Equistar Chemicals, LP v. Clydeunion DB, Limited

579 S.W.3d 505
CourtCourt of Appeals of Texas
DecidedMay 16, 2019
Docket14-17-00791-CV
StatusPublished
Cited by7 cases

This text of 579 S.W.3d 505 (Equistar Chemicals, LP v. Clydeunion DB, Limited) is published on Counsel Stack Legal Research, covering Court of Appeals of Texas primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Equistar Chemicals, LP v. Clydeunion DB, Limited, 579 S.W.3d 505 (Tex. Ct. App. 2019).

Opinion

Reversed and Rendered and Opinion filed May 16, 2019.

In The

Fourteenth Court of Appeals

NO. 14-17-00791-CV

EQUISTAR CHEMICALS, LP, Appellant V. CLYDEUNION DB, LIMITED, Appellee

On Appeal from the 190th District Court Harris County, Texas Trial Court Cause No. 2014-71897

OPINION

A dispute arose between Equistar Chemicals, LP and ClydeUnion DB, Limited after Equistar purchased some pumps from ClydeUnion, and the pumps did not function well and became damaged. Equistar sued ClydeUnion for breaches of warranties, among other claims, and ClydeUnion sued Equistar for breach of contract because Equistar did not pay the full price for the pumps. A jury found that ClydeUnion breached an express warranty, and Equistar breached the contract. But the jury awarded Equistar only a fraction of the damages that Equistar had requested, and the jury found that Equistar had not given ClydeUnion “a reasonable opportunity to cure the breaches of warranties.” Based on the jury’s findings, or possibly the trial court’s application of the offer- of-settlement statute and rule concerning the recovery of litigation costs, the trial court signed a judgment that Equistar take nothing and ClydeUnion recover damages on its breach of contract claim.

Equistar appeals, contending that the trial court erred by (1) admitting, and rendering judgment on, unreliable and conclusory expert testimony; (2) excluding evidence of a letter written by ClydeUnion’s attorney; (3) not disregarding the jury’s answer concerning the “opportunity to cure” question; and (4) rendering a judgment for ClydeUnion on its counterclaim after applying the offer-of-settlement statute and rule.

We overrule Equistar’s first two issues and sustain the latter two issues. Accordingly, we reverse the trial court’s judgment and render a judgment that both parties take nothing.

I. BACKGROUND

Equistar had been using some pumps to help transport ethane from one location to another, but the pumps were unreliable. So, Equistar ordered two specially designed pumps from ClydeUnion with the expectation that Equistar would be able to use the pumps to transport an increased capacity of ethane. Equistar anticipated that one pump would be operated at a time while the second pump served as a spare.

2 When ClydeUnion delivered the first pump, Equistar tried to operate it in December 2012. Part of the pump failed, and it had to be shut down. During the initial startup, the pump displayed subsynchronous vibrations. “Subsynchronous vibrations” means that there is a “whirl” in a pump, and “something is beating itself up” inside the pump. The pump was started again in early January 2013, but it had to be shut down after a few hours because the pump’s bearings became too hot. The pump also displayed subsynchronous vibrations.

Equistar started the pump again in late January but had to shut it down the following day. Again, the pump had high temperatures and subsynchronous vibrations. This time, the vibrations reached 5.5 mils, which was above the allowable maximum vibration of 1.67 mils according to the American Petroleum Standards. ClydeUnion told Equistar that the pumps were satisfactory and could be run with the vibrations. But the vibrations remained a major concern for Equistar. Equistar insisted on additional rotordynamic analysis, which ClydeUnion said was unnecessary.

In March 2013, Equistar hired a General Electric company, Bently Nevada, to collect more detailed vibration data from the pump. The data showed “a large amount of subsynchronous vibration” as high as 5.6 mils with “steady state values near 2.6 mils.” At trial, ClydeUnion presented evidence that Equistar did not provide the Bently Nevada data to ClydeUnion until after litigation began.

Equistar continued to run the pump until the second ClydeUnion pump arrived. The second pump was started in April and had a failure with the oil cooler within about forty-five minutes. The second pump also experienced subsynchronous vibrations as high as 6.2 mils.

Equistar restarted the first pump again in April and ran it through May or June. There were still issues, however, with high temperatures and vibrations and 3 seals leaking oil. The vibration levels kept climbing, and Equistar and ClydeUnion agreed to shut down the pumps when the vibrations reached 4 mils. A ClydeUnion engineer testified that they “all felt massively disappointed at this point” and knew that the pump “had to come out.” ClydeUnion recommended that the pump be taken out of service.

In June 2013, Equistar sent the second pump to another company, HydroTex, to be opened and evaluated. They discovered that the second pump had a cracked shaft and other damage inside. Based on this information, Equistar also shut down the first pump and sent it for evaluation. The first pump’s shaft was also cracked. The pumps could not be safely operated with cracked shafts.

Equistar began working on modifications to Equistar’s old pumps for more reliable ethane transportation. By November 2013, Equistar was able to use the old pumps to transport an amount of ethane equal to Equistar’s expected capacity from the ClydeUnion pumps. After Equistar’s need to transport significant quantities of ethane ceased in September 2014, Equistar got a bid from HydroTex to repair and modify the two ClydeUnion pumps with delivery to take place in eight to ten weeks.

Equistar sued ClydeUnion for breach of warranty, and ClydeUnion countersued for breach of contract because Equistar failed to pay the full price for the pumps. The jury found that Equistar notified ClydeUnion of breaches of warranties within a reasonable time after Equistar discovered or should have discovered the breaches, but Equistar did not “give ClydeUnion a reasonable opportunity to cure the breaches of warranties.” The jury awarded Equistar $391,694 in damages on the breach of warranty claim. The jury also found that Equistar failed to comply with the agreement to pay the full price for the pumps, and the jury awarded ClydeUnion $150,781.06 for the breach of contract claim.

4 After considering the parties’ post-verdict motions, the trial court rendered a judgment for ClydeUnion in the amount of $150,781.06. Equistar appeals.

II. EXPERT TESTIMONY

In its first issue, Equistar contends that the trial court erred by “admitting, and rendering judgment on, unreliable and conclusory expert testimony that artificially limited the magnitude of Equistar’s lost profits.”1 Equistar complains about ClydeUnion’s expert on damages, David Townsend, basing his opinion about lost profits damages on two assumptions: (1) the pumps should have been taken out of service in March 2013; and (2) the pumps could have been repaired in ten weeks. Based on these assumptions, Townsend opined that Equistar’s lost profits damages should have been measured based on a shorter time period compared to the time period used by Equistar’s expert. Using the same methodology for calculating damages as Equistar’s expert, Townsend opined that Equistar’s lost profits damages for the shorter time period were about $37,500— must less than Equistar’s proposed damages of about $5.1 million. The jury awarded Equistar an amount of lost profits damages consistent with Townsend’s opinion. And, consistent with ClydeUnion’s theory that the pumps could have been repaired before Equistar modified its old pumps for more reliable ethane transport, the jury did not award Equistar any damages for the modifications.

A. Legal Principles

To be admissible, an expert’s opinion testimony must have a reliable foundation. Ford Motor Co. v. Ledesma, 242 S.W.3d 32, 38 (Tex. 2007). We

1 The issue appears multifarious.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
579 S.W.3d 505, Counsel Stack Legal Research, https://law.counselstack.com/opinion/equistar-chemicals-lp-v-clydeunion-db-limited-texapp-2019.