Huff v. Union Electric Co.

598 S.W.2d 503
CourtMissouri Court of Appeals
DecidedMarch 11, 1980
Docket40183
StatusPublished
Cited by42 cases

This text of 598 S.W.2d 503 (Huff v. Union Electric Co.) is published on Counsel Stack Legal Research, covering Missouri Court of Appeals primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Huff v. Union Electric Co., 598 S.W.2d 503 (Mo. Ct. App. 1980).

Opinion

SNYDER, Presiding Judge.

This case involves construction of the workmen’s compensation law. Appellants Carl L. Huff, an employee of McCarthy Brothers Construction Company, and his wife, Lillian Mae Huff, brought a third party action based on common law negligence against respondent Union Electric Company. The jury returned a verdict for appellants and assessed damages for the work related injury at $700,000.00. 1 The trial court set aside the verdict and granted respondent’s motion for a new trial on the grounds that it was prejudicially erroneous to give Instruction No. 5 requested by appellants as a converse to respondent’s Instruction No. 4. Instruction No. 4 directed a finding for Union Electric if the jury found facts making it Carl Huff’s statutory employer.

Respondent Union Electric 2 contracted with McCarthy Brothers Construction Company for the purpose of erecting certain electrical transmission line towers along a strip of ground owned by the Terminal Railway Association and adjacent to its railroad track.

*507 There was a written agreement between Terminal and Union Electric under the terms of which Union Electric was allowed to construct and operate a high voltage transmission line on Terminal’s right-of-way. Union Electric is designated the “licensee” in the agreement and Terminal the “licensor.” The agreement was recorded in the office of the St. Louis County Recorder of Deeds. Among other things, the agreement provided that (subject to a $700.00 annual rental rate per linear mile) Union Electric could engage in the construction, maintenance or improvement of transmission lines on Terminal’s property so long as this construction or other allowed activity met with Terminal’s approval and did not interfere with the operation of Terminal’s business.

A 34,500-volt transmission line had been located on the Terminal right-of-way for some time. Union Electric, interested in increasing the capacity of its transmission system, had designed a new transmission line which would carry 138,000 volts and thus help meet the ever-increasing demand for electrical power. The new 138,000-volt line was to be constructed adjacent and parallel to the old 34,500-volt line which was to be torn down and removed after construction of the new line was completed.

Bids were accepted from various contractors for the construction of these new towers, based on a design prepared by Union Electric. The bid of McCarthy Brothers Construction Company was accepted and the firm prepared to perform the work in accordance with its new contract. The contract provided that all work on the project was, “to be performed under the general direction, supervision, and responsibility” of McCarthy Brothers. Union Electric retained the right to inspect upon demand and, of course, the right of final acceptance of the completed work.

The contract further provided that, as work progressed, Union Electric could alter the project’s specifications so as to deal with any special, unanticipated problems which might arise. Hugh Wilson, a Union Electric employee, was appointed “construction supervisor” one of whose responsibilities was to determine the necessity for and extent of any deviation from the original design and inform Harlan Vanderschaff, McCarthy Brothers’ “project engineer.” When apprised of these deviations, Vander-schaff ⅛ job was to implement the changes in the manner prescribed by Wilson.

Appellant Carl L. Huff was employed by McCarthy Brothers in the capacity of “hoisting engineer.” Huff’s specific duty was the operation of heavy machinery and he was, at all times, subject to the direct control of McCarthy Brothers.

In order for Union Electric to maintain electrical service at the required level during construction it was necessary to keep the existing 34,500-volt line energized as much as possible, but realizing the danger inherent in the operation of construction machinery around high voltage wires, a procedure was established for turning off the current in the 34,500-volt line during working hours. Each day, as the work party from McCarthy Brothers arrived, Vander-schaff would call Union Electric and have the existing power lines de-energized.

