799 F.2d 687
24 ERC 2041, 16 Envtl. L. Rep. 20,994
MANASOTA-88, INC., Petitioner,
v.
Lee M. THOMAS, Administrator, Environmental Protection
Agency, and the United States Environmental
Protection Agency, Respondents,
and
Gardinier, Inc., Intervenor-Respondent.
No. 85-3837.
United States Court of Appeals, Eleventh Circuit.
Sept. 15, 1986.
Thomas W. Reese, St. Petersburg, Fla., for petitioner.
David W. Zugschwerdt, U.S. Dept. of Justice, Land & Natural Resources Div., Environmental Defense Section, Washington, D.C., Thomas DeRose, U.S. E.P.A., Atlanta, Ga., Joseph Freedman, Office of General Counsel, U.S. E.P.A., Washington, D.C., for respondents.
Robert L. Rhodes, Jr., Holland & Knight, Lakeland, Fla., for intervenor-respondent.
Petition for Review of an Order of the Environmental Protection Agency.
Before JOHNSON and ANDERSON, Circuit Judges, and GARZA, Senior Circuit Judge.
GARZA, Senior Circuit Judge:
BACKGROUND
Gardinier, Inc. ("Gardinier"), is engaged in mining and processing phosphate ore and manufacturing fertilizers and other chemical products at its Tampa Chemical plant located in Hillsborough County, Florida. On June 30, 1977, the United States Environmental Protection Agency ("EPA" or "Agency") issued Gardinier a five-year National Pollution Discharge Elimination System ("NPDES") permit regulating discharges from this facility.
On May 17, 1979, Gardinier notified the EPA of its plan to make process modifications and to expand plant capacity by 20 per cent. Gardinier also noted that continued operations would require the future development of a disposal area for "phosphogypsum," a waste product of the phosphate process. Gardinier proposed that environmental review of the disposal area be conducted simultaneously with that for the plant process modifications and capacity expansion and, on October 4, requested that the EPA make a formal initial determination as to whether its proposed process modifications constituted a "new source." EPA issued its initial determination that the plant modifications constituted a new source for NPDES permitting purposes on November 1, 1979.
On October 30, 1980, the EPA issued an environmental assessment ("EA") and a "finding of no significant impact" ("FONSI") concerning both Gardinier's plant modifications and proposed phosphogypsum disposal area. The Agency concluded that no significant impact on environmental quality was present. The EPA also issued public notice initiating a thirty-day public comment period on its initial new source determination, its environmental review and its draft proposed modified NPDES permit. The notice contained information on procedures for making both public hearing requests to supplement written comments, and for requesting an evidentiary hearing subsequent to the Agency's final determination on issuance of the proposed modified permit.
On November 15, 1980, Manasota-88, Inc. ("Manasota-88"), a non-profit, environmental organization, submitted its written comments, directing the Agency's attention to a technical support document prepared in August, 1979, by EPA's Office of Radiation Programs ("ORP") regarding emissions of "radionuclides" into the atmosphere. On February 24, 1981, EPA issued Gardinier a modified NPDES permit effective March 26, 1981, with an expiration date of August 15, 1982. Manasota-88 did not pursue further review of the Agency's issuance of the modified NPDES permit to Gardinier.
Prior to the expiration of its modified NPDES permit, Gardinier applied for reissuance on February 11, 1982. On March 29, 1984, the EPA issued public notice commencing a thirty-day comment period on reissuance of Gardinier's NPDES permit. Manasota-88 submitted written comments requesting that the Agency prepare an EIS prior to reissuing Gardinier's NPDES permit. Specifically, Manasota-88 asserted that the Agency's 1980 FONSI "was based upon limited and inaccurate information" and cited data from the ORP document to which it had referred in submitting its November 15, 1980, comments on the adequacy of the Agency's environmental review. On May 9, 1984, Manasota-88 submitted additional comments combined with a request for an informal public hearing.
On September 20, 1984, the Agency held a public hearing in which Manasota-88 presented additional comments with respect to radon emissions from the proposed phosphogypsum disposal area. The EPA agreed with Manasota-88 that the Agency's 1980 FONSI, "although it was adequate at the time of issuance, does not reflect [what] appears to be additional information ... [and that, the Agency would] study the specific issue regarding radioactivity emissions from ... gyp stacks". However, a week later, on September 28, 1984, the EPA reissued Gardinier's NPDES permit effective November 1, 1984, with an expiration date of October 31, 1989. Written notice of this permit determination was issued on October 22, 1984.
