Newmont Mines Limited and Esso Resources Canada Limited v. Hanover Insurance Company & Utica Mutual Insurance Company

784 F.2d 127, 1986 U.S. App. LEXIS 22517
CourtCourt of Appeals for the Second Circuit
DecidedFebruary 20, 1986
Docket330, Docket 85-7590
StatusPublished
Cited by150 cases

This text of 784 F.2d 127 (Newmont Mines Limited and Esso Resources Canada Limited v. Hanover Insurance Company & Utica Mutual Insurance Company) is published on Counsel Stack Legal Research, covering Court of Appeals for the Second Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Newmont Mines Limited and Esso Resources Canada Limited v. Hanover Insurance Company & Utica Mutual Insurance Company, 784 F.2d 127, 1986 U.S. App. LEXIS 22517 (2d Cir. 1986).

Opinions

MINER, Circuit Judge:

This action arises out of the collapse on two different days of two separate sections of the roof of a cooper concentrator mill building located at the Granduc minesite in Tide Lake, British Columbia, Canada, and the refusal of two of the building’s four insurers, Hanover Insurance Company (“Hanover”), and Utica Mutual Insurance Company (“Utica”),1 to indemnify the building’s owner, Newmont Mines Limited (“Newmont”), for the resulting losses. Hanover and Utica appeal from a final judgment in the amount of $2,500,000 (Canadian), plus prejudgment interest computed from February 20, 1980, entered after a jury trial in the United States District Court for the Southern District of New York, 609 F.Supp. 295 (Sprizzo, J.). The two insurers were found liable for failure to pay, under the terms of property damage insurance policies issued by them, for the expenses incurred by Newmont in the repair of the damaged building. The insurers’ primary contentions on this appeal are that they are not liable because the insured failed to inform them of a material increase in the risk and that, even if they are liable, the two collapses constituted one occurrence and thus the maximum amounts payable under the policies “for any one occurrence” should not have been calculated separately for each collapse. For the reasons set forth below, we affirm.

I. BACKGROUND

The Granduc minesite is located near the Alaskan border in an area of British Columbia subject to heavy snowfalls and substantial snow accumulation. The centerpiece of the minesite and the focus of this lawsuit is the concentrator facility: a huge wedge-shaped, multi-function structure with a sloping roof nearly fifteen stories high at its peak. The concentrator is 442 feet long by 240 feet wide and has a large roof with a slope length of approximately 500 feet. Due to the size of the concentrator, structural design principles required that an expansion joint be installed in the middle of the building to permit expansion and contraction to occur without causing damage. Consequently, the concentrator was designed and constructed as two adjacent structures, each approximately 220 feet long and each capable of supporting vertical and horizontal loads independent of the other. The two structures are separated in the middle by a double set of columns, located at what has been designated line G.

Because this region receives the highest annual snowfall in the world — as much as 1200 inches per year — the concentrator facility was specially designed to act as a giant snow slide, which would deposit snow from the roof into a catch basin at the base of the building. The roof was slanted at a thirty-degree angle, with the belief that this slope, together with the natural convection of heat generated in the building from ordinary operations, would cause the [130]*130snow to slide off the roof.2 Indeed, this system of removing snow from the concentrator’s roof was successful until the 1978-1979 winter.

Newmont owned and operated the concentrator from 1970 until mid-1978, when it ceased operations at the Granduc mine due to depressed economic conditions in the copper industry. Prior to closing the Granduc mine, and because the concentrator would no longer be in operation or heated, Newmont sought advice regarding appropriate snow clearance procedures from Swan Wooster Engineering (“Swan Wooster”), one of the engineering firms that participated in the design of the concentrator. Swan Wooster recommended periodic inspections of the concentrator and removal of snow accumulated in the catch basin at the base of the building. Newmont also discussed the cessation of operations with Allendale, one of the companies insuring the concentrator facility. By letter dated August 8, 1978, Newmont informed Allen-dale of its plans to permanently close the Granduc mine and its intended inspection and snow clearance program. No similar letter was sent to Hanover or Utica.

