Columbia Basin Land Protection Ass'n v. Kleppe

417 F. Supp. 46, 6 Envtl. L. Rep. (Envtl. Law Inst.) 20, 1976 U.S. Dist. LEXIS 15887
CourtDistrict Court, E.D. Washington
DecidedMarch 29, 1976
DocketC-76-6
StatusPublished
Cited by8 cases

This text of 417 F. Supp. 46 (Columbia Basin Land Protection Ass'n v. Kleppe) is published on Counsel Stack Legal Research, covering District Court, E.D. Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Columbia Basin Land Protection Ass'n v. Kleppe, 417 F. Supp. 46, 6 Envtl. L. Rep. (Envtl. Law Inst.) 20, 1976 U.S. Dist. LEXIS 15887 (E.D. Wash. 1976).

Opinion

MEMORANDUM AND ORDER

NEILL, Chief Judge.

Bonneville Power Administration (BPA) has filed an environmental impact statement (EIS) covering a proposed program to construct a series of power transmission lines extending from Little Goose and Lower Granite dams on the Lower Snake River to the'Mid-Willamette Valley area of Oregon. As part of this energy redistribution program BPA has proposed a 500-kilowatt transmission line which will connect Lower Monumental Dam with a substation at Ashe, near Richland, Washington. BPA intends to construct this line along proposed route “D”, which traverses dry and irrigated farmland owned by members of the plaintiff Columbia Basin Land Protection Association, an organization formed for the purpose of seeking an alternate route for the power line.

Having failed to persuade BPA to utilize their proposed route “E”, which traverses a longer route across dry rangeland, plaintiffs seek injunctive and declaratory relief, based on the National Environmental Protection Act (NEPA), declaring BPA’s impact statement inadequate and its decision to utilize route “D” arbitrary and capricious and an abuse of discretion.

Presently before the Court is plaintiffs’ motion for a preliminary injunction.

The factors a Court must consider on a motion for preliminary injunction are:

(1) the significance of the threat of irreparable harm to plaintiff if the injunction is not granted;
(2) the state of the balance between this harm and the injury that granting the injunction could inflict on the defendant;
(3) the probability that plaintiff will succeed on the merits; and
(4) the public interest.

11 Wright and Miller, Federal Practice and Procedure, § 2948 at 430-431. In the case at bench, however, the decisive factor is plaintiffs’ likelihood of success on the merits. It is clear that plaintiffs will suffer irreparable harm if the project is permitted to proceed and later found to be in violation of NEPA, for testimony at the hearing established that construction is already behind schedule and will proceed swiftly unless enjoined. 1 Further, NEPA has effectively preempted this Court’s authority to balance the relative harm to the parties that would result from an injunction or to determine the public interest, for the act

sets forth a declaration of national environmental policy and requires the Federal Government to use “all practical means, consistent with other essential considerations of national policy, to improve and coordinate Federal plans, functions, programs, and resources” to achieve a wide range of environmental goals. Sec. 101, 42 U.S.C.A. § 4331.

Trout Unlimited v. Morton, 509 F.2d 1276, 1281 (9th Cir. 1974). See also, 42 U.S.C. § 4321, Daly v. Volpe, 376 F.Supp. 987, 992-993 (W.D.Wa.1974). Since NEPA mandates implementation of a congressionally defined policy “to the fullest extent possible”, 42 U.S.C. § 4332, the relative harm to the parties that results from an injunction in furtherance of the goals of NEPA is not controlling. Cf. United