Manasota-88 responded to the Agency's notice of its final determination by filing a Request for Evidentiary Hearing on November 19, 1984. Manasota-88 contended that the 1980 FONSI was erroneous and required the Agency to develop a full-scale EIS prior to reissuance of Gardinier's NPDES permit. The Agency's Region IV Administrator concluded that the request failed to raise any material issue of fact, and that the relevant legal objections were not well taken. Accordingly, he denied Manasota-88's evidentiary hearing request on April 18, 1985. The EPA Administrator, on appeal, denied review of the permit reissuance determination on August 2, 1985. Manasota-88 timely filed its petition for review in this court on October 29, 1985.
STANDARD OF REVIEW
Generally speaking, the court's review of an agency's final decision is governed by the Administrative Procedure Act ("APA"), 5 U.S.C. Secs. 701 et seq. Under this statute, the "reviewing court shall ... hold unlawful and set aside agency actions, findings and conclusions found to be--arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law." 5 U.S.C. Sec. 706(2)(A). This deferential standard presumes the validity of the agency action and prohibits a reviewing court from substituting its judgment for that of the agency. See Citizens to Preserve Overton Park v. Volpe, 401 U.S. 402, 413-14, 91 S.Ct. 814, 822, 28 L.Ed.2d 136 (1971). "Administrative decisions should be set aside in this context, as in every other, only for substantial procedural or substantive reasons as mandated by statute ... not simply because the court is unhappy with the result reached." Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 558, 98 S.Ct. 1197, 1219, 55 L.Ed.2d 460 (1979).
Free access — add to your briefcase to read the full text and ask questions with AI
799 F.2d 687
24 ERC 2041, 16 Envtl. L. Rep. 20,994
MANASOTA-88, INC., Petitioner,
v.
Lee M. THOMAS, Administrator, Environmental Protection
Agency, and the United States Environmental
Protection Agency, Respondents,
and
Gardinier, Inc., Intervenor-Respondent.
No. 85-3837.
United States Court of Appeals, Eleventh Circuit.
Sept. 15, 1986.
Thomas W. Reese, St. Petersburg, Fla., for petitioner.
David W. Zugschwerdt, U.S. Dept. of Justice, Land & Natural Resources Div., Environmental Defense Section, Washington, D.C., Thomas DeRose, U.S. E.P.A., Atlanta, Ga., Joseph Freedman, Office of General Counsel, U.S. E.P.A., Washington, D.C., for respondents.
Robert L. Rhodes, Jr., Holland & Knight, Lakeland, Fla., for intervenor-respondent.
Petition for Review of an Order of the Environmental Protection Agency.
Before JOHNSON and ANDERSON, Circuit Judges, and GARZA, Senior Circuit Judge.
GARZA, Senior Circuit Judge:
BACKGROUND
Gardinier, Inc. ("Gardinier"), is engaged in mining and processing phosphate ore and manufacturing fertilizers and other chemical products at its Tampa Chemical plant located in Hillsborough County, Florida. On June 30, 1977, the United States Environmental Protection Agency ("EPA" or "Agency") issued Gardinier a five-year National Pollution Discharge Elimination System ("NPDES") permit regulating discharges from this facility.
On May 17, 1979, Gardinier notified the EPA of its plan to make process modifications and to expand plant capacity by 20 per cent. Gardinier also noted that continued operations would require the future development of a disposal area for "phosphogypsum," a waste product of the phosphate process. Gardinier proposed that environmental review of the disposal area be conducted simultaneously with that for the plant process modifications and capacity expansion and, on October 4, requested that the EPA make a formal initial determination as to whether its proposed process modifications constituted a "new source." EPA issued its initial determination that the plant modifications constituted a new source for NPDES permitting purposes on November 1, 1979.
On October 30, 1980, the EPA issued an environmental assessment ("EA") and a "finding of no significant impact" ("FONSI") concerning both Gardinier's plant modifications and proposed phosphogypsum disposal area. The Agency concluded that no significant impact on environmental quality was present. The EPA also issued public notice initiating a thirty-day public comment period on its initial new source determination, its environmental review and its draft proposed modified NPDES permit. The notice contained information on procedures for making both public hearing requests to supplement written comments, and for requesting an evidentiary hearing subsequent to the Agency's final determination on issuance of the proposed modified permit.
