Doug Crownover v. Mid-Continent Casualty Co

772 F.3d 197, 2014 U.S. App. LEXIS 20737, 2014 WL 5473084
Court of Appeals for the Fifth Circuit·Decided October 29, 2014·No. 11-10166·Published·Cited by 14 cases

Opinion

*199 ON PETITION FOR REHEARING

JAMES L. DENNIS, Circuit Judge:

The petition for panel rehearing is GRANTED. The prior opinion, Crownover v. Mid-Continent Casualty Co., 757 F.3d 200 (5th Cir.2014), is WITHDRAWN, and the following opinion is substituted:

Doug and Karen Crownover contracted with Arrow Development, Inc. (“Arrow”) to construct a house for them. Arrow performed defective work and then failed promptly to correct the work. The Crownovers spent a significant amount of money paying to correct the work themselves. An arbitrator found Arrow liable to the Crownovers for breaching its express warranty to repair non-conforming work and awarded them damages. Because Arrow filed for bankruptcy, however, the Crownovers were limited to recovering what they could from Arrow’s insurance policies. They therefore sued Mid-Continent Casualty Co. (“Mid-Continent”), Arrow’s insurer, in federal court for the damages owed to them by Arrow, and both sides moved for summary judgment. The principal question in this diversity case is whether a contractual provision in the construction contract between the Crownovers and Arrow, which obligated Arrow to repair its work where that work failed to conform to the requirements of the construction contract, was an “assumption of liability” that exceeded Arrow’s liability under general Texas law, thereby triggering a “contractual-liability exclusion” in Arrow’s insurance contract with Mid-Continent. If the contractual-liability exclusion does not apply, the question becomes whether any other exclusion from coverage applies.

The district court held that the contractual-liability exclusion in Arrow’s contract with Mid-Continent prevented indemnity and granted summary judgment for Mid-Continent'. We conclude that, consistent with Texas law and considering the Texas Supreme Court’s decisions in Gilbert Texas Construction, L.P. v. Underwriters at Lloyd’s London, 327 S.W.3d 118 (Tex. 2010), and Ewing Construction Co. v. Amerisure Insurance Co., 420 S.W.3d 30 (Tex. 2014), the contractual-liability exclusion from coverage does not apply and therefore Mid-Continent was not entitled to summary judgment on that ground. We further conclude that no other exclusion from coverage forecloses the Crownovers’ claim. Accordingly, we REVERSE summary judgment for Mid-Continent, RENDER summary judgment for the Crownovers, and REMAND for calculation of legal fees.

BACKGROUND

I.

In October 2001, the Crownovers entered into a construction contract with Arrow to construct a home on their land in Sunnyvale, Texas. The contract also contained a warranty-to-repair clause, which in paragraph 23.1 provided that Arrow would “promptly correct work ... failing to conform to the requirements of the Contract Documents.” The work was completed in November 2002, but by early 2003, cracks began to appear in the walls and foundation of the Crownovers’ home. Additional problems with the heating, ventilation, and air conditioning (“HVAC”) system caused leaking in exterior lines and air ducts inside the home. To compensate for defects in the HVAC system, the system’s mechanical units ran almost continuously in order to heat or cool the house. As a result of being overburdened, the mechanical units ultimately had to be replaced. In all, the Crownovers paid several hundred thousand dollars to fix the *200 problems with the foundation and HVAC system.

II.

The Crownovers attempted to have Arrow correct the problems and eventually sought legal relief. Their demand letters were forwarded to Mid-Continent, but to no avail. The Crownovers then initiated an arbitration proceeding against Arrow. The arbitrator found that the HVAC system “was not installed properly, did not perform as required, and exhibited numerous deficiencies as identified by the various consultants and contractors who evaluated the system,” and determined that “Arrow is responsible for the costs associated with replacement of the HVAC system, less betterment.” The arbitrator also found that the foundation failed and that Arrow was responsible for the costs of repairing the foundation. Accordingly, the arbitrator concluded that the Crownovers had a meritorious claim for breach of the express warranty to repair contained in paragraph 28.1 of their contract with Arrow, which was not barred by the statute of limitations. Because the arbitrator awarded damages to the Crownovers on that ground, she declined to decide whether the Crownovers’ other claims were barred by a statute of limitations.

Arrow later filed for bankruptcy. In June 2009, the bankruptcy court lifted the automatic stay but limited the Crownovers’ recovery to any amount they could recover from an applicable insurance policy. (To date, Arrow has not paid the Crownovers any money.) In July 2009, the Crown-overs sent a letter to Mid-Continent, demanding that the insurance company pay the arbitration award. Mid-Continent denied their demand in August 2009, citing several insurance policy defenses and exclusions.

The Crownovers then sued Mid-Continent for breach of contract. Both sides moved for summary judgment. Ultimately, the district court granted Mid-Continent’s motion and denied the Crownovers’ motion. In its opinion, the district court examined an “Insuring Agreement,” a provision that appeared (in exactly the same form) in a series of comprehensive general liability (“CGL”) policies, by which Mid-Continent insured Arrow, from August 2001 through 2008. The district court concluded that the Insuring Agreement covered Arrow while it constructed the Crownovers’ home. The Insuring Agreement states that Mid-Continent “will pay those sums that [Arrow] becomes legally obligated to pay as damages because of ... ‘property damage’ to which this insurance applies.”

Several exclusions apply to this general coverage provision. The district court concluded that one of them, the contractual-liability exclusion, applied in the instant case, such that Mid-Continent was not obligated to indemnify Arrow for the damages it owed the Crownovers. This exclusion states that “[t]his insurance does not apply to[] ‘property damage’ for which the insured is obligated to pay damages by reason of the assumption of liability in a contract or agreement.” There is, however, an exception to this exclusion for “liability ... [t]hat the insured would have in the absence of the contract or agreement.” The district court noted that the arbitration award to the Crownovers was based only on Arrow’s breach of the express warranty to repair contained in paragraph 23.1 (the arbitrator explicitly declined to decide whether Arrow was liable to the Crownovers on any other ground). Thus, the district court held that because Arrow “became legally obligated to pay the arbitration damages on the basis of [its] contractually assumed liability,” the contractual-liability exclusion *201 applied with no applicable exception to the exclusion.

Free access — add to your briefcase to read the full text and ask questions with AI

Doug Crownover v. Mid-Continent Casualty Co, 772 F.3d 197, 2014 U.S. App. LEXIS 20737, 2014 WL 5473084 (5th Cir. 2014).

772 F.3d 197 (Doug Crownover v. Mid-Continent Casualty Co) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related