Naiditch v. Shaf Home Builders, Inc.

512 N.E.2d 1027, 160 Ill. App. 3d 245, 111 Ill. Dec. 486, 1987 Ill. App. LEXIS 3099
CourtAppellate Court of Illinois
DecidedAugust 18, 1987
Docket2-86-0884
StatusPublished
Cited by40 cases

This text of 512 N.E.2d 1027 (Naiditch v. Shaf Home Builders, Inc.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Naiditch v. Shaf Home Builders, Inc., 512 N.E.2d 1027, 160 Ill. App. 3d 245, 111 Ill. Dec. 486, 1987 Ill. App. LEXIS 3099 (Ill. Ct. App. 1987).

Opinion

JUSTICE REINHÁRD

delivered the opinion of the court:

Defendants, Shaf Home Builders, Inc., Ted Shaf, and the First National Bank of Skokie, as trustee for trust No. 50027 (trustee bank), appeal from the judgment following a bench trial of the circuit court of Lake County which found in favor of plaintiff, Ernest W. Naiditch, on five of the six counts of his third amended complaint, awarding $51,547.08 in actual damages and $109,544.70 in punitive damages. Plaintiff cross-appeals the dismissal of count VI of his third amended complaint.

Defendants raise the following issues on appeal: (1) whether the complaint sufficiently stated a cause of action for fraud; (2) whether the trial court’s finding of fraud was supported by clear and convincing evidence; (3) whether the trial court improperly based its finding of fraud upon misrepresentations regarding the structural integrity of the house; (4) whether plaintiff can recover for alleged wilful and wanton misconduct where the proved damages were solely for economic loss and there was no proof of an independent tort; (5) whether the failure to give notice of alleged problems with the air-conditioning system and the insulation barred plaintiff’s recovery for these alleged defects under either the express or implied warranties; (6) whether plaintiff’s claim for damages involving defects in the cathedral ceiling and the garage ceiling are barred by the statute of limitations; (7) whether the expense of plaintiff’s expert witness is a proper element of actual damages; (8) whether the trial court improperly measured the damages based on the cost of effecting repairs of the problems; (9) whether the award of punitive damages was excessive; and (10) whether the trial court improperly determined that the express warranty contained in the contract expired in December 1986, rather than on October 15, 1981. Plaintiff’s cross-appeal raises the following issue: whether the trial court erred by dismissing count VI of his third amended complaint alleging conversion.

Defendant Shaf has been in the business of constructing single family homes in the Chicago area for more than 30 years and operated Shaf Home Builders (hereinafter referred to with Shaf collectively as defendant)., He developed a subdivision of luxury, custom homes called High Ridge in Highland Park in the mid-1970’s, and the house which is involved in this dispute was constructed in High Ridge in 1977. This 4 bedroom, 4½ bath home was originally designed to serve as a model home and office for the High Ridge development, and for three years, the house served as headquarters for approximately 10 employees of Shaf Home Builders. There were no complaints from the employees regarding the house, and there was no testimony at trial which indicated that either defendant or any employee knew of any alleged defects in the house prior to the sale to plaintiff. The only apparent problem was an occasional water leak in the garage.

In April 1976, defendant filed the plans for the proposed house with the building department of Highland Park and obtained a building permit. In order to obtain a building permit in Highland Park, a builder was required to submit plans already approved and “affixed” with a seal by an architect for approval by the city. When the required plans for this house were submitted to the city, the city plan examiner made handwritten notations on the face of the plans, reflecting changes as a condition for issuance of a building permit. The changes required by the city included the addition of a ridge beam consisting of three 2- by 14-inch boards around a 3/s-inch plate within the peak of the cathedral ceiling in the living room and dining room area and the installation of a steel beam across the top of the sliding glass doors leading to the balcony above the garage. Once such changes were made on the plans, it was the dual responsibility of the builder and the city inspector to insure that the changes were complied with.

In the spring of 1977, construction began on the house. Some items, however, were omitted by defendant in the construction of the house. Instead of three 2- by 14-inch boards around a 3/s-inch plate within the peak of the cathedral ceiling, defendant used only a single 2- by 10-inch board. It was later determined that this omission, in the opinion of one structural engineer, made the support for the cathedral ceiling structurally inadequate. Defendant’s structural engineer even stated that the single 2- by 10-inch ridge board was 750% overstressed prior to the initial repairs. The house, however, was subjected to the city’s normal inspectional processes throughout construction, and a conditional certificate of occupancy was issued by the city in December 1980. The house had been placed on the market for sale in 1979.

