Salt River Project Agricultural Improvement And Power District v. United States

762 F.2d 1053, 246 U.S. App. D.C. 74, 1985 U.S. App. LEXIS 31410
CourtCourt of Appeals for the D.C. Circuit
DecidedMay 31, 1985
Docket83-2331
StatusPublished
Cited by13 cases

This text of 762 F.2d 1053 (Salt River Project Agricultural Improvement And Power District v. United States) is published on Counsel Stack Legal Research, covering Court of Appeals for the D.C. Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Salt River Project Agricultural Improvement And Power District v. United States, 762 F.2d 1053, 246 U.S. App. D.C. 74, 1985 U.S. App. LEXIS 31410 (D.C. Cir. 1985).

Opinion

762 F.2d 1053

246 U.S.App.D.C. 74

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER
DISTRICT, Petitioner,
v.
UNITED STATES of America and Interstate Commerce Commission,
Respondents,
Southern Pacific Transportation Company, Intervenor.

No. 83-2331.

United States Court of Appeals,
District of Columbia Circuit.

Argued Jan. 11, 1985.
Decided May 31, 1985.

Petition for Review of an Order of the Interstate Commerce commission.

Richard S.M. Emrich, Chicago, Ill., for petitioner.

Henri F. Rush, Associate Gen. Counsel, I.C.C., Washington, D.C., with whom J. Paul McGrath, Asst. Atty. Gen., Robert S. Burk, Acting Gen. Counsel, I.C.C., John J. Powers, III, George Edelstein, Attys., Dept. of Justice, Timm L. Abendroth, and Lawrence H. Schecker, Attys., I.C.C., Washington, D.C., were on the brief, for respondents. John P. Fonte, Atty., Dept. of Justice, Washington, D.C., also entered an appearance for respondent U.S. of America.

Louis P. Warchot, San Francisco, Cal., with whom Stuart E. Vaughn, Chicago, Ill., was on the brief, for intervenor. Thormund A. Miller, San Francisco, Cal., also entered an appearance for intervenor.

Before TAMM and WALD, Circuit Judges, and MacKINNON, Senior Circuit Judge.

Opinion for the court filed by Circuit Judge TAMM.

Concurring opinion filed by Circuit Judge WALD.

TAMM, Circuit Judge:

Salt River Project Agricultural Improvement and Power District (Salt River) petitions this court to review a final decision of the Interstate Commerce Commission (ICC or Commission) that Southern Pacific Transportation Company (Southern Pacific) lacks market dominance. As a result of its market dominance determination, the ICC lacks jurisdiction under 49 U.S.C. Sec. 10709(b) (1982) to determine the reasonableness of the rail rates charged by Southern Pacific for delivery of fuel oil from three refineries in California to two of Salt River's fourteen generating facilities in Arizona. Salt River contends, inter alia, that the ICC's determinations are arbitrary and capricious and not supported by substantial evidence. We agree that the ICC's findings on intramodal and intermodal competition lack record support, but we uphold its determination that Southern Pacific lacks market dominance on the basis of the ICC's findings on product and geographic competition.

I. BACKGROUND

Salt River, a political subdivision of the State of Arizona, is a public utility providing electricity to over 341,000 residential, commercial, industrial, and agricultural customers in Maricopa, Gila, and Pinal Counties. It generates power at 14 generating stations with an aggregate generating capacity of 3,156 megawatts. Six of the plants burn coal, five use hydro power, and the other three can burn either fuel oils or natural gas.

Salt River generates power at three levels. Its base load is generated by its coal burning plants. When demand exceeds these plants' capacity, power is supplied by its intermediate level units. When the output of the intermediate units is exceeded in emergencies or during sudden but short demand surges, Salt River's peak load units are activated.

The two plants involved in this case, which together account for approximately 19% of Salt River's generating capacity, are the Kyrene Steam Plant at Helena, Arizona, and the Santan Generating Plant at Gilbert, Arizona. Kyrene consists of two steam units that use either residual fuel oil or natural gas, and four simple cycle combustion turbines that burn either distillate fuel oil or natural gas. The Kyrene steam units operate at the intermediate level and the turbines operate at the peak level. The Santan plant consists of four combined cycle turbines, similar to the Kyrene combustion turbines. Until 1981, Santan could use only distillate fuel oil. In that year, however, the plant was converted and can now burn either distillate fuel oil or natural gas. The Santan turbines operate at the peak level.

The distillate and residual fuel oils used by Salt River must meet exact specifications to protect its generating equipment and satisfy environmental emission standards. In recent years, it has obtained suitable distillate fuel oil from nine refineries and residual fuel oil from twelve refineries. Salt River transports fuel oil to Kyrene and Santan via pipeline, rail, and truck. The preferred mode of transportation for distillate fuel oil is via Southern Pacific Pipe Lines, Inc. (SPPL), an affiliate of Southern Pacific. SPPL can move distillate from Watson and Norwalk, California to Salt River's tank farm in Phoenix. The distillate is then trucked to Santan and Kyrene. SPPL also has an east line to Phoenix from El Paso, Texas. The aggregate pipeline-truck transportation cost is far lower than transporting oil via rail or truck.

Salt River prefers to transport the remainder of its distillate and, because residual fuel oil cannot be transported by pipeline, all its residual shipments by rail. Consistent with that preference, Salt River maintains its own fleet of 193 Jumbo Class (23,500 gallon) rail tank cars. Southern Pacific can transport distillate and residual fuel oil from three refineries located in Bakersfield, Harperstown, and Maltha, California, to Salt River's Kyrene and Santan plants. The Atchison, Topeka and Santa Fe Railway Company (Santa Fe) serves each of the three origins, but not the destinations. For the remainder of its fuel oil needs, Salt River uses trucks. Because motor carrier rates are significantly higher than either pipeline-truck or rail rates, however, trucks are the least-preferred mode of transportation.

Salt River determines whether to use natural gas or fuel oils based on the price and availability of the fuels. In recent years, it has increasingly relied on natural gas because it is readily available and much less expensive than fuel oils.1 Consequently, Salt River last used Southern Pacific to transport fuel oils during the winter of 1979 when it experienced an emergency need for fuel after its coal supplies froze. Natural gas was curtailed so Salt River was forced to rely on oil. Joint Appendix (J.A.) at 23.

Even though it was not currently shipping oil via Southern Pacific, on March 27, 1981, Salt River filed a complaint challenging the reasonableness of Southern Pacific's rates on its routes from Bakersfield, Harperstown, and Maltha (hereinafter referred to as the Southern Pacific origins) to Kyrene and Santan. Unless Salt River filed its complaint at that time, Southern Pacific's rates would have been deemed reasonable under the recently passed Staggers Rail Act of 1980 (Staggers Act), Pub.L. No. 96-448, 94 Stat. 1895 (codified at 49 U.S.C. Secs. 10101a et seq. (1982)). Section 229 of the Staggers Act allowed shippers and receivers 180 days from the effective date of the Act (October 1, 1980) to challenge the reasonableness of existing railroad rates. See 49 U.S.C. Sec. 10701a note (1982); Arizona Public Service Co. v. United States, 742 F.2d 644, 647 (D.C.Cir.1984).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
762 F.2d 1053, 246 U.S. App. D.C. 74, 1985 U.S. App. LEXIS 31410, Counsel Stack Legal Research, https://law.counselstack.com/opinion/salt-river-project-agricultural-improvement-and-power-district-v-united-cadc-1985.