Montana Mining Co. v. St. Louis Min. & Mill Co. of Montana

183 F. 51, 105 C.C.A. 343, 1910 U.S. App. LEXIS 5008
CourtCourt of Appeals for the Ninth Circuit
DecidedOctober 24, 1910
DocketNo. 1,809
StatusPublished
Cited by11 cases

This text of 183 F. 51 (Montana Mining Co. v. St. Louis Min. & Mill Co. of Montana) is published on Counsel Stack Legal Research, covering Court of Appeals for the Ninth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Montana Mining Co. v. St. Louis Min. & Mill Co. of Montana, 183 F. 51, 105 C.C.A. 343, 1910 U.S. App. LEXIS 5008 (9th Cir. 1910).

Opinion

MORROW, Circuit Judge

(after stating the facts as above). It is contended by the Montana Company that the St. Louis Company has no extralateral rights in the Drum Lummon vein underneath the Nine Hour claim. This contention is based upon two facts; (1) That the Drum Lummon vein was not the discovery vein of the St. Louis claim, but is what is called a secondary vein. (2) This secondary vein enters and departs from the St. Louis claim by a side line. Section 2322 of the Revised Statutes (U¿ S. Comp. St. 1901, p. 1425) provides that:

[61]*61“The locators of all mining locations * * * on any mineral vein, lode, or ledge, situated on the public domain * * * shall have the exclusive right of possession and enjoyment of all the surface included within the lines of their locations, and of all veins, lodes, and ledges throughout their entire depth, the top or apex of which lies inside of such surface lines extended downward vertically, although such veins, lodes, or ledges may so far depart from a perpendicular in their course downward as to extend outside the vertical side lines of such surface locations.”

The patents for the St. Louis and Nine Hour claims, like all patents for mineral lands, conveyed to the grantees the respective claims and veins therein with the extralateral rights provided in the statute, with the express reservation in each patent:

“That the premises hereby granted, with the exception of the surface, may be entered by the proprietor of any other vein, lode or ledge, the top or apex of which lies outside of the boundary of said granted premises, should the same in its dip be found to penetrate, intersect or extend into said premises, for the purpose of extracting or removing the ore from such other vein, lode, or ledge.”

The evidence in this case on the last trial, as upon former trials, established the fact that the Drum Lummon vein apexes for a certain distance within the St. Louis claim and dips underneath the Nine Hour claim. We are therefore of the opinion that the right of the St. Louis Company to extralateral rights in the Drum Lummon vein to the extent, that that vein apexes within the St. Louis claim has been previously determined by this court. (102 Fed. 430, 42 C. C. A. 415; 104 Fed. 664, 44 C. C. A. 120, 56 L. R. A. 725; 147 Fed. 897, 78 C. C. A. 33), and that this determination has been affirmed by the Supreme Court of the United States (204 U. S. 204, 27 Sup. Ct. 254, 51 L. Ed. 444), and that such has become the law of the case.

