Grasso v. The Lisnacrieve

87 F. 570, 1898 U.S. Dist. LEXIS 83
CourtDistrict Court, E.D. New York
DecidedMay 2, 1898
StatusPublished
Cited by7 cases

This text of 87 F. 570 (Grasso v. The Lisnacrieve) is published on Counsel Stack Legal Research, covering District Court, E.D. New York primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Grasso v. The Lisnacrieve, 87 F. 570, 1898 U.S. Dist. LEXIS 83 (E.D.N.Y. 1898).

Opinion

THOMAS, District Judge.

On the 17th day of August, 1896, the libelant, a longshoreman, was working aboard the steamship Lisnacrieve, under the employment of T. Monaghan, a stevedore, with whom a contract had been made by the charterers to discharge a cargo of asphalt. The ship was lying at the foot of Fifty-Second street, in the city of New York. The asphalt was brought up from the hold of the vessel by means of iron tubs, furnished by the contracting stevedore, hoisted by means of a block and. tackle, passing to one of the winches of the vessel, which was run by one of the seamen of the vessel’s crew. The libelant, together with other longshoremen, was engaged in the lower part of the cross bunker hold of the steamship, loading asphalt into the tubs, dragging them towards, but not directly under, the hatchway, and fastening the hook attached to the line to the bail of the tub. A gangwayman, Avith an assistant, employed by the stevedore, was stationed at the mouth of the main deck hatch of the hold, whose duty it was to guide the tubs as they were hoisted out of the hold, so as to prevent them from catching against the coamings or other obstructions, and also to' give signals to the winchman of the No. 3 winch when to start and when to stop, these signals being given by means of a whistle, as the winchman was not in sight of the gangwayman. It appears that the casement of the donkey boiler protruded beneath the hatch into the hold of the vessel, and that a man in the employ of the stevedore was stationed upon such casement, to prevent the tub striking the casement in its descent, and to steady the tub, until it reached' the top of the casement, and thereafter give it proper direction. When it had been thus steadied, and was in a proper line of the hatch opening, it was allowed to proceed rapidly upon its way out of the hatch. When the tub was ready to be lifted from the bottom of the hold, one sharp whistle was given by the gangwayman on the main deck. This meant that the winchman should start easily and go slowly. When the tub reached the top of the casing, if it was not in proper position, another signal was given, which meant that the winch should be stopped, to allow the person stationed on the casing to adjust the position of the tub to the opening above. This having been done, a long reverberating whistle was [571]*571given, which indicated tliat (lie winch should go rapidly, to carry the tub onto the main deck. Generally speaking, speed was desirable, as it expedited the fulfillment of the stevedore’s contract.

It is claimed on the part of the libelant that he was injured in the foliowing manner: A tub, drawn partially towards, but not directly under, the open hatch, received the hook, and the signal to start and go easily was given. Instead of starting slowly, the winelunan started rapidly, causing (he tub to swing into the hatch, and oscillate from one side to the other, in a dangerous manner, and so as to strike against the easing about the boiler, or the coamings of the hatch, or both. The gangwayman, seeing this condition, gave a signal to stop, but the winchman did not stop, and thereupon the gangwayman gave three more shrill whistles, indicating, as lie .says, that the winchman should stop, but the tub was drawn up through the open hatchway. While the tub was making this passage, one or more pieces of asphalt fell from it, striking the libelant, who was in the hold below.

The evidence seems to be preponderating that, in first lifting the tub from the bottom of the hold, the custom was to go slowly, and that previous to this time the winchman had observed that custom. The libelant shows by several witnesses that (he winchman lifted .the tub in question with an unusually rapid motion, and it appears fairly that the unusual swinging motion was given to the tub by the rapidity of the motion thus imparted. If this evidence is to be believed, tin1 winchman was negligent. And as the claimant produce's no satisfactory and competent evidence of due speed, but: rather relies upon inferences to be drawn from the previous good work, capacity, and skill of the winchman, the evidence of the libelant in this regard must be accepted. Therefore, as the negligent act of the winchman is a sufficient cause' for the injury, the question remains whether the claimant must respond for this negligent act.

It is a rule well settled that, although a person undertakes to do an act gratuitously, yet he is not: relieved from using suitable care in so doing. And allhough the ship in the present case equipped and operated the winch without being constrained thereto by any contractual obligation, yet the undertaking imposed the duty of due care.

It is said that the winchman, although furnished by the shipowners, was not; at all under their charge or direction, but for the time was in the service of the contracting stevedore, subject to his orders, and that: he thereby became a fellow servant of the libelant, and that if, therefore, the accident happened from the negligence of the winchman, it was the negligence of a fellow servant, for which neither the contracting stevedore nor the shipowners would be liable.

The stevedore made his contract with the charterers, and it does not appear who was to furnish engines for hoisting and men to operate the same. The claimant contends tliat: the stevedore stated that he could not get a man to properly drive the winch, and tliat thereupon the ship furnished the winchman in question. The day previous to the accident, however, as the win rhea were otherwise in use, the ship employed a floating engine and an engineer to do the same work, and bore the expense thereof. This would seem to indicate some sense of obligation on the part of the shipowners to [572]*572furnish the hoisting power. In any case, the ship did undertake to do a certain portion of the work of unloading. Such an undertaking is not merely loaning a servant to the stevedore. It is a co-operation on the part of the ship in the work of unloading the cargo, precisely to the same extent as if two independent stevedores had contracted for a division of labor in discharging the cargo, one furnishing the tackle' and hoisting power, and the other furnishing men and appliances for the remainder of the work. It does not change this relation that the winehman was to run his winch, or stop his winch, or graduate the speed thereof, as the stevedore’s servant signaled him to do. Independent contractors and their servants are often called upon to direct and advise each other in movements and acts relating to the common work, and such often is the case between the contractor and the person with whom the contract is made. The fact that the servant of one of the parties regulates his acts by the actions of the servants of the other does not make them co-servants. In the present case the winehman was a general servant of the ship. He was put in charge of the ship’s machinery, to perform a duty that the ship had assumed the duty of performing. He went to his post of duty, or left the same, by no command of the stevedore, but simply because his master or his delegated agent so directed him. True, the stevedore gave him a signal, and it was his duty to obey it; but this duty sprang from no contract of hiring made by the winehman with the stevedore, but purely or wholly from the relation of master and servant that existed between the winehman and the shipowners. When the stevedore signaled him to hoist, he was at perfect liberty to disobey this order, so far as the stevedore was concerned, and the stevedore was helpless.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Stewart v. Atlantic Gulf & PacifIc Co.
9 F. Supp. 344 (S.D. Florida, 1934)
Gorham v. Cunard S. S. Co.
254 F. 716 (D. Maine, 1918)
Western Union Telegraph Co. v. Rust
120 S.W. 249 (Court of Appeals of Texas, 1909)
Stevenson v. The Steamship Boveric
3 Alaska 457 (D. Alaska, 1907)
Otis Steel Co. v. Wingle
152 F. 914 (Sixth Circuit, 1907)
The City of San Antonio
143 F. 955 (Fourth Circuit, 1906)
The Slingsby
120 F. 748 (Second Circuit, 1903)

Cite This Page — Counsel Stack

Bluebook (online)
87 F. 570, 1898 U.S. Dist. LEXIS 83, Counsel Stack Legal Research, https://law.counselstack.com/opinion/grasso-v-the-lisnacrieve-nyed-1898.