On August 29, 1980, plaintiff executed a contract to purchase the house for $297,200. Title to this property at the time was held in a land trust at the trustee bank, and defendant, under the name of Shaf Home Builders, owned the beneficial interest and power of direction in the trust. At the time the contract was executed, it was anticipated that a closing would be held to transfer title on or about October 15, 1980. The contract called for a standard closing through which defendant would be paid the agreed-upon price and title would simultaneously be conveyed to plaintiff. The purchase was contingent, on an inspection of the house by a qualified contractor representing plaintiff. Such an inspection was actually made, and no objections were expressed as a result of the inspection. The contract also contained the following warranty provision:

“CONSTRUCTION WARRANTY
The Seller warrants that for a period of one year after the consummation of the attached agreement by delivery of deed, Seller will correct any defect due to faulty construction and or defective materials, except as otherwise excluded herein. Seller does not assume responsibility for any secondary or consequential damage caused by the defects.”

The balance of the mortgage on the property as of October 15, 1980, was approximately $96,024.84. The mortgage arrangement between defendant and the mortgagee, Skokie Federal Savings and Loan (Skokie Federal), required defendant to pay $822 per month to the Skokie Federal as principal and interest. This represented an interest rate of 83/i% per annum. Prior to the scheduled closing on October 15, 1980, plaintiff and defendant agreed to a modification of their contract whereby plaintiff would pay defendant approximately $200,000 in cash on October 15, 1980, take possession of the house subject to the outstanding mortgage, and then pay defendant $822 per month. Defendant was to continue to pay the $822 per month to Skokie Federal and was required to deposit in escrow with the trustee bank the deed and a letter of direction to the trustee to convey the deed to plaintiff upon evidence of full payment of the mortgage. In addition, plaintiff was to pay defendant the remaining $95,279.55 on the mortgage on or before April 15, 1981, or he would be faced with an increase in the interest rate to 18% per annum.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Winkler v. Danna Pools, Inc.
2025 IL App (3d) 240424-U (Appellate Court of Illinois, 2025)
National Railroad Passenger Corporation v. Terracon Consultants, Inc.
2014 IL App (5th) 130257 (Appellate Court of Illinois, 2014)
National Railroad Passenger Corporation v. Terracon Consultants, Inc.
2014 IL App (5th) 130257 (Appellate Court of Illinois, 2014)
Walton v. Bayer Corp.
692 F. Supp. 2d 1012 (S.D. Illinois, 2010)
In Re Yasmin and Yaz (Drospirenone) Marketing
692 F. Supp. 2d 1025 (S.D. Illinois, 2010)
Stoneridge Development v. Essex Insurance
Appellate Court of Illinois, 2008
Stoneridge Development Co. v. Essex Insurance
888 N.E.2d 633 (Appellate Court of Illinois, 2008)
Wilson v. DiCosola
815 N.E.2d 975 (Appellate Court of Illinois, 2004)
Shannon v. Boise Cascade
783 N.E.2d 1105 (Appellate Court of Illinois, 2003)
Eickmeyer v. Blietz Organization, Inc.
671 N.E.2d 795 (Appellate Court of Illinois, 1996)
Montecalvo v. Mandarelli
682 A.2d 918 (Supreme Court of Rhode Island, 1996)
Finley v. Marathon Oil Company
75 F.3d 1225 (Seventh Circuit, 1996)
Finley v. Marathon Oil Co.
75 F.3d 1225 (Seventh Circuit, 1996)
Grove v. Huffman
634 N.E.2d 1184 (Appellate Court of Illinois, 1994)
Ollivier v. Alden
634 N.E.2d 418 (Appellate Court of Illinois, 1994)
Dominguez v. St. John's Hospital
632 N.E.2d 16 (Appellate Court of Illinois, 1994)
Heider v. Leewards Creative Crafts, Inc.
613 N.E.2d 805 (Appellate Court of Illinois, 1993)
State Farm Fire & Casualty Co. v. Miller Electric Co.
596 N.E.2d 169 (Appellate Court of Illinois, 1992)

Cite This Page — Counsel Stack

Bluebook (online)
512 N.E.2d 1027, 160 Ill. App. 3d 245, 111 Ill. Dec. 486, 1987 Ill. App. LEXIS 3099, Counsel Stack Legal Research, https://law.counselstack.com/opinion/naiditch-v-shaf-home-builders-inc-illappct-1987.