Kuper v. Lincoln-Union Electric Co.

1996 SD 145, 557 N.W.2d 748, 1996 S.D. LEXIS 153
CourtSouth Dakota Supreme Court
DecidedDecember 31, 1996
DocketNone
StatusPublished
Cited by77 cases

This text of 1996 SD 145 (Kuper v. Lincoln-Union Electric Co.) is published on Counsel Stack Legal Research, covering South Dakota Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Kuper v. Lincoln-Union Electric Co., 1996 SD 145, 557 N.W.2d 748, 1996 S.D. LEXIS 153 (S.D. 1996).

Opinions

AMUNDSON, Justice.

[¶ 1.] AMUNDSON, J., delivers the majority opinion of the Court on the jury instructions regarding the standard of care required for an energy distributor, preclusion of witness testimony, jury instructions concerning circumstantial evidence, and sufficiency of the evidence, Issues I, II, IV, and V.

[¶ 2.] KONENKAMP, J., delivers the majority opinion of the Court on submission of the case to the jury on the theory of nuisance, Issue III.

[¶ 3.] AMUNDSON, J., writing the majority opinion as to the standard of care required for an energy distributor, preclusion of witness testimony, jury instruction concerning circumstantial evidence, and sufficiency of the evidence, Issues I, II, IV, and V.

[¶ 4.] Lincoln-Union Electric Company (L-U) appeals the jury verdict of $575,283.59 in damages awarded to Douglas L. and Peggy D. Kuper (Kuper). We reverse and remand for a new trial.

FACTS AND PROCEDURAL HISTORY

[¶ 5.] L-U is a rural electric, nonprofit cooperative, existing under SDCL ch 47-21, to supply electrical power to members in Lincoln, Union, Minnehaha, Turner, and Clay Counties. L-U purchases its electricity from [753]*753East River Electric Power, which supplies power to a facility known as the Davis substation. The line carrying the electricity from the substation to the individual farm transformer is at 7,200 volts. The electricity L-U distributes to the farms is reduced at each farm transformer to between 120 and 240 volts and is then delivered to the house and farm buildings. Once the electrical power passes through the meter on the farmstead, the electricity belongs to, and is the responsibility of, the customer.

[¶ 6.] The portion of the system from the substation to the meter pole or individual transformer is known as the primary side, which is the responsibility of L-U. Everything past the meter pole or individual transformer is called the secondary side, which is the responsibility of Kuper. The electricity must make a complete circuit from the substation to Kuper’s farm and back to the substation. On both the primary and the secondary sides of the system, a neutral wire accompanies the “hot” wire. The neutral wire is intended to be the primary path for the current to return to the transformer and the substation. For safety, the electrical wires must be grounded. (This is required by the National Electric Safety Code (NESC), which is the code governing a utility’s construction and maintenance.) South Dakota has codified the NESC standards at SDCL 47-21-75. The ground rod is a steel rod driven into the soil. A wire called a “down ground” is attached to the primary neutral and the ground rod. This results in current flowing into the earth. Part of the current stays on the neutral wire and returns to the substation. Another part of the current returning to the substation on the neutral wire will travel down a ground wire into the earth and uses the earth to return to the substation. Once into the earth, the current follows an infinite number of pathways back to the substation to complete the circuit. This is known as “ground current.”

[¶ 7.] Kuper began dairy farming in 1985 near Lennox, South Dakota. The dairy cows are machine-milked in a dairy barn. In March 1985, after three to four weeks of milking, Kuper noticed that one of the heifers began kicking and stomping like it was getting a shock. Kuper contacted an electrician, Alvin Bossman (Bossman), to investigate. It was at this time that Kuper learned that stray voltage1 could be a factor causing the cow to react. On March 18, 1985, Kuper notified L-U, which was their electricity cooperative, that 1.3 volts of stray voltage had appeared between the dairy barn’s floor and the steel milk pipeline. This exceeds the electrical industry average and L-U’s stated policy maximum of .5 volts.

[¶ 8.] About six months later, Kuper noticed strange and nervous behavior in more cattle. In addition, the herd began to experience severe problems with mastitis.2 Ku-per’s veterinarian examined the herd, their eating habits and living conditions, and could not find a cause for the affliction. Other stray voltage symptoms that arose were a reluctance to enter or exit the barn or stall, irritation or agitation, high-stepping, not eating, kicking or dancing, miscarriages of calves, abnormal tail swishing, reduced butterfat yields and decreased milk production. Kuper’s veterinarian opined stray voltage was the cause of these problems. Kuper’s evidence asserts stray voltage can prevent cows from going into heat and interfere with the development of an embryo after breeding. Also, stray voltage can cause mastitis because the voltage irritates the bottom of a cow’s udder which prevents the udder’s ability to ward off bacteria.

