Parrish v. LAYTON CITY CORPORATION

542 P.2d 1086, 1975 Utah LEXIS 801
Utah Supreme Court·Decided November 20, 1975·No. 14018·Published·Cited by 16 cases

Opinions

MAUGHAN, Justice: '

Plaintiff initiated this action to obtain damages and injunctive relief for the flooding of his property situated in Layton, Utah. In his complaint, plaintiff alleged that he had filed a verified claim with defendant on July 26, 1973, and that part of the damages he had sustained were incurred within 90 days immediately preceding the filing of his claim. Plaintiff pleaded that defendant had denied his claim; that the condition causing damages to his property still existed; and that his property remained in peril of further damage from flooding.

In his first claim, plaintiff alleged that, in the vicinity of his home, defendant had abandoned a sewer drain and left it unplugged, that during the rainy season (particularly during the latter part of April and continuing through May, 1973), water collected in the sewer drain, saturating plaintiff’s property, causing the house and yard to sink. Plaintiff’s home suffered structural damage; and his basement, where he maintained a rental unit, was inundated with water.

In his second claim, plaintiff alleged that defendant had been in the process of constructing a drainage facility known as Kays Creek Canal during a period extending from summer of 1970 to July, 1973. [1087] Allegedly, during April and May, defendant deposited trash material upon plaintiff’s property, destroying the use and enjoyment of this property. Furthermore, defendant allegedly removed top soil (valued at $3,000 by plaintiff) from his property. Plaintiff alleged that prior to the construction of the canal he had an elaborate drainage system, which removed excess water from his property. Upon conclusion of construction of the canal, the drains were not replaced and plaintiff’s property was left without proper means of drainage. Plaintiff further alleged that defendant had hewn down an apricot tree and grape vines during the construction of the canal within the 90-day period preceding the filing of his verified claim.

In his prayer, plaintiff sought damages of $8,320. He further sought a mandatory injunction requiring defendant to connect plaintiff’s drains to the flood canal and to disconnect, plug, or remove the sewer drain so that water would not continue to be funneled in and around plaintiff’s house.

In its answer, defendant pleaded that plaintiff had failed to file timely a verified claim as provided in section 10-7-77, U.C. A., 1953, and his claim was, therefore, barred. As a separate defense, defendant asserted that plaintiff had failed to comply wtih the provisions of section 63-30-13, U.C.A. 1953, and the claim was thus barred. Finally, defendant alleged that under the doctrine of res judicata, plaintiff’s claim was barred, since plaintiff had previously filed an action in Davis County, Civil No. 17649, entitled Walter F. Parrish v. Layton City Corporation and Utah State Road Commission; that in this prior action, a judgment pursuant to a motion to dismiss was granted on October 1, 1973; and defendant subsequently dismissed his appeal from this judgment, by stipulation on June 13, 1974.

Defendant then made a motion for summary judgment on the ground that the pleadings on file in the instant action and the pleadings on file in Civil No. 17649 show there was no genuine issue as to any material fact and that defendant was entitled to judgment as a matter of law.

The trial court granted defendant’s motion for summary judgment on the ground that plaintiff was barred from recovery by the doctrine of res judicata, and by plaintiff’s continued failure to comply with the notice of claim provisions of the Utah Governmental Immunity Act.

A survey of the record reveals that defendant never submitted a copy of the pleadings and judgment in Civil No. 17649 to the trial court, either in its pleadings1 or in company with its motion for summary judgment. The mere fact that there was a record of another action on file in the clerk’s office did not place these records in evidence.2 Rule 68(1) and (3), U.R.E., and Rule 44(a) and (d), U.R.C.P., provide the methods by which a judicial record may be proved. Since the record of the prior action was not before the trial court, there is no basis to sustain the determination that plaintiff’s claim was barred by the doctrine of res judicata.

In his complaint, plaintiff alleged he had sustained certain damages within the 90-day period immediately preceding the filing of his verified claim with the city. These facts were denied in defendant’s answer and remained contested issues of fact. Since defendant’s motion for summary judgment was based solely on its pleadings and was not made and supported as provided in Rule 56(c), U.R.C.P., plaintiff could rest on the allegations in his pleadings (Rule 56(e), U.R.C.P.).

There is one other aspect of the instant action which merits clarification, the applicable notice provision of the Utah Governmental Immunity Act.

[1088] Section 63-30-13, U.C.A.19S3, as amended 1965, provides:

A claim against a political subdivision shall be forever barred unless notice thereof is filed within ninety days after the cause of action arises; provided, however, that any claim filed against a city or incorporated town under section 63-30-8 shall be governed by the provisions of section 10-7-77, Utah Code Annotated, 1953.

Section 63-30-8 provides:

Immunity from suit of all governmental entities is waived for any injury caused by a defective, unsafe, or dangerous condition of any highway, road, street, alley, crosswalk, sidewalk, culvert, tunnel, bridge, viaduct or other structure located thereon.

Under Section 63-30-13, it is only the structures specified or structures located thereon in Section 63-30-8 which fall within the ambit of Section 10-7-77, U.C.A. 1953. Defendant in its answer asserted that plaintiff had neither filed a verified claim as provided in Section 10-7-77, nor had he complied with Section 63-30-13. Significantly, plaintiff had filed his verified claim July 26, 1973. Section 10-7-77 was amended in 1973, and as of May 8, 1973, this statute no longer required verification and further it extended the time in which to file a claim from 30 days to six months after occurrence of injury caused by a condition of the structures specified. Since the trial court cited the entire Chapter 30 of Title 63 in its determination that plaintiff had failed to comply with the claim provisions therein, it is impossible to ascertain which provision was considered applicable, viz. the 90-day period of Section 63-30-13, or the six-month period of Section 10-7-77, as it is incorporated into Section 63-30-13, in regard to the structures designated in Section 63-30-8.

Free access — add to your briefcase to read the full text and ask questions with AI

Parrish v. LAYTON CITY CORPORATION, 542 P.2d 1086, 1975 Utah LEXIS 801 (Utah 1975).

542 P.2d 1086 (Parrish v. LAYTON CITY CORPORATION) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Pepperwood Homeowners Ass'n v. Mitchell
2015 UT App 137 (Court of Appeals of Utah, 2015)
Advanced Forming Technologies, LLC v. Permacast, LLC
2015 UT App 7 (Court of Appeals of Utah, 2015)
In Re General Determination of Rights
2005 UT App 450 (Court of Appeals of Utah, 2005)
Busch v. Busch
2003 UT App 131 (Court of Appeals of Utah, 2003)
Lovendahl v. Jordan School District
2002 UT 130 (Utah Supreme Court, 2002)
Glencore, Ltd. v. Ince
972 P.2d 376 (Utah Supreme Court, 1998)
Stevensen v. Goodson
924 P.2d 339 (Utah Supreme Court, 1996)
Ringwood v. Foreign Auto Works, Inc.
786 P.2d 1350 (Court of Appeals of Utah, 1990)
Williams v. Carbon County Board of Education
780 P.2d 816 (Utah Supreme Court, 1989)
Thomas v. Clearfield City
642 P.2d 737 (Utah Supreme Court, 1982)
Searle Bros. v. Searle
588 P.2d 689 (Utah Supreme Court, 1978)
Parrish v. LAYTON CITY CORPORATION
542 P.2d 1086 (Utah Supreme Court, 1975)