New England Power Co. v. New Hampshire

455 U.S. 331, 102 S. Ct. 1096, 71 L. Ed. 2d 188, 1982 U.S. LEXIS 27, 45 P.U.R.4th 641, 50 U.S.L.W. 4223
CourtSupreme Court of the United States
DecidedFebruary 24, 1982
Docket80-1208
StatusPublished
Cited by208 cases

This text of 455 U.S. 331 (New England Power Co. v. New Hampshire) is published on Counsel Stack Legal Research, covering Supreme Court of the United States primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
New England Power Co. v. New Hampshire, 455 U.S. 331, 102 S. Ct. 1096, 71 L. Ed. 2d 188, 1982 U.S. LEXIS 27, 45 P.U.R.4th 641, 50 U.S.L.W. 4223 (1982).

Opinion

Chief Justice Burger

delivered the opinion of the Court.

These three consolidated appeals present the question whether a state can constitutionally prohibit the exportation of hydroelectric energy produced within its borders by a federally licensed facility, or otherwise reserve for its own citizens the “economic benefit” of such hydroelectric power.

I

Appellant New England Power Co. is a public utility which generates and transmits electricity at wholesale. It sells 75% of its power in Massachusetts and much of the remainder in Rhode Island; less than 6% of New Hampshire’s population is serviced by New England Power’s wholesale customers. New England Power owns and operates six hydroelectric generating stations on the Connecticut River, consisting of 27 generating units. Twenty-one of these units—with a capacity of 419.8 megawatts, or about 10% of New England Power’s total generating capacity—are located within the State of New Hampshire. The units are licensed by the Federal En *334 ergy Regulatory Commission pursuant to Part I of the Federal Power Act, 41 Stat. 1063, as amended, 16 U. S. C. §§ 791a-823 (1976 ed. and Supp. IV). Since hydroelectric facilities operate without significant fuel consumption, these units can produce electricity at substantially lower cost than most other generating sources.

New England Power is a member of the New England Power Pool, whose utility-members own over 98% of the total generation capacity, and virtually all of the transmission facilities, in the six-state region. The objectives of the Power Pool, as described in the agreement among its members, are to assure the reliability of the region’s bulk power supply and to attain “maximum practicable economy” through, inter alia, “joint planning, central dispatching . . . and coordinated construction, operation and maintenance of electric generation and transmission facilities owned or controlled by the Participants . . . .” New England Power Pool Agreement §4.1, App. 31a. All member-owned generating facilities are placed under the control of the Power Pool’s Dispatch Center. A computer calculates the cost of generation for each generating unit and assigns each unit an operating schedule that will minimize the cost of the region’s total power supply. Power generated at the various units, including New England Power’s Connecticut River hydroelectric stations, flows freely through the Pool’s regional transmission network, or “grid.” The energy is dispatched to members’ customers as their power needs arise, without regard to generating source. The Pool bills each member the amount it would have cost the utility to meet its customers’ load using only its own generating sources, minus that member’s share of the savings resulting from the centralized dispatch system. 1

*335 A New Hampshire statute, enacted in 1913, provides:

“No corporation engaged in the generation of electrical energy by water power shall engage in the business of transmitting or conveying the same beyond the confines of the state, unless it shall first file notice of its intention so to do with the public utilities commission and obtain an order of said commission permitting it to engage in such business.” N. H. Rev. Stat. Ann. §374:35 (1966).

The statute empowers the New Hampshire Commission to prohibit the exportation of such electrical energy when it determines that the energy “is reasonably required for use within this state and that the public good requires that it be delivered for such use.” Ibid.