On February 29, 1972, Vanderschaff followed the usual procedure and received an “all-clear” from Union Electric’s personnel indicating the power lines had been de-en-ergized as he had requested. Work proceeded as usual. Appellant was operating a caterpillar tractor, using it to pull a drilling rig into position. After the rig was positioned, the rig’s drilling boom was raised. As it was raised, appellant dismounted from the tractor to adjust a winch cable which was interfering somehow with raising the boom. He was standing near his tractor holding the inch-and-a-quarter metal winch cable and a pin when the boom either made contact with the 34,500-volt line or came so close that the current arced to the boom. Obviously Union Electric had failed in its duty to de-energize the power lines. Appellant received a severe electrical shock, was rendered unconscious, and taken to a hospital for treatment. The extent of appellant’s injuries is not challenged and is not pertinent to this appeal. There was sub *508 stantial evidence to prove that appellant sustained serious and permanent injuries.

Resolution of this appeal hinges upon whether appellant is a statutory employee of Union Electric. Determination of appellant’s status requires construction of § 287.-040, RSMo 1969 3 which sets forth the law as to statutory employees in subparagraph one and an exception to the statutory employee provision in subparagraph three. 4 Construction of the statute requires definition of the words “owner” and “improvements” as they are used in subparagraph three.

If Union Electric had work which was in the usual course of its business done under contract, on its premises, it would have been liable as the statutory employer of Huff, the employee of McCarthy Brothers Construction Company and thus would be shielded from common law liability. § 287.-040.1.

On the other hand if Union Electric were the owner of premises upon which improvements were being erected by an independent contractor under § 287.040.3, the exception applies; Union Electric was not a statutory employer, and Union Electric is subject to suit by Huff for damages based on common law negligence.

In reviewing a trial court judgment granting a new trial an appellate court is more liberal in affirming the judgment than it would be had the motion for a new trial been denied. Douglass v. Missouri Cafeteria, Inc., 532 S.W.2d 811, 813[1-3] (Mo.App.1975).

Appellant relies on four points in support of his claim that the trial court erred in granting respondent’s motion for a new trial. Three of the points relate to Instruction No. 5 which the trial court held to be erroneous. In his fourth point appellant contends that the trial court erred in holding that appellant was required to plead § 287.-040.3 as an affirmative avoidance of respondent’s pleading of the affirmative defense of statutory employee under § 287.040.1.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

State v. Swartz
517 S.W.3d 40 (Missouri Court of Appeals, 2017)
Pool v. Farm Bureau Town & Country Insurance Co.
311 S.W.3d 895 (Missouri Court of Appeals, 2010)
McCracken v. Wal-Mart Stores East, LP
298 S.W.3d 473 (Supreme Court of Missouri, 2009)
In Re the Care & Treatment of Van Orden
271 S.W.3d 579 (Supreme Court of Missouri, 2008)
McGrath v. VRA I LIMITED PARTNERSHIP
244 S.W.3d 220 (Missouri Court of Appeals, 2008)
Looper v. Carroll
202 S.W.3d 59 (Missouri Court of Appeals, 2006)
Nunn v. CC MIDWEST
151 S.W.3d 388 (Missouri Court of Appeals, 2004)
Seeley v. Anchor Fence Co.
96 S.W.3d 809 (Missouri Court of Appeals, 2002)
Howell v. Lone Star Industries, Inc.
44 S.W.3d 874 (Missouri Court of Appeals, 2001)
Estate of Williams v. Williams
12 S.W.3d 302 (Supreme Court of Missouri, 2000)
Overcast v. Billings Mutual Insurance Co.
11 S.W.3d 62 (Supreme Court of Missouri, 2000)
James v. Union Electric Co.
978 S.W.2d 372 (Missouri Court of Appeals, 1998)
Wince v. McGarrah
972 S.W.2d 641 (Missouri Court of Appeals, 1998)
Mitchell v. K.C. Stadium Concessions, Inc.
865 S.W.2d 779 (Missouri Court of Appeals, 1993)
Mooney v. Missouri Athletic Club
859 S.W.2d 772 (Missouri Court of Appeals, 1993)
Porter v. Erickson Transport Corp.
851 S.W.2d 725 (Missouri Court of Appeals, 1993)
Hayslett v. Harnischfeger Corp.
815 F. Supp. 1294 (W.D. Missouri, 1993)

Cite This Page — Counsel Stack

Bluebook (online)
598 S.W.2d 503, Counsel Stack Legal Research, https://law.counselstack.com/opinion/huff-v-union-electric-co-moctapp-1980.