comm’n, 171 Md.App. 444, 910 A.2d 544 (2006). This Court granted certiorari to consider the following questions:

“I. IS AN INTERESTED PERSON WHO IS ADVERSELY IMPACTED BY AN ORDER OF THE PUBLIC SERVICE COMMISSION ENTITLED TO BRING AN ACTION FOR DECLARATORY RELIEF IF THE PUBLIC SERVICE COMMISSION FAILS TO PROVIDE REQUIRED NOTICE AND THE TIME TO FILE AN APPEAL FROM THE PUBLIC SERVICE COMMISSION ORDER HAS EXPIRED?
“II. DOES A CIRCUIT COURT HAVE JURISDICTION TO CONSIDER AND TRY THE SAME ISSUES RAISED BUT NOT TRIED IN ANOTHER CIRCUIT COURT IN AN ACTION DISMISSED AS UNTIMELY IF THE ISSUE OF TIMELINESS, NOT THE LACK OF NOTICE ISSUE RAISED IN BOTH CASES, IS PENDING IN AN APPELLATE COURT?”

Sprenger v. Public Service Comm’n, 396 Md. 524, 914 A.2d 768 (2007). We answer the first question in the negative and affirm the judgment of the Court of Special Appeals.2

I. Facts

This case is the second of two cases, both challenging the process by which the Facility was approved, to reach this Court. As our decision in this case, the second one, is inexorably linked to the first case, we shall summarize the background of that case before reviewing the facts relevant to [6] the present case. For clarity’s sake we will refer to the first case as “Clipper I”3 and, when necessary, we will refer to this case as “Clipper II.”

Clipper I

In Clipper I, filed earlier, we summarized the relevant facts as follows:

“On August 26, 2002, Clipper filed an application with the Commission seeking authorization to build a wind turbine facility for the purpose of generating electricity. As required, Clipper notified the public of its application to build the facility, and the date, time, and location of a scheduled pre-hearing conference by publishing a notice in both The Republican and The Cumberland Times-News, generally circulated newspapers in Garrett County, on the successive weeks of September 26, 2002, September 30, 2002, October 3,2002, and October 6,2002.3 [4]
“The wind turbine facility was to be composed of up to 67 individual turbines. Each turbine would consist of a freestanding tower approximately 262 feet in height. A rotor, having a diameter not in excess of 262 feet (80m) (39m blades), would be attached to the tower. The maximum combined height would be approximately '394 ft (120 m) with one blade in the vertical position.’ Clipper’s executive summary of its proposal for the facility implied that some, but not all, of the turbines would be of that size and stated that all 67 turbines may not need to be built depending upon ‘factors ... not identified prior to [the] start of construction.’ In addition to the tower and the blade, each turbine would consist of a foundation anchoring it to the ground and a transformer that would collect the power from the turbines and transfer it to a substation through an ‘underground electrical collection system.’ All-weather gravel ser[7] vice roads would be built from existing hardtop roads and the cables associated with the electrical collection system were to be buried alongside such service roads. The total project area would cover approximately 10.8 miles and would be constructed on Backbone Mountain extending from ‘Wild Turkey Rock at an elevation of 3,228 ft (984 m) above sea level southwestward to Allegheny Heights at 3,200 ft (975 m).’ Although three other sites were surveyed, Allegheny Heights was selected ‘because of wind resource potential and favorable site characteristics (primarily contiguous, well-exposed areas and proximity to three transmissionlines).’ [5]
“An adjudicatory hearing[6] regarding Clipper’s proposal, at which attendance was high, ‘standing room only,’ was held. Clipper, the Department of Natural Resources’s Power Plant Research Program, the staff of the Commission, and the Office of People’s Counsel were the named parties to the proceeding. Pursuant to PUC § 3-106, four individual members of the public intervened and were granted party status.[7] Among those in attendance were respondents Eric Tribbey and Russell Bounds.... Although both Tribbey and Bounds submitted citizen comment letters following the conclusion of the hearing, neither they, nor Friends[8] sought to intervene.

[8] “The hearing examiner issued a proposed order that contained and recommended settlement conditions to which all of the parties had agreed, which the Commission subsequently adopted. It issued a final order (Order No. 78354) approving Clipper’s plan.

“Tribbey, then, writing on behalf of Friends, submitted a letter to the Commission requesting a rehearing. The Commission, by Order No. 78617, denied the request, explaining:

Free access — add to your briefcase to read the full text and ask questions with AI

Sprenger v. Public Service Commission, 926 A.2d 238, 400 Md. 1, 2007 Md. LEXIS 352 (Md. 2007).

926 A.2d 238 (Sprenger v. Public Service Commission) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Comptroller v. Comcast
297 A.3d 1211 (Court of Appeals of Maryland, 2023)
Sanders v. Bd. of Education, Harford Cnty.
265 A.3d 1083 (Court of Appeals of Maryland, 2021)
Norino Properties v. Balsamo
Court of Special Appeals of Maryland, 2021
Stefanowitz v. Redmer
D. Maryland, 2021
Bd. of Education v. Sanders
248 A.3d 1108 (Court of Special Appeals of Maryland, 2021)
Balt. City Police Dept. v. Esteppe
236 A.3d 808 (Court of Special Appeals of Maryland, 2020)
Holzheid v. Comptroller
Court of Special Appeals of Maryland, 2019
Holzheid v. Comptroller of the Treasury of Md.
205 A.3d 43 (Court of Special Appeals of Maryland, 2019)
Myers v. Commissioners for Carroll County, MD.
Court of Special Appeals of Maryland, 2019
Myers v. Board of Commissioners for Carroll County, MD.
203 A.3d 69 (Court of Special Appeals of Maryland, 2019)
Blackstone v. Sharma
Court of Appeals of Maryland, 2018
Dabbs v. Anne Arundel Cnty.
182 A.3d 798 (Court of Appeals of Maryland, 2018)
Jesus Christ is the Answer Ministries, Inc. v. Balt. Cnty.
303 F. Supp. 3d 378 (D. Maryland, 2018)
Hanover Investments, Inc. v. Volkman
165 A.3d 497 (Court of Appeals of Maryland, 2017)
Elvaton Towne Condominium Regime II, Inc. v. Rose
162 A.3d 1027 (Court of Appeals of Maryland, 2017)
Dabbs v. Anne Arundel County
157 A.3d 381 (Court of Special Appeals of Maryland, 2017)
Volkman v. Hanover Investment, Inc.
126 A.3d 208 (Court of Special Appeals of Maryland, 2015)
Holden v. University System of Maryland
112 A.3d 1100 (Court of Special Appeals of Maryland, 2015)
Havilah Real Property Services, LLC v. Early
88 A.3d 875 (Court of Special Appeals of Maryland, 2014)
Mummert v. Alizadeh
77 A.3d 1049 (Court of Appeals of Maryland, 2013)