Since 1926, New England Power or a predecessor company periodically applied for and obtained approval from the New Hampshire Commission to transmit electricity produced at the Connecticut River plants to points outside New Hampshire. However, on September 19, 1980, after an investigation and hearings, the Commission withdrew the authority formerly granted New England Power to export its hydroelectric energy, and ordered the company to “make arrangements to sell the previously exported hydroelectric energy to persons, utilities and municipalities within the State of New Hampshire . . . .” 2 In its report accompanying the order, *336 the Commission found that New Hampshire’s population and energy needs were increasing rapidly; that, primarily because of its low “generating mix” of hydroelectric energy, the Public Service Company of New Hampshire, the State’s largest electric utility, had generating costs about 25% higher than those of New England Power; and that if New England Power’s hydroelectric energy were sold exclusively in New Hampshire, New Hampshire customers could save approximately $25 million a year. The Commission therefore concluded that New England Power’s hydroelectric energy was “required for use within the State” of New Hampshire, and that discontinuation of its exportation would serve the “public good.” App. to Juris. Statement in No. 80-1208, pp. 25-39.

The Commission did not, however, order New England Power to sever its connections with the Power Pool. So long as the electricity produced at New England Power’s hydroelectric plants continues to flow through the Pool’s regional transmission network, it will be impossible to contain that electricity within the State of New Hampshire in any physical sense. Although the precise contours of the Commission’s order are unclear, it appears to require that New England Power sell electricity to New Hampshire utilities in an amount equal to the output of its in-state hydroelectric facilities, at special rates adjusted to reflect the entire savings attributable to the low-cost hydroelectric generation. 3

*337 New England Power, the Commonwealth of Massachusetts, and Dennis J. Roberts II, Attorney General of Rhode Island, appealed the Commission’s order to the Supreme Court of New Hampshire. They contended that the order was pre-empted by Parts I and II of the Federal Power Act, 16 U. S. C. §§791a-824k (1976 ed. and Supp. IV), and imposed impermissible burdens on interstate commerce. The court rejected these arguments, concluding that the “saving clause” of § 201(b) of the Federal Power Act, 16 U. S. C. §824(b) (1976 ed., Supp. IV), granted New Hampshire authority to restrict the interstate transportation of hydroelectric power generated within the State. Appeal of New England Power Co., 120 N. H. 866, 870-877, 424 A. 2d 807, 814 (1980). 4 The court further held that the New Hampshire Commission’s order did not interfere with the Federal Energy Regulatory Commission’s exclusive regulatory authority over rates charged for interstate sales of electricity at wholesale. It thus remanded the case to permit the parties to “develop the mechanics of implemention” of the New *338

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Asante v. Azar
District of Columbia, 2023
State of North Dakota v. Beverly Heydinger
825 F.3d 912 (Eighth Circuit, 2016)
PacifiCorp v. Washington Utilities & Transportation Commission
376 P.3d 389 (Court of Appeals of Washington, 2016)
John Sturgeon v. Sue Masica
768 F.3d 1066 (Ninth Circuit, 2014)
Entergy Nuclear Vermont Yankee, LLC v. Shumlin
733 F.3d 393 (Second Circuit, 2013)
Rocky Mountain Farmers Union v. Goldstene
843 F. Supp. 2d 1042 (E.D. California, 2011)
United States v. Sawyer
Ninth Circuit, 2008
United States v. Reliant Energy Services, Inc.
420 F. Supp. 2d 1043 (N.D. California, 2006)
United States v. Mitchell, John
Seventh Circuit, 2003
In Re Mirant Corp.
303 B.R. 304 (N.D. Texas, 2003)
Alliant Energy Corp v. Bie, Avie M.
330 F.3d 904 (Seventh Circuit, 2003)
Pharmaceutical Research & Manufacturers of America v. Thompson
259 F. Supp. 2d 39 (District of Columbia, 2003)
State, Commercial Fisheries Entry Commission v. Carlson
65 P.3d 851 (Alaska Supreme Court, 2003)

Cite This Page — Counsel Stack

Bluebook (online)
455 U.S. 331, 102 S. Ct. 1096, 71 L. Ed. 2d 188, 1982 U.S. LEXIS 27, 45 P.U.R.4th 641, 50 U.S.L.W. 4223, Counsel Stack Legal Research, https://law.counselstack.com/opinion/new-england-power-co-v-new-hampshire-scotus-1982.