[¶ 9.] In May or June, 1990, Kuper again contacted L-U about the electrical problems. Numerous tests were performed by L-U employees on Kuper’s farm at this time. In June, 1990, L-U installed an isolator to prevent electrical problems.3 This device elimi[754]*754nated the connection between the two neutrals so there would be no path for electricity from the primary side neutral to the secondary side neutral. By the end of 1991 or the beginning of 1992, Kuper again called L-U for assistance when one of their children received a shock in the barn.

[¶ 10.] In May, 1992, Kuper experienced an electrical shock. Bossman completely rewired Kuper’s dairy barn upon suggestion of one of L-U’s employees. Following the rewiring of the barn, L-U performed tests for stray voltage and found no problematic levels. In June, 1992, Kuper sold their least productive cattle and bought replacement heifers. These replacement cattle also showed stray voltage symptoms. On October 23, 1992, L-U tested Kuper’s farm and found no levels of concern. Problems were found in the hóg house, however, which Ku-per rewired in the fall of 1992. • The only time L-U’s testing in Kuper’s barn in December 1992 would show abnormal voltage levels was when chores were performed. In the latter part of 1992 or early 1993, an L-U employee explained to Kuper how voltage can become “ground current.”

[¶ 11.] At L-U’s suggestion, Wes Lane (Lane), a specialist in electrical testing from Otter Tail Power Company, came to the Ku-per farm in January 1993. He took measurements at various locations and found acceptable levels of voltage. After completing his investigation, Lane submitted his report to Kuper and L-U. In February, 1993, Kuper purchased dairy cows from their neighbor. There had been no known previous health problems with these cows, however, after they were moved to Kuper’s barn the cows became nervous and hard to drive into the barn. One newly purchased heifer miscarried her calf. In March, 1993, Kuper purchased from L-U a meter to measure stray voltage. Kuper found measurements in the barn ranged from 7.25 volts to 10.85 volts.

[¶ 12.] During this same time, Kuper hired Gerald Bodman (Bodman), an expert in the field of stray voltage, to come to their farm and conduct tests. Bodman tested every piece of on-farm equipment and did not find sources that contributed to the stray voltage problem. Throughout the day, Bodman was unable to detect any voltage levels which were of a problematic magnitude on the farm. Shortly after 3:00 p.m. on the day of testing, Bodman noticed a recorder change showing .877 volts on a milk pipeline.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Estate of Olsen v. Agtegra Co.
2024 S.D. 39 (South Dakota Supreme Court, 2024)
Ehlebracht v. Deuel Cnty. Pln. Comm'n and Crowned Ridge Wind II, LLC
2022 S.D. 18 (South Dakota Supreme Court, 2022)
Armacost v. Davis
462 Md. 504 (Court of Appeals of Maryland, 2019)
Krsnak v. Brant Lake Sanitary Dist.
2018 SD 85 (South Dakota Supreme Court, 2018)
City of Rapid City v. Big Sky
2018 SD 45 (South Dakota Supreme Court, 2018)
City of Rapid City v. Big Sky, LLC
2018 SD 45 (South Dakota Supreme Court, 2018)
Cifre v. Daas Enterprises, Inc.
62 V.I. 338 (Superior Court of The Virgin Islands, 2015)
State v. Yuel
2013 SD 84 (South Dakota Supreme Court, 2013)
Loper v. JMAR
2013 NMCA 098 (New Mexico Court of Appeals, 2013)
Young v. Oury
2013 S.D. 7 (South Dakota Supreme Court, 2013)
Young v. Oury
2013 SD 7 (North Dakota Supreme Court, 2013)
Wangsness v. Builders Cashway, Inc.
2010 SD 14 (South Dakota Supreme Court, 2010)
Kostel v. Schwartz
2008 SD 85 (South Dakota Supreme Court, 2008)
Steffen v. Schwan's Sales Enterprises, Inc.
2006 SD 41 (South Dakota Supreme Court, 2006)
Atkinson v. City of Pierre
2005 SD 114 (South Dakota Supreme Court, 2005)
Kappenman v. Stroh
2005 SD 96 (South Dakota Supreme Court, 2005)
Hedel-Ostrowski v. City of Spearfish
2004 SD 55 (South Dakota Supreme Court, 2004)
Johnson v. Armfield
2003 SD 134 (South Dakota Supreme Court, 2003)
Collins v. Barker
2003 SD 100 (South Dakota Supreme Court, 2003)

Cite This Page — Counsel Stack

Bluebook (online)
1996 SD 145, 557 N.W.2d 748, 1996 S.D. LEXIS 153, Counsel Stack Legal Research, https://law.counselstack.com/opinion/kuper-v-lincoln-union-electric-co-sd-1996.