Thereafter, in accordance with Swan Wooster’s recommendations, Newmont personnel regularly inspected the concentrator and, when needed, removed accumulated snow from the base of the building. Beginning in mid-December 1978 and continuing thereafter, Newmont personnel observed that snow was not sliding from the roof. On March 1,1979, Kurt Dahlke, an employee of Newmont, inspected the concentrator, observed approximately eight to ten feet of snow on the roof, and reported: “Everything ok. No sliding, no build-up.”3

On the next inspection trip, on March 14th, Newmont personnel discovered that a section of the concentrator roof, measuring approximately 55 by 200 feet and located just below the midline of the concentrator (line G), had collapsed sometime between March 1st and March 14th. The collapse was due to the weight of ice and snow. On March 17th, a second section of the roof, measuring approximately eighty by seventy feet and located in the upper half of the building some seventy-five feet above the area of the first hole, collapsed due to the weight of ice and snow. Both collapses occurred in portions of the roof having a load capacity of 140 pounds per square foot.

Subsequently, on May 31, 1979, Newmont conveyed its title to the Granduc mine property, including the damaged concentrator, to Esso Resources Canada Limited (“Esso”) pursuant to a written agreement of purchase and sale. In a supplementary letter agreement, Newmont agreed to pursue its rights under its insurance policies and to hold any proceeds in trust for Esso. Thereafter, Esso repaired the damaged concentrator building at a total cost of approximately $6.6 million (Canadian).

The insurance policies issued by Hanover and Utica (as well as those issued by Adri[131]*131atic and Allendale) insured Newmont’s interest in various properties located in twelve different states of the United States and in British Columbia. The four insurance companies provided “layered” insurance coverage against a variety of perils, including that of collapse caused by the weight of ice and snow. The first layer of insurance was provided by the Hanover and Adriatic policies, each of which covered fifty percent of the first $500,000 (in excess of a $25,000 deductible) for any one occurrence. The Utica policy provided intermediate coverage of $1,000,000 in excess of $525,000 for any one occurrence. The Allendale policy provided a third layer of coverage with a $1,525,000 deductible for any one occurrence and a limit of liability of $9,189,000 for the Granduc mine property-

The terms and conditions of the Hanover and Utica policies were set forth in identical typewritten “manuscript” policies prepared by Newmont’s insurance broker, Johnson & Higgins. Representatives of Hanover and Utica reviewed and approved the terms of the manuscript policies and appended certain standard-form statutory conditions; the companies then issued the policies. In so doing, neither Hanover nor Utica inspected, either personally or through a representative, any of Newmont’s properties covered by the policies. Neither company made any inquiry of Newmont or its brokers regarding the properties, any special climatic conditions at any of the sites, or the design specifications of the buildings. Instead, Hanover and Utica were content in their knowledge that Allendale, the excess carrier, provided fire prevention and engineering services to Newmont and otherwise monitored the Granduc properties.

Newmont filed proof of claim with the four insurance companies in January of 1980.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

The Resource Group International Limited v. Chishti
91 F.4th 107 (Second Circuit, 2024)
Celsius Network LLC
S.D. New York, 2023
Molina v. City of Elmira
Second Circuit, 2019
United States v. Prevezon Holdings, Ltd.
289 F. Supp. 3d 446 (S.D. Illinois, 2018)
In Touch Concepts, Inc. v. Cellco Partnership
949 F. Supp. 2d 447 (S.D. New York, 2013)
Chesapeake Energy Corp. v. Bank of New York Mellon Trust Co.
957 F. Supp. 2d 316 (S.D. New York, 2013)
Drapkin v. Mafco Consolidated Group, Inc.
818 F. Supp. 2d 678 (S.D. New York, 2011)
Svensson v. Securian Life Insurance
706 F. Supp. 2d 521 (S.D. New York, 2010)
EMPIRE FIRE & MARINE INS. v. Lang
655 F. Supp. 2d 150 (D. Connecticut, 2009)
Xerox Corp. v. Media Sciences, Inc.
609 F. Supp. 2d 319 (S.D. New York, 2009)
Basler Turbo Conversions LLC v. HCC Insurance
601 F. Supp. 2d 1082 (E.D. Wisconsin, 2009)
Ocean Partners, LLC v. North River Insurance
546 F. Supp. 2d 101 (S.D. New York, 2008)
Charts v. Nationwide Mutual Insurance
397 F. Supp. 2d 357 (D. Connecticut, 2005)
Omni Berkshire Corp. v. Wells Fargo Bank, N.A.
307 F. Supp. 2d 534 (S.D. New York, 2004)

Cite This Page — Counsel Stack

Bluebook (online)
784 F.2d 127, 1986 U.S. App. LEXIS 22517, Counsel Stack Legal Research, https://law.counselstack.com/opinion/newmont-mines-limited-and-esso-resources-canada-limited-v-hanover-ca2-1986.