Duet v. Louisiana Power & Light Co.

169 F. Supp. 184, 1958 U.S. Dist. LEXIS 3025
CourtDistrict Court, E.D. Louisiana
DecidedDecember 30, 1958
DocketCiv. A. Nos. 7036, 7037
StatusPublished
Cited by7 cases

This text of 169 F. Supp. 184 (Duet v. Louisiana Power & Light Co.) is published on Counsel Stack Legal Research, covering District Court, E.D. Louisiana primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Duet v. Louisiana Power & Light Co., 169 F. Supp. 184, 1958 U.S. Dist. LEXIS 3025 (E.D. La. 1958).

Opinion

J. SKELLY WRIGHT, District Judge.

These cases, consolidated for trial, are suits for damages arising out of the construction of an electric transmission line across plaintiffs’ property by the defendant Louisiana Power & Light Company. Mrs. Duet and Earl Guidry, brother and sister, are adjoining landowners. Their property, taken together,1 has a 192' front on the left descending, or east, bank of Bayou Lafourche and runs in a generally easterly direction between parallel lines approximately 8,000'. For the first 1,000' this property may be described as high land in that it is ordinarily dry. The property from 1,000' off the bayou to the rear is typical Louisiana marshland, subject to tidal inundation from time to time.

In 1952 plaintiffs, with the advice- and monetary aid of the United States Department of Agriculture, Soil Conservation Service, constructed a drainage canal along the common boundary of. their properties. The canal commences where the high land ends and the marshland begins and runs to the rear where [185]*185it empties into a district drainage canal. The purpose of the canal between the properties is to drain the high land, the water on the marshland being generally unaffected thereby. The canal is 3 to 4 feet deep, 12 to 18 feet wide with sloping banks and a levee on the south or Guidry side formed with the earth displaced in digging the canal. The cost of constructing the canal was $550, part of which was paid by the U. S. Department of Agriculture. Although designed solely for drainage, the canal is sometimes now used for navigation of small boats such as pirogues and skiffs with small outboard motors. The levee along the canal is used as a cattle walk from the high land in front part of the property through the marshland to a relatively high area in the rear where in some seasons cattle are able to graze.

By virtue of judgments of expropriation in state court proceedings, the Louisiana Power & Light Company obtained an “easement (100 feet wide) over and across the tract of land” owned by plaintiffs. The easement is 3,600' off Bayou Lafourche and runs generally parallel to it, across the marshland part of the property. As to the land of each plaintiff, it measures 100' wide and 103' long, being on a slight diagonal across the 96-foot-wide tracts. The state court judgments further provided that “the rights of plaintiff are over and across, with the right of ingress and egress, on the tract of land * * Across the right of way, and others similarly acquired from adjoining property holders, this defendant power company had constructed, through an independent contractor, a high voltage electric transmission line suspended from 2-pole “H” frame supports placed several hundred yards apart through the marshland. During the construction, marshbuggies and a dragline of the independent contractor crossed the right of way, the levee and the canal on plaintiffs’ property. In so doing the weight of this equipment compacted and lowered the level of the levee and cut away a portion of the north bank of the canal. Some of the earth from the banks slipped into the canal thereby decreasing its depth in the part affected. Marshbuggy impressions were left in the marsh, and in a few instances, since the property is not well marked, some of the contractor’s equipment may have trespassed outside the right of way.

Under the contract with the power company, the independent contractor erecting the transmission line was required, after construction, to proceed with clean-up activities along the route of the line, repairing any damage to the property caused by the work. In early November 1956 this clean-up phase of the construction operation reached the properties of the plaintiffs. Defendant’s contractor obtained the construction plans of the drainage canal from the U. S. Department of Agriculture and set about restoring the.canal in accordance with those plans. By using a dragline, spoil which had slipped into the canal during construction was scooped out and deposited on the depressed levee, on the earth between the levee and the south bank of the canal, on the north bank of the canal, and at those locations in the marsh where ruts had' been caused by the passage of the marshbuggies. The earth thus deposited was then tamped with the crane bucket of the dragline to give compaction to the soil. In the course of time the vegetation of the marshland has grown again on this fresh soil on the banks of the canal and on the levee.

As a result of this restoration work, the slightly more than 100 feet of canal damaged in construction was repaired. The banks were re-established and the levee returned to its original height and width. The canal at the point of the intersection with the right of way is now somewhat wider than it was before construction of the transmission lines, but this widening has not in any way interfered with its use for drainage or by small boats. The only remaining damage to the properties of the plaintiffs resulting from construction of the transmission lines are several small holes in [186]*186the levee within the right of way area apparently caused by cattle sinking into the levee in places where the earth has not completely compacted. The cost of repairing this damage is estimated at $100.

Plaintiffs maintain that their land, including the canal and levee thereon, has been damaged in the area of the right of way in the construction of the transmission lines, and that the defendant has failed to repair that damage. They charge also that some of the marsh-buggies used by the independent contractor in his construction line were operated outside the right of way. To this extent plaintiffs charge the defendant with trespass and ask damages therefor. The defendant, on the other hand, contends that it has made a reasonable use of its 100' right of way over the plaintiffs’ property, that the damage caused thereto by the construction of the transmission line has been repaired, and that the plaintiffs are really trying to mulct the power company in damages. They cite, for example, the fact that although the entire canal extending over 4,000' cost only $550 to build, plaintiffs are asking $22,600 for damage to the slightly more than 100 feet of the canal crossing the defendant’s right of way. The defendant alleges that the plaintiffs made money demands on it before the independent contractor came through with its final clean-up, that these money demands have continued, culminating in the filing of this litigation.

It is settled in Louisiana, as elsewhere, that one having an easement or servitude on another’s land is bound to use that easement or servitude in such manner as not unreasonably to injure the right of the owner of the servient estate,2 and that if the owner of the easement or servitude uses it in a negligent, unauthorized or unreasonable manner, the owner of the servient estate may maintain an action for damages resulting from such use.3 It is recognized, of course, that even with maximum care, damage, and sometimes inconvenience, to the servient estate is inevitable in the exercise of rights under the servitude. The obligation of the owner of the servitude is not to cause no damage, but to cause “the least possible damage.” LSA-C.C. Art. 774.4 The obligation to cause the least possible damage involves the responsibility of returning the premises to its original condition so far as reasonably possible.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Petchak v. Bossier Parish Police Jury
55 So. 3d 840 (Louisiana Court of Appeal, 2010)
Stephens v. International Paper Co.
542 So. 2d 35 (Louisiana Court of Appeal, 1989)
Bd. of Com'rs of Port of NO v. ILL. CENT., ETC.
379 So. 2d 838 (Louisiana Court of Appeal, 1980)
McGuire v. Central Louisiana Elec. Co., Inc.
337 So. 2d 1070 (Supreme Court of Louisiana, 1976)

Cite This Page — Counsel Stack

Bluebook (online)
169 F. Supp. 184, 1958 U.S. Dist. LEXIS 3025, Counsel Stack Legal Research, https://law.counselstack.com/opinion/duet-v-louisiana-power-light-co-laed-1958.