To what extent the St. Louis Company has extralateral rights in the Drum Lummon vein underneath the surface of the Nine Hour claim depends upon the extent to which that vein apexes within the St. Louis claim, and this question depends in turn upon the location of the boundary line between the St. Louis claim and the compromise ground, and the point where the Drum Lummon vein crosses that line. In the former trials of this case there had been no controversy about this fact. The lines of the compromise ground have been placed on numerous plats and maps showing a strip of ground' 30 feet wide and containing about 12,844.5 square feet on the souths eastern boundary of the St.-Louis claim and parallel to the southeastern boundary line of that claim between corners Nos. 2 and 3, as described in the patent for that claim, and this description had been treated as correct by both parties. It had also been referred to in this court indifferently as either the “compromise ground,” or “30-foot strip,” and occasionally both terms have been used. 102 Fed. 130, 42 C. C. A. 415; 104 Fed. 664, 44 C. C. A. 120, 56 L. R. A. 725; 147 Fed. 897, 78 C. C. A. 33; 168 Fed. 514, 93 C. C. A. 536. It was referred to in the Supreme Court in reciting the averments of the pleadings as the “30-foot strip or compromise ground.” 186 U. S. 24, 22 Sup. Ct. 744, 46 L. Ed. 1039. The calls of the description of the compromise ground in the bond and deed do in fact describe [62]*62a strip of ground in the southeastern corner of the St. Louis claim with parallel sides 30 feet apart and containing about 12,844.5 square feet. But at the last trial the St. Louis Company called as a witness one John R. Parks, a mining engineer, who produced a map prepared under his direction showing the surface and underground workings of the St. Louis and Nine Hour claims, and the location of the 30-foot strip or compromise ground. The map was admitted in evidence and marked plaintiff’s “Exhibit 1.” When the witness had indicated on the map the courses and distances inclosing this strip of ground and particularly the location of the west side line of the compromise ground, the Montana Company objected to any further testimony with reference to this line as drawn upon the map for the reason that it was not drawn in accordance with the’description of the ground as contained in the deed. The objection was overruled, and the witness traced the lines of the compromise ground in detail as shown upon the map. The objection was that the west side line of the compromise ground, which is also the east side line of the St. Louis claim after the compromise ground had been cut off, is not located as required by the initial call of the deed describing the compromise ground. That call is as follows:

“Commencing at a point from which the center of the discovery shaft of the Nine Hour lode bears south 39 degrees 32 minutes east, said course being at right angles to the boundary line of the St. Louis lode between corners 2 and 3, 50 feet distant.”

The west side line of the compromise ground, as shown upon the map, plaintiff’s Exhibit 1, instead of being 50 feet distant from the present discovery shaft of the Nine Hour claim, is 40 feet distant. To sustain the correctness of the lines of the compromise ground as shown on the map, the St. Louis Company introduced in evidence, over the objection of.the Montana Company, evidence tending to show that the collar of the. discovery shaft of the Nine Hour claim is not at the same point it was at the time of the compromise agreement; that the original shaft was perpendicular, such as a prospector usually sinks; that the shaft was afterwards sunk on an incline, corresponding with the dip of the vein, and the collar of that shaft was brought about 10 feet further west and nearer to the original eastern side line of the St. Louis claim. This evidence, if true, accounted for the fact that, if the commencement point were taken from the middle of the present shaft, it would make the width of the strip of compromise ground at the point of commencement 40 feet instead of 30 feet, as called for in the deed. Presumably for this reason the witness Parks in tracing the boundary of the compromise ground did not commence with the initial call of the deed, but commenced at corner No. 2 of the St. Louis claim as described in the patent; that is to say, he measured north from corner No. 2 of the patent, along the line in the direction of corner No. 1, 60.5 feet. This line followed in reverse direction the third call of the deed:

“Thence south 20 degrees 28 minutes west along the line of said boundary between corners one and two, ,60.5 feet to corner 2.”

[63]*63He then commenced at corner No. 3 of the patent and measured along the line between corners 3 and 4,

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Our Lady of the Rockies, Inc. v. Peterson
2008 MT 110 (Montana Supreme Court, 2008)
Tom Reed Gold Mines Co. v. Brady
117 P.2d 484 (Arizona Supreme Court, 1941)
Reidy v. Myntti
116 F.2d 725 (Ninth Circuit, 1940)
United States v. Standard Oil Co. of California
21 F. Supp. 645 (S.D. California, 1937)
Umsted v. Johnson
84 F.2d 859 (Eighth Circuit, 1936)
Ward v. Massachusetts Bonding & Insurance
228 P. 363 (California Court of Appeal, 1924)
Arizona Commercial Mining Co. v. Iron Cap Copper Co.
236 Mass. 185 (Massachusetts Supreme Judicial Court, 1920)
Anaconda Copper Min. Co. v. Pilot Butte Min. Co.
156 P. 409 (Montana Supreme Court, 1915)

Cite This Page — Counsel Stack

Bluebook (online)
183 F. 51, 105 C.C.A. 343, 1910 U.S. App. LEXIS 5008, Counsel Stack Legal Research, https://law.counselstack.com/opinion/montana-mining-co-v-st-louis-min-mill-co-of-montana-ca9-1910.