Selby v. J. A. Jones Const. Co.

175 F.2d 143, 1949 U.S. App. LEXIS 3391, 16 Lab. Cas. (CCH) 65,177
CourtCourt of Appeals for the Sixth Circuit
DecidedMay 27, 1949
DocketNo. 10788
StatusPublished
Cited by11 cases

This text of 175 F.2d 143 (Selby v. J. A. Jones Const. Co.) is published on Counsel Stack Legal Research, covering Court of Appeals for the Sixth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Selby v. J. A. Jones Const. Co., 175 F.2d 143, 1949 U.S. App. LEXIS 3391, 16 Lab. Cas. (CCH) 65,177 (6th Cir. 1949).

Opinion

HICKS, Chief Judge.

R. C. Selby and numerous other plaintiffs brought suit in the District Court under Sec. 16(b) of the Fair Labor Standards Act of 1938, Ch. 676, 52 Stat. 1060, 29 U.S.C.A. § 201 et seq., as employees of appellee, J. A. Jones Construction Company, to recover overtime compensation, liquidated damages, attorneys’ fees and costs. The court dismissed the action upon the pleadings and a stipulation of facts; hence this appeal.

In December 1941 the nation went to war. ■ Its very existence was imperiled — the struggle was merciless. The manpower and resources of the nation were placed at its disposal. Men thought, • worked, planned and hoped for victory. Scientists declared that anatomic weapon could be made; the Government set about to make it and in the course of time such a bomb was produced at a cost of more than two billion dollars. Its production was the greatest scientific achievement in the history of warfare. , It was a deadly instrumentality of war and Hiroshima and Nagasaki attested its effectiveness. It quickly brought the conflict to a close.

The material facts, as stipulated, disclosed that: As a part of this effort, the Government in September 1942 began to develop the Clinton Engineering Works, commonly called Oak Ridge, which was a unit of the Manhattan District established under the War Powers Act and Executive Orders of the President to carry on research and develop an atomic bomb. The Manhattan District was under the direction of the United States Army Corps of Engineers; and the bomb was the objective. ■

This was a gigantic undertaking. The Oak Ridge project consisted of a site of more than seventy square miles, acquired by the United States and located along the Clinch River in Tennessee, upon which arose a great array of new plants, new residential districts and a new city, all of which were hurriedly erected and devoted directly or indirectly to the development of the bomb.

From June 1944 to January 11, 1946, ap-pellee, a corporation operating under a contract with the United States dated May 18, 1943, was engaged in the construction, re-modelling and modification of certain structures that were a part of the Clinton Engineering Works. During varying periods between the dates above mentioned, those of the appellants who were employees of appellee normally worked in excess of forty hours and were not compensated in accordance with a provision of Sec. 7 of the Fair Labor Standards Act.

Between June 1944 and March I, 1945, certain buildings constructed by appellee under its contract were completed and turned over to the operating company, which was under contract with the United States to process materials to be used as component parts of the bomb. None of the buildings completed during this period were constructed for use directly in processing purposes but were constructed for cafeterias, dispensaries, etc.

Among other buildings erected by appel-lee was a large structure built and used for the processing of materials to be used as component parts or elements of the bomb. This structure was built in sections and as each section was completed it was turned over to the operating company for processing materials while the construction continued upon the uncompleted portions of the building. The first of these sections was turned over for operation in March 1945 and some of the appellants were engaged on the uncompleted sections in various non-manual duties, such as Inspector Specialists. Subsequently, certain other sections were turned over to the operating company and the processing of materials was commenced therein before all the construction work had been completed, and in such instances some of the appellant-employees re-entered such section from time to time and were engaged in various non-manual duties such as Inspector Specialists.

[145]*145In certain instances, about May 2, 1945, and thereafter, appellant-employees re-entered sections of the building after it had been completed and turned over to the operating company, and after processing operations had been commenced, for the purpose of altering the construction or moving and changing machinery and equipment.

