Miller v. Rissler & McMurry Co.

794 P.2d 91, 1990 Wyo. LEXIS 69, 1990 WL 78481
CourtWyoming Supreme Court
DecidedJune 13, 1990
Docket89-201
StatusPublished
Cited by7 cases

This text of 794 P.2d 91 (Miller v. Rissler & McMurry Co.) is published on Counsel Stack Legal Research, covering Wyoming Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Miller v. Rissler & McMurry Co., 794 P.2d 91, 1990 Wyo. LEXIS 69, 1990 WL 78481 (Wyo. 1990).

Opinion

CARDINE, Chief Justice.

Larry Eugene Miller was killed when the vehicle in which he was riding failed to negotiate a curve in a service, road north of Douglas, Wyoming. Appellant, the personal representative of the deceased’s estate, brought this wrongful death action, alleging that Rissler & McMurry Company (Ris-sler) was negligent in erecting traffic signs on the service road which were inadequate to warn travellers of the abrupt curve. He now appeals from a summary judgment in favor of Rissler.

We affirm.

Appellant raises the following issues:

“1. Is a Construction Company liable for injuries to, or the death of, third persons occurring after completion of its work and its acceptance by the eontrac-tee?
“2. Is a contractor who constructed a road according to the plans and specifications designed by the Wyoming Highway Department immune from liability for any subsequent injuries which may occur *92 as a result of apparent defects in those plans?
“3. Were the plans and specifications for the service road connecting with Wyoming Highway 59 so obviously dangerous and likely to cause injury to others that an ordinary and reasonable contractor of ordinary prudence in his field would or should not follow them.
“4. The Court erred in finding there was no genuine issue of material fact.”

Rissler states the issues thusly:

“A. Is a construction contractor who has followed the plans and specifications provided by the state liable to third persons for any defect in those plans and specifications?
“B. Is a contractor liable for lack of adequate signing on a highway where the state highway department knew or should have known what signs were needed?
“C. Is a contractor immune from liability for complying with the plans and specifications provided by a state agency? Or is any negligence on the part of a state agency imputed to a contractor hired by that agency?”

FACTS

The curve on which Miller’s accident occurred is on Wyoming Highway 59 Service Road near its intersection with the 59 Bypass, approximately one mile north of Douglas, Wyoming. Rissler was the general contractor on the state highway construction project which included the Highway 59 Bypass and the curve and intersection where this accident occurred. On September 14, 1987, the Wyoming State Highway Department conducted a final inspection of the project and determined that Rissler had satisfactorily fulfilled the terms of its construction contract and had completed its work in accordance with the plans, specifications, and special provisions of that contract. Rissler received the highway department’s notice of completion and acceptance of work the following day.

At approximately 2:15 a.m., on October 3, 1987, Miller and Billy Joe Cook were travel-ling north on the Highway 59 Service Road in Cook’s pickup truck. The two men had just left a local tavern where they had been drinking for nearly three hours. As they entered the disputed curve, at a speed estimated to be between 55 and 65 miles per hour, Cook lost control of the vehicle. The truck shot off the road, flew 80 feet in the air and bounced another 46 feet. Miller was ejected from the vehicle, landing over 50 feet from where the truck came to rest, and sustained fatal injuries. Investigators discovered two packets of cocaine on his body.

DISCUSSION

In reviewing the propriety of a summary judgment, we examine the affidavits, exhibits and material presented to the district court according to the same standard applied by that court. Matthews v. Fetzner, 768 P.2d 590, 592 (Wyo.1989); Thomas v. South Cheyenne Water and Sewer District, 702 P.2d 1303, 1304 (Wyo.1985). Such a judgment is proper if, viewing those materials from the viewpoint of the party opposing the motion, there is no genuine issue of material fact, and the movant is entitled to judgment as a matter of law. Bryant v. Hornbuckle, 728 P.2d 1132, 1135 (Wyo.1986); Thomas, 702 P.2d at 1304. Although the drastic remedy of summary judgment is generally inappropriate in negligence actions, we have recognized an exception to the general rule where a party fails to establish a genuine factual issue with respect to a necessary element of his cause of action. Bryant, 728 P.2d at 1137; DeWald v. State, 719 P.2d 643, 651 (Wyo.1986).

Appellant initiated this action against Rissler, alleging in his complaint:

“7. That the Defendant negligently constructed said curve so that it could not be negotiated at the posted speed limit of Fifty-five (55) miles per hour.
“8. That the Defendant negligently constructed the curve and intersection in such a manner that there was an apparent continuation of the tangent section of the highway so that at night automobile headlights coming from the north make *93 it appear that the road is continuous. A driver would be unaware of the need to negotiate a sharp curve, stop and then make a right turn to continue on the same road. Defendant was negligent in failing to correct this line of site either by placing a mound of dirt where the old Highway 59 was obliterated to eliminate it or by installing a large enough turn sign to adequately warn the driver and to blot out the driver’s view in vehicles that are traveling north on the Service Road approaching the curve.
“9. Defendant was also negligent in failing to install adequate warning signs so that the drivers of vehicles moving in a northerly direction on the Service Road would be aware that they were approaching a sharp left-hand turn which could not be negotiated at the posted speed limit of Fifty-five (55) miles per hour or in the alternative of reducing the speed limit well ahead of the curve.
“10. That the Defendant negligently constructed the curve with a steep embankment on the north side of the curve so that vehicles which failed to negotiate the curve could not recover without overturning.”

Rissler moved for summary judgment and submitted supporting affidavits and exhibits which established the following facts:

1. Neither its contract with the Wyoming Highway Department, nor the customs and practices of the construction industry, imposed upon Rissler any responsibilities with respect to the design of either the roadway or the warning signs to be installed on the roadway.
2. Such designs were contained in the plans and specifications for the project, which were prepared by the highway department and which Rissler was contractually obligated to follow in performing work on the project.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Hatton v. Energy Electric Co.
2006 WY 151 (Wyoming Supreme Court, 2006)
Lynch v. Norton Construction, Inc.
861 P.2d 1095 (Wyoming Supreme Court, 1993)
First Wyoming Bank, N.A. v. Continental Insurance Co.
860 P.2d 1064 (Wyoming Supreme Court, 1993)
McDonald v. Mobil Coal Producing, Inc.
820 P.2d 986 (Wyoming Supreme Court, 1991)

Cite This Page — Counsel Stack

Bluebook (online)
794 P.2d 91, 1990 Wyo. LEXIS 69, 1990 WL 78481, Counsel Stack Legal Research, https://law.counselstack.com/opinion/miller-v-rissler-mcmurry-co-wyo-1990.