On November 15, 1980, Manasota-88, Inc. ("Manasota-88"), a non-profit, environmental organization, submitted its written comments, directing the Agency's attention to a technical support document prepared in August, 1979, by EPA's Office of Radiation Programs ("ORP") regarding emissions of "radionuclides" into the atmosphere. On February 24, 1981, EPA issued Gardinier a modified NPDES permit effective March 26, 1981, with an expiration date of August 15, 1982. Manasota-88 did not pursue further review of the Agency's issuance of the modified NPDES permit to Gardinier.
Prior to the expiration of its modified NPDES permit, Gardinier applied for reissuance on February 11, 1982. On March 29, 1984, the EPA issued public notice commencing a thirty-day comment period on reissuance of Gardinier's NPDES permit. Manasota-88 submitted written comments requesting that the Agency prepare an EIS prior to reissuing Gardinier's NPDES permit. Specifically, Manasota-88 asserted that the Agency's 1980 FONSI "was based upon limited and inaccurate information" and cited data from the ORP document to which it had referred in submitting its November 15, 1980, comments on the adequacy of the Agency's environmental review. On May 9, 1984, Manasota-88 submitted additional comments combined with a request for an informal public hearing.
On September 20, 1984, the Agency held a public hearing in which Manasota-88 presented additional comments with respect to radon emissions from the proposed phosphogypsum disposal area. The EPA agreed with Manasota-88 that the Agency's 1980 FONSI, "although it was adequate at the time of issuance, does not reflect [what] appears to be additional information ... [and that, the Agency would] study the specific issue regarding radioactivity emissions from ... gyp stacks". However, a week later, on September 28, 1984, the EPA reissued Gardinier's NPDES permit effective November 1, 1984, with an expiration date of October 31, 1989. Written notice of this permit determination was issued on October 22, 1984.
Manasota-88 responded to the Agency's notice of its final determination by filing a Request for Evidentiary Hearing on November 19, 1984. Manasota-88 contended that the 1980 FONSI was erroneous and required the Agency to develop a full-scale EIS prior to reissuance of Gardinier's NPDES permit. The Agency's Region IV Administrator concluded that the request failed to raise any material issue of fact, and that the relevant legal objections were not well taken. Accordingly, he denied Manasota-88's evidentiary hearing request on April 18, 1985. The EPA Administrator, on appeal, denied review of the permit reissuance determination on August 2, 1985. Manasota-88 timely filed its petition for review in this court on October 29, 1985.
STANDARD OF REVIEW
Generally speaking, the court's review of an agency's final decision is governed by the Administrative Procedure Act ("APA"), 5 U.S.C. Secs. 701 et seq. Under this statute, the "reviewing court shall ... hold unlawful and set aside agency actions, findings and conclusions found to be--arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law." 5 U.S.C. Sec. 706(2)(A). This deferential standard presumes the validity of the agency action and prohibits a reviewing court from substituting its judgment for that of the agency. See Citizens to Preserve Overton Park v. Volpe, 401 U.S. 402, 413-14, 91 S.Ct. 814, 822, 28 L.Ed.2d 136 (1971). "Administrative decisions should be set aside in this context, as in every other, only for substantial procedural or substantive reasons as mandated by statute ... not simply because the court is unhappy with the result reached." Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 558, 98 S.Ct. 1197, 1219, 55 L.Ed.2d 460 (1979).
The courts' proper function in reviewing an agency's action is to determine whether the agency has "considered the relevant factors and articulated a rational connection between the facts found and the choices made." Baltimore Gas & Electric Co. v. Natural Resources Defense Council, Inc., 462 U.S. 87, 105, 103 S.Ct. 2246, 2256, 76 L.Ed.2d 437 (1983); Bowman Transportation, Inc. v. Arkansas-Best Freight System, Inc., 419 U.S. 281, 285, 95 S.Ct. 438, 441, 42 L.Ed.2d 447 (1974). To affirm, a court must only determine that the agency had a rational basis for its decision. "While we may not supply a reasoned basis for the agency's action that the agency itself has not given, SEC v. Chenery Corp., 332 U.S. 194, 196, 67 S.Ct. 1575, 1577, 91 L.Ed. 1995 (1947), we will uphold a decision of less than ideal clarity if the agency's path may reasonably be discerned." Bowman, 419 U.S. at 285-86, 95 S.Ct. at 442. In the NEPA context "[t]he role of the courts is simply to ensure that the agency has adequately considered and disclosed the environmental impact of its actions and that its decision is not arbitrary or capricious." Baltimore Gas, 462 U.S. at 97-98, 103 S.Ct. at 2252.