Materials to be processed by the operating company were transported to Oak Ridge, Tenn., from points beyond the State and after they had been processed were sent to destinations beyond the State. These materials before, during and after processing, remained at all times the property of the United States. The movement of the materials into the State and of the processed materials beyond the State were under the supervision and control of the Army and were at no time in the custody of a common carrier. All of the activities at Oak Ridge engaged in by appellants, appellee, the operating company and the Army, had as their legitimate object the manufacture and completion of the atomic bomb.

The structures in question, from work upon which appellants’ claims are based, included “a power plant, main process plant, and certain auxiliary facilities, including installation of necessary power process and auxiliary facilities, roadways, rail connections, fences and site improvements, including utilities and construction facilities.”

Appellee contends that appellants’ claims are barred by Sec. 9 of the Portal-to-Portal Act, Ch. 52, Pub.Law 49, May 14, 1947, 29 U.S.C.A. § 258. This contention is made here for the first time and we think it is without merit. The stipulation fairly indicates that the activities for which appellants claim compensation were compensable by a custom or practice in effect at the time they were employed and were therefore excepted from the bar established by Sec. 2(a) and (d) of the Portal-to-Portal Act, 29 U.S.C.A. § 252(a, d). See Michigan Window Cleaning Co. v. Martino et al., 6 Cir., 173 F.2d 466. Appellants’ rights to compensation for minimum wages or overtime pay falls within the scope of Sec. 9 of the Portal-to-Portal Act. Under the provisions of this section such claims are not barred unless appellee pleads and proves that its failure to pay “was in good faith in conformity with and in reliance on any administrative * * * practice or enforcement policy of any such agency with respect to the class of employers to which he belonged.”

Paragraph 7 of the stipulation and the exhibits thereto show that circular letter No. 2390, dealing with the pay policy established for non-manual employees on Government cost-plus-a-fixed-fee-construction contracts was promulgated by the Chief of the Labor Relations Branch of the Construction Division of the Corps of Engineers of the War Department, and the same paragraph of the stipulation and the exhibits thereto also show that the War Department Wage Administration Agency approved the job classification, rate of pay, and pay policy of the Chief Inspector Specialists and Inspector Specialists who were employed under the contract. But appellee’s difficulty admitted in its brief, is, that there is no distinct showing that these regulations, rulings and approval were relied upon by it in the establishment of the pay policy followed by it in its relation with appellants. We cannot therefore say that appellee has, upon the facts, brought itself within the provisions of Sec. 9 of the Portal-to-Portal Act.

Our remaining question is, whether appellants as employees of appellee have brought themselves within the scope of the Fair Labor Standards Act, Title 29 U.S.C.A. Ch. 8, § 206.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Bengochea v. Ruiz Torres
103 P.R. Dec. 68 (Supreme Court of Puerto Rico, 1974)
Wirtz v. Hartley's, Inc.
245 F. Supp. 101 (S.D. Florida, 1965)
Reed v. Murphy
232 F.2d 668 (Fifth Circuit, 1956)
Mitchell v. H. B. Zachry Co.
127 F. Supp. 377 (D. New Mexico, 1955)
Shaeffer v. Fraser-Brace Engineering Co.
104 F. Supp. 871 (D. Tennessee, 1952)
Patton v. Roane-Anderson Co., Inc
192 F.2d 965 (Sixth Circuit, 1951)
Cooper v. Rust Engineering Co.
181 F.2d 107 (Sixth Circuit, 1950)
Cooper v. Rust Engineering Co.
84 F. Supp. 149 (W.D. Kentucky, 1949)

Cite This Page — Counsel Stack

Bluebook (online)
175 F.2d 143, 1949 U.S. App. LEXIS 3391, 16 Lab. Cas. (CCH) 65,177, Counsel Stack Legal Research, https://law.counselstack.com/opinion/selby-v-j-a-jones-const-co-ca6-1949.