Daza v. Pile Foundation Construction Co.

983 F. Supp. 2d 399, 2013 WL 6388439, 2013 U.S. Dist. LEXIS 172362
CourtDistrict Court, S.D. New York
DecidedDecember 6, 2013
DocketNo. 10 Civ. 4678(MGC)
StatusPublished

This text of 983 F. Supp. 2d 399 (Daza v. Pile Foundation Construction Co.) is published on Counsel Stack Legal Research, covering District Court, S.D. New York primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Daza v. Pile Foundation Construction Co., 983 F. Supp. 2d 399, 2013 WL 6388439, 2013 U.S. Dist. LEXIS 172362 (S.D.N.Y. 2013).

Opinion

OPINION

CEDARBAUM, District Judge.

Jon Daza brings this action to recover damages for injuries he sustained on May 20, 2010, when a crane block weighing at least a ton tipped over and crushed his left leg. The crane block was located on a barge, the “Uncle Leo,” one of three barges owned by Daza’s employer, Pile Foundation Construction Company, Inc. (“Pile”). The barge was moored in the East River to assist in an East River Park construction project that Pile had been awarded by the City of New York, its Parks Department, and the Department’s Capital Projects Division (collectively, with the City’s Economic Development Corporation, “the City”). The City had also hired the predecessor to URS Corporation and URS Corporation-New York (collectively, “URS”) as construction manager to oversee the project. URS in turn hired the predecessor to AECOM Services, Inc. and AECOM USA, Inc. (collectively, “AE-COM”) as subcontractor to oversee marine construction and demolition. Anthony Rivara Contracting, LLC, was also named in the complaint as a defendant but has since been dismissed from the action.

The seven counts in Daza’s second amended complaint contain two categories of claims against the defendants. First, he claims that the City, URS, and AECOM are liable to him for negligence under N.Y. Labor Law §§ 200, 240(1), and 246. Second, he claims that Pile is liable to him under either the Jones Act, 46 U.S.C. § 30104 et seq, or the Longshore and Harbor Workers’ Compensation Act (“LHWCA”), 33 U.S.C. § 901 et seq. The defendants have asserted numerous cross-claims against one another for contribution, indemnity, and breach of contract.

All parties now move for summary judgment. Daza moves for partial summary judgment on liability and his Labor Law § 240(1) claims. Pile moves for summary judgment dismissing Daza’s claims under the Jones Act and the LHWCA, dismissing its co-defendants’ cross-claims for indemnification, and dismissing the City’s claim for breach of contract. URS and AECOM move for summary judgment dismissing Daza’s Labor Law claims and all cross-claims against them. URS also moves for summary judgment granting its claim of contractual indemnification and contribution against AECOM. The City moves for summary .judgment dismissing Daza’s Labor Law claims and its co-defendants’ claims for contribution. The City also moves for summary judgment granting its claims against URS and AECOM for contractual indemnification, against Pile for common law and contractual indemnification, and against Pile for breach of contract.

For the reasons set forth below, Daza’s motion for partial summary judgment on his Labor Law § 240(1) claim against the City is granted. The City’s motion for summary judgment is granted dismissing Daza’s claims under §§ 200 and 241(6). The summary judgment motions of URS and AECOM are granted, dismissing all of Daza’s Labor Law claims against them. Pile’s motion for summary judgment is granted, dismissing Daza’s claims under the Jones Act and LHWCA. Pile’s motion [406]*406for summary judgment is also granted as to the City’s cross-claims for common law indemnity and breach of contract, but denied as to the City’s cross-claim for contractual indemnity. Finally, the summary judgment motions of URS and AECOM on the City’s claims for indemnity are granted.

FACTS

Except where otherwise noted, the following facts are undisputed.

I. The Circumstances of the Injury

Daza has worked in Manhattan as a member of Local 1456 of the Dockbuilders’ Union since 2008. On May 19, 2010, Daza was assigned to a project rebuilding the East River Promenade on the Lower East Side of Manhattan for which Pile was the general contractor. On that day, Daza rode the Uncle Leo barge from where it had been stationed in Flushing, Queens, to the East River construction site. That night, the workers, including Daza and his foreman, Brian Nee, disconnected the crane block from one of the cranes on board the Uncle Leo and laid it on its side on the deck of the barge.

A crane block is a large steel apparatus about six-and-one-half feet tall and two feet wide, weighing between one and two and-one-half tons. It is suspended from the cables that hang from the crane’s boom. The block consists of a set of “sheaves” — pulleys, essentially — in its upper portion and a “shackle” — a horseshoe-shaped hook — in its lower portion. The sheaves and shackle are connected by a swivel, which allows the shackle to rotate. Roughly three-quarters of the deck of the Uncle Leo was covered by timber “crane mats.” The mats are arranged side by side and end to end and are intended to protect the deck of the barge from damage by the cranes.

On the morning of May 20, 2010, the crew set out to replace one of the cables on the crane block. Under Nee’s direction, Daza and his fellow workers attached straps to the crane block and used the crane to hoist the block over to the crane mats. When the crane operator lowered the block, the shackle wedged itself into a three-inch gap between two crane mats. With the shackle wedged, the block stood vertically without any additional support or bracing. Nee then decided to change the cable while the block was in a standing position. The workers removed the straps that the crane had used to hoist the block.

Nee attached a “choker” chain to the top of the crane block that connected the shackle to the crane boom. He then directed Daza to walk to the opposite side of the crane block. As Daza began walking to the other side, the crane block toppled over and struck him on the lower part of his left leg. Daza sustained four major fractures of the bones in his leg. He has since undergone three surgeries. His doctor states that Daza will need anti-inflammatory and narcotic pain-killing medications for the rest of his life and will need ankle replacement or fusion in the future. Pile is currently paying Daza compensation under the LHWCA, although Daza contends that no final award has been made.

None of the witnesses at the scene who were deposed saw anything that might explain why the crane block toppled over. The block had been standing upright for between five and ten minutes before it collapsed. Both Nee and Daza testified that they saw no boats pass that could have created a wake that would have rocked the Uncle Leo, though the author of URS’s incident report testified that Nee had previously identified “wakes and/or waves” as the “contributing cause” of the accident. Both Nee and Daza testified [407]*407that they did not see anyone touch the crane block immediately before it fell. Although Nee admitted that he initially intended to change the crane block cables while the block was on its side, he also testified that he had previously changed a cable on a crane block in an upright position ten to twelve times.

Daza has submitted two expert reports in support of his claims. Both experts opine that the accident could have been avoided had the crane block been properly secured. One expert states that the wood composing the crane mats was in such shoddy condition that the crane mats should not have been used to support an upright crane block. The expert further states that, had undamaged crane mats been properly positioned without space between them, the crane block could not have been set in a vertical position.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cannon v. H&L Contr., LLC
2026 NY Slip Op 00233 (Appellate Division of the Supreme Court of New York, 2026)

Cite This Page — Counsel Stack

Bluebook (online)
983 F. Supp. 2d 399, 2013 WL 6388439, 2013 U.S. Dist. LEXIS 172362, Counsel Stack Legal Research, https://law.counselstack.com/opinion/daza-v-pile-foundation-construction-co-nysd-2013.