Federal Energy Regulatory Commission v. City Power Marketing, LLC

199 F. Supp. 3d 218, 2016 U.S. Dist. LEXIS 105421, 2016 WL 4250233
CourtDistrict Court, District of Columbia
DecidedAugust 10, 2016
DocketCivil Action No. 2015-1428
StatusPublished
Cited by8 cases

This text of 199 F. Supp. 3d 218 (Federal Energy Regulatory Commission v. City Power Marketing, LLC) is published on Counsel Stack Legal Research, covering District Court, District of Columbia primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Federal Energy Regulatory Commission v. City Power Marketing, LLC, 199 F. Supp. 3d 218, 2016 U.S. Dist. LEXIS 105421, 2016 WL 4250233 (D.D.C. 2016).

Opinion

MEMORANDUM OPINION

JOHN D. BATES, United States District Judge

City Power Marketing, LLC, an energy-trading firm founded by K. Stephen Tsin-gas, engaged in “virtual trading” in wholesale electricity markets. Virtual traders do not actually supply or receive electricity but instead stake out market positions that are effectively bets on how electricity prices will change over time. In other words, they engage in a kind of arbitrage. And their efforts are generally thought to improve the overall efficiency of energy markets.

According to the Federal Energy Regulatory Commission (FERC or Commission), however, in July 2010 City Power engaged in a series of manipulative virtual trades that hurt the market while generating more than $1 million of profit for City Power. In essence, City Power found a way to place trades that had no risk of earning or losing money on the basis of price changes but that nonetheless triggered a financial credit for City Power from the market operator. After a lengthy investigation, FERC concluded that these trades constituted a fraudulent scheme that violated the Commission’s Anti-Manipulation Rule, 18 C.F.R. § lc.2. FERC also concluded that by failing to reveal the existence of certain archived instant messages during the investigation, City Power had violated the Commission’s Market Behavior Rule 3, 18 C.F.R. § 35.41(b), which requires truthful communications by parties subject to FERC’s authority. FERC ordered City Power to disgorge its profits and assessed penalties of $15 million on City Power and Tsingas. Disputing their liability, City Power and Tsingas did not pay. As provided for in the Federal Power Act, FERC therefore filed this action seeking an order affirming its penalty assessment.

City Power and Tsingas—whom the Court will collectively call “City Power,” unless context indicates otherwise—have moved to dismiss, arguing that FERC’s *222 claims under both the Anti-Manipulation Rule and Market Behavior Rule 3 fail as a matter of law. City Power also argues that this case should be treated like a normal civil action subject to the Federal Rules of Civil Procedure, not a summary review of agency action. The Court largely agrees with City Power on this latter point, and will follow the normal course of district-court adjudication. But the Court disagrees that FERC’s claims are unsound. Assuming the truth of FERC’s allegations, as the Court must at this stage, FERC has stated plausible claims under both the Anti-Manipulation Rule and Market Behavior Rule 3. City Power’s motion to dismiss will therefore be denied.

BACKGROUND

I. PJM’S Wholesale Electricity Market

This case concerns allegedly illegal trading in the wholesale electricity market run by PJM Interconnection, LLC (PJM). PJM is the independent, nonprofit Regional Transmission Organization (RTO) that administers the electric grid in a 13-state region that extends from North Carolina to New Jersey to Illinois and includes the District of Columbia. As part of administering the grid, PJM operates a wholesale electricity auction of the sort recently described by the Supreme Court:

These wholesale auctions serve to balance supply and demand on a continuous basis, producing prices for electricity that reflect its value at given locations and times throughout each day. Such a real-time mechanism is needed because, unlike most products, electricity cannot be stored effectively. Suppliers must generate—every day, hour, and minute—the exact amount of power necessary to meet demand from the utilities and other “load-serving entities” (LSEs) that buy power at wholesale for resale to users. To ensure that happens, wholesale market operators [such as PJM] obtain (1) orders from LSEs indicating how much electricity they need at various times and (2) bids from generators specifying how much electricity they can produce at those times and how much they will charge for it. Operators accept the generators’ bids in order of cost (least expensive first) until they satisfy the LSEs’ total demand. The price of the last unit of electricity purchased is then paid to every supplier whose bid was accepted, regardless of its actual offer; and the total cost is split among the LSEs in proportion to how much energy they have ordered. So, for example, suppose that at 9 a.m. on August 15 four plants serving Washington, D.C. can each produce some amount of electricity for, respectively, $10/unit, $20/ unit, $30/unit, and $40/unit. And suppose that LSEs’ demand at that time and place is met after the operator accepts the three cheapest bids. The first three generators would then all receive $30/ unit.

FERC v. Elec. Power Supply Ass’n, — U.S. -, 136 S.Ct. 760, 768-69, 193 L.Ed.2d 661 (2016). The clearing price at a particular location, or “node,” on the PJM grid is called the “locational marginal price” (LMP).

PJM operates a so-called “dual settlement market,” meaning that it runs two rounds of bidding for each operating day. It first runs a “day-ahead market,” which “allows market participants to secure prices for electric energy the day before the operating day and hedge against price fluctuations that can occur in real time. One day ahead of actual dispatch, participants submit supply offers and demand bids for energy. These bids are applied to each hour of the day and for each pricing location [i.e., node] on the system.” FERC, *223 Energy Primer: A Handbook of Energy Market Basics 95 (Nov. 2015). PJM takes all of the bids and offers, crunches the numbers, and determines what the clearing price—the “day-ahead LMP”—will be at each node. Generators who offered to supply energy for less than the clearing price are committed to supply that energy and are paid the day-ahead LMP; buyers who bid to purchase energy for more than the clearing price are committed to their purchases and pay the day-ahead LMP. Id.

The next day’s actual' supply of and demand for electricity, however, might be different from what the day-ahead market presumed. A generation unit might unexpectedly fail, affecting supply, or' the weather might be much different than predicted, affecting demand. PJM therefore also runs a “real-time market” designed “to meet energy needs within each hour of the current day.” Id. (The real-time market is also sometimes called the “spot market” or “balancing market.”) As the name suggests, offers and bids in this market are made in real time. “Real-time LMPs are calculated at five-minute intervals based on actual grid operating conditions as calculated in PJM’s market systems.” Id.

PJM’s wholesale market is not restricted to those engaging in “physical transactions,” ie., those who will actually deliver or actually receive electricity. Traders’who neither have nor want actual megawatts can engage in “virtual transactions.”

A virtual transaction does not require generation to. be dispatched or load to be served. Rather, it allows a market participant to arbitrage day-ahead versus real-time prices by either purchasing or selling a position in the day-ahead market, and then doing the opposite in an equal volume at the same location in the real-time market, thereby taking no physical position when the system is dispatched.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

FERC v. Powhatan Energy Fund, LLC
949 F.3d 891 (Fourth Circuit, 2020)
Fed. Energy Regulatory Comm'n v. Powhatan Energy Fund, LLC
286 F. Supp. 3d 751 (E.D. Virginia, 2017)
Moeller v. LaFleur
246 F. Supp. 3d 130 (District of Columbia, 2017)
Federal Energy Regulatory Commission v. Barclays Bank PLC
247 F. Supp. 3d 1118 (E.D. California, 2017)
Federal Energy Regulatory Commission v. Silkman
233 F. Supp. 3d 201 (D. Maine, 2017)

Cite This Page — Counsel Stack

Bluebook (online)
199 F. Supp. 3d 218, 2016 U.S. Dist. LEXIS 105421, 2016 WL 4250233, Counsel Stack Legal Research, https://law.counselstack.com/opinion/federal-energy-regulatory-commission-v-city-power-marketing-llc-dcd-2016.