Manasota-88 has urged this court to apply a "reasonableness" standard of review to the Agency's decision to reissue Gardinier's NPDES permit. According to Manasota-88, the EPA's decision not to prepare an EIS prior to reissuance requires a higher degree of judicial scrutiny. Although this circuit has not heretofore articulated the standard of review applicable to an agency's decision not to prepare an EIS, the former Fifth Circuit has held that a reasonableness standard is appropriate. Save Our Ten Acres v. Kreger, 472 F.2d 463 (5th Cir.1973).
In Kreger the court noted that
[t]he spirit of [NEPA] would die aborning if a facile, ex parte decision that the project was minor or did not significantly affect the environment were too well shielded from impartial review. Every such decision pretermits all consideration of that which Congress has directed be considered 'to the fullest extent possible.' The primary decision to give or bypass the consideration required by [NEPA] must be subject to inspection under a more searching standard.
Id. at 466. The Fifth Circuit has recently reaffirmed the reasonableness standard of review for an agency decision not to prepare an EIS. See Fritiofson v. Alexander, 772 F.2d 1225, 1237 (5th Cir.1985). We, therefore, agree with Manasota-88 that a reasonableness standard is appropriate for reviewing an agency's decision not to prepare an EIS.
We cannot, however, agree with Manasota-88's characterization of the issue in this case as one merely involving the EPA's refusal to prepare an EIS. The EPA found that Gardinier's proposed phosphogypsum disposal area was not a new source within the meaning of 33 U.S.C. Sec. 1316(a)(2). Specifically, the Region IV Administrator found
that the major modifications proposed by Gardinier have all been completed except for the proposed new gypsum disposal area, which considered alone, would not now, nor in 1979, have resulted in a determination that the Gardinier facility was a new source; hence, no environmental assessment would have been mandated by NEPA, if only a new gypsum disposal area had been proposed.
As the Agency points out, the pertinent statutory and regulatory provisions make clear that the obligation to prepare an EIS under NEPA does not apply to the NPDES permitting process except as to new sources.
Except for ... the issuance of a permit under section 1342 of this title for the discharge of any pollutant by a new source as defined in section 1316 of this title, no action of the Administrator taken pursuant to this chapter shall be deemed a major federal action significantly affecting the quality of the human environment within the meaning of [NEPA]...."
33 U.S.C. Sec. 1371(c)(1) (emphasis added). 40 C.F.R. Sec. 124.9(b)(6) provides that "NPDES permits, other than permits to new sources ... are not subject to the [EIS] provisions of ... [NEPA]." Cf., Mahelona v. Hawaiian Electric Co., Inc., 418 F.Supp. 1328, 1334 (D.Haw.1976) ("There is no dispute that EPA was required to prepare an EIS only if the discharge facility is a 'new source' "); See generally, Save the Bay, Inc. v. United States Corps of Engineers, 610 F.2d 322, 326 (5th Cir.1980); Simons v. Gorsuch, 715 F.2d 1248, 1251-52 (7th Cir.1983); Conference Report 92-1236, 92d Cong.2d Sess., reprinted in 1972 U.S.CODE CONG. & ADMIN.NEWS, 3668, 3826. Thus, we find that the Agency's determination that Gardinier's proposed phosphogypsum facility is not a new source, and hence, its decision to reissue Gardinier's modified NPDES permit without preparing a full-scale EIS, though subject to a reasonableness standard, would also necessarily withstand an attack under the arbitrary and capricious standard of review as well.DISCUSSION
I.
Manasota-88 contends that the EPA's determination that Gardinier's proposed phosphogypsum disposal area is not a new source is arbitrary and capricious. Manasota-88 argues that the proposed disposal area constitutes construction activity resulting in a new source within the meaning of the regulations. 40 C.F.R. Sec. 122.29(b)(1) provides:
Except as otherwise provided in an applicable new source performance standard, a source is a "new source" if it meets the definition of "new source" in Sec. 122.2, and
(i) It is constructed at a site at which no other source is located; or
(ii) It totally replaces the process or production equipment that causes the discharge of pollutants at an existing source; or
(iii) Its processes are substantially independent of an existing source at the same site. In determining whether these processes are substantially independent, the Director shall consider such factors as the extent to which the new facility is integrated with the existing plant; and the extent to which the new facility is engaged in the same general type of activity as the existing source.
Manasota-88 claims that Gardinier's proposed disposal area will replace the existing disposal area in seven years.
Manasota-88's argument is flawed for several reasons. First, as the EPA and Gardinier note, Gardinier's proposed disposal area and its original proposal for plant capacity expansion were both the subject of EPA's environmental review in 1980. It follows that the proposed disposal area cannot logically be viewed apart from Gardinier's plant and entire modification scheme of 1979, since the field will handle phosphogypsum waste from both the original and expanded plant facilities. Second, as is obvious from the record before us, Gardinier has undertaken and completed construction of its expanded plant facilities in reliance on the EPA's approval in 1981 of the proposed disposal area.
Finally, Gardinier's plans with respect to the proposed disposal area have not changed since the EPA issued Gardinier's modified NPDES permit in 1981. It is apparent that modifications to the proposed disposal facility would support Manasota-88's contention that the area should be viewed as a new source. However, the same proposed disposal facility before the EPA during the Agency's environmental review in 1980 and issuance of the modified NPDES permit in 1981 continued to be before the EPA during reissuance of the permit in 1984, and continues to be before this court at the present time. Based on the foregoing, we cannot say that the EPA's determination that the proposed phosphogypsum disposal area is not a new source was arbitrary or capricious, and therefore, that the Agency's decision not to prepare an EIS was unreasonable. Cf., Burbank Anti-Noise Group v. Goldschmidt, 623 F.2d 115, 116 (9th Cir.1980),cert. denied, 450 U.S. 965, 101 S.Ct. 1481, 67 L.Ed.2d 614 (1981) ("An EIS is not required, however, when the proposed federal action will effect no change in the status quo"); Committee for Auto Responsibility v. Soloman, 603 F.2d 992, 1002-03 (D.C.Cir.1979), cert. denied, 445 U.S. 915, 100 S.Ct. 1274, 63 L.Ed.2d 599 (1980) (same).
II.
Manasota-88 also argues that the EPA has a continuing obligation to implement NEPA as to Gardinier's proposed phosphogypsum disposal facility and to prepare an EIS because "new facts" have undermined the adequacy of the EPA's 1980 environmental review, in general, and the FONSI, in particular. Specifically, Manasota-88 draws this court's attention to: (1) the EPA's 1979 ORP report on radionuclide emissions; (2) a statement of the EPA's Region IV Water Management Division Director during the September 20, 1984, hearing that the Agency's 1980 FONSI did not reflect "additional information"; (3) the EPA's October 31, 1984, Federal Register notice stating the lifetime risks to health from exposure to air emissions from phosphogypsum sites, including the risk of one fatal cancer per year; and (4) the close proximity (less than 600 feet) of the proposed disposal area to the home of Mr. Dan Lyons.
We note that Manasota-88 did not challenge the adequacy of the Agency's environmental review, the scope of the initial new source determination, or the decision to issue Gardinier a modified NPDES permit. Although Manasota-88 has properly challenged the EPA's decision to reissue the permit, it is barred from attacking the Agency's determinations which formed the basis of its decision to issue Gardinier a modified permit or the permit decision itself. It follows that the decision to reissue Gardinier's permit may not be challenged to the extent it is based on the same EPA environmental determinations.
We do acknowledge, however, that the discovery of new facts or information bearing on the EPA's decision to issue a NPDES permit could require the Agency to reassess its prior determinations before reissuing the permit. Cf. 40 C.F.R. Sec. 1502 (i)(1) (requiring agencies to prepare a supplemental EIS if there are substantial changes in the proposed action relevant to environmental concerns, or if there are significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts). Our review of the record discloses no new facts sufficient to require the EPA to reassess its prior determinations, to find that Gardinier's proposed disposal facility is a new source for NPDES permitting purposes, or to prepare an EIS before reissuing Gardinier's permit.
CONCLUSION
Because we see no grounds on which to disturb the action of the EPA in reissuing Gardinier's NPDES permit, we dismiss Manasota-88's petition for review.
PETITION DISMISSED.