Fay, Spofford & Thorndike, Inc. v. Massachusetts Port Authority

387 N.E.2d 206, 7 Mass. App. Ct. 336, 1979 Mass. App. LEXIS 1157
Massachusetts Appeals Court·Decided April 2, 1979·Published·Cited by 37 cases

Opinion

Kass, J.

Massachusetts Port Authority (Massport) entered into a written contract engaging the engineering services of Fay, Spofford & Thorndike, Inc. (FST), to design improvements for a runway at Logan Airport. After FST completed the design work and, indeed, after bids had been received from contractors, Massport reduced the scope of the work substantially. The parties ask us to resolve the manner in which Massport should compensate FST for designing that portion of the work which Massport decided not to build.

Procedurally, the case comes to us on Massport’s appeal from the entry of a judgment based on allowance of FST’s motion for summary judgment under Mass.R.Civ. P. 56, 365 Mass. 824 (1974). We draw the facts of the case from FST’s complaint, which sought a declaratory judgment, and FST’s affidavit in support of its motion for summary judgment.

The parties entered into a contract drawn by Massport and submitted to FST, which signed it on February 14, 1974. The agreement was countersigned on behalf of Massport on March 8,1974. FST had earlier outlined the fundamental business terms of the contract in a written response to a request for a proposal from Massport. The contract outlines the scope of the project and the engineer’s responsibility in general terms and then provides that FST is to perform its services in two phases, the [338] design stage and the construction stage. The design stage is subdivided into eleven subcategories including preliminary designs and estimates, preparation of long lead construction materials, and preparation of detailed working drawings and specifications "suitable for advertising for bids and award of construction contract,” preparation of a final cost estimate, and assistance in the award of a construction contract. Under the caption heading of "Design Stage” are two subparagraphs, (j) and (k), which impose on FST the obligation of checking shop drawings of the contractor and subcontractors, consultation and advice during construction, and checking and certifying the "As-Built” drawings of the contractor at the completion of construction. By their nature these duties would, in fact, be performed after the project had been designed and during the time it was under construction. The second, or construction, stage deals with providing the services of a full-time resident engineer and assistants to supervise construction. Other than that, the subparagraphs of the section purporting to define the scope of construction stage services speak more of warranties of the professional competence of FST’s performance, rather than of the nature of services during the construction stage.

Section 3 of the contract gets to the heart of the matter: the terms and method of payment. Paragraph A provides for a fee to FST based on "a percentage of the Project Construction Cost determined in accordance with and shown on the B Curve contained in the ASCE [American Society of Civil Engineers] Manual No. 45 dated 1972 ... less 0.4 percent. Said percentage shall then be applied to the total contract price as provided in the construction contract.” Paragraph B of section 3 of the contract provides that Massport shall pay for services rendered under the design phase "periodically as the work progresses; provided, however, that the Owner shall retain fifteen (15%) percent which shall be due and payable upon completion of the construction and all services provided for herein.”

[339] Section 7 of the contract deals with termination. It gives Massport the right to terminate the agreement with FST at any time, with or without cause. If Massport terminates prior to completion of items (a) through (h) of the design stage, "then the Engineer’s entire fee for services rendered hereunder shall be computed, notwithstanding the provisions of Paragraph 3 herein,” on the basis of a multiple of payroll.

Items (a) through (h) of the design stage work had been completed by FST and, therefore, to the extent that section 7 dealt with partial termination, subparagraph B applied. The terms of this paragraph were that if "Owner terminates ... subsequent to the design stage, then the Owner and the Engineer shall agree in writing upon an estimated construction cost of the Project. The Engineer’s fee shall then be computed so as to equal 85% of the fee provided for in section 3A hereof.” There has been no express agreement between the parties as to what constituted the "estimated construction cost of the project” under section 7B.

In connection with its design stage work, FST estimated the cost of the project at $3,195,225. On the basis of this estimate, Massport advertised for bids on the runway improvements job. The lowest of the qualified bids received was for $2,941,717, actually less than the FST estimate. After the bids were opened, Massport for reasons of policy unrelated to FST’s work or to the cost estimates decided to delete a major component of the runway improvements. At Massport’s request, FST prepared forms for the successful contractor to sign which reduced the scope of the work from the $2,941,717 bid figure to a $1,761,002 contract figure. Massport entered into a construction contract in the amount of the lower figure with the successful bidder, M. DeMatteo Construction Co.

FST claims a design fee based on the job as designed, without reduction in scope, and urges that the DeMatteo bid of $2,941,717 be treated as the construction cost or estimated construction cost of the project for purposes of [340] the contract. Massport takes the position that the design stage fee is payable on the basis of the construction contract price, i.e., the contract as let for the diminished job, and that FST’s entitlement to compensation for designing that portion of the job which was cancelled should be calculated on a quantum meruit basis.

Free access — add to your briefcase to read the full text and ask questions with AI

Fay, Spofford & Thorndike, Inc. v. Massachusetts Port Authority, 387 N.E.2d 206, 7 Mass. App. Ct. 336, 1979 Mass. App. LEXIS 1157 (Mass. Ct. App. 1979).

387 N.E.2d 206 (Fay, Spofford & Thorndike, Inc. v. Massachusetts Port Authority) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Cocchi v. Morais Concrete Service, Inc.
2015 Mass. App. Div. 49 (Mass. Dist. Ct., App. Div., 2015)
Partylite Gifts, Inc. v. MacMillan
895 F. Supp. 2d 1213 (M.D. Florida, 2012)
Targus Group International, Inc. v. Sherman
922 N.E.2d 841 (Massachusetts Appeals Court, 2010)
Polito v. School Committee of Peabody
868 N.E.2d 624 (Massachusetts Appeals Court, 2007)
Quaboag Transfer, Inc. v. Halpin
19 Mass. L. Rptr. 257 (Massachusetts Superior Court, 2005)
Moore v. October Corp.
Maine Superior, 2004
Diamond Crystal Brands, Inc. v. Backleaf, LLC
803 N.E.2d 744 (Massachusetts Appeals Court, 2004)
Zero Stage Capital, Inc. v. Harvard Clinical Technology, Inc.
14 Mass. L. Rptr. 690 (Massachusetts Superior Court, 2002)
DeLorenzo v. Tzokos
2001 Mass. App. Div. 179 (Mass. Dist. Ct., App. Div., 2001)
NEA-Coffeyville v. Unified School District No. 445
996 P.2d 821 (Supreme Court of Kansas, 2000)
Recoll Management Corp. v. Stone & Webster Engineering Corp.
11 Mass. L. Rptr. 337 (Massachusetts Superior Court, 1999)
Moda v. Terminex International Co.
1999 Mass. App. Div. 264 (Mass. Dist. Ct., App. Div., 1999)
Snow v. Fitian
1998 Mass. App. Div. 227 (Mass. Dist. Ct., App. Div., 1998)
Fraser and Wise, PC v. Primarily Primates, Inc.
966 F. Supp. 63 (D. Massachusetts, 1996)
Mass Cash Register, Inc. v. Comtrex Systems Corp.
901 F. Supp. 404 (D. Massachusetts, 1995)
Annis v. American Science & Engineering, Inc.
4 Mass. L. Rptr. 75 (Massachusetts Superior Court, 1995)
Person v. Flynn
4 Mass. L. Rptr. 74 (Massachusetts Superior Court, 1995)
Stavaridis v. Dynamic Machine Works, Inc.
2 Mass. L. Rptr. 446 (Massachusetts Superior Court, 1994)
SED Associates, Inc. v. Phineas Alpers Architect, Inc.
1994 Mass. App. Div. 35 (Mass. Dist. Ct., App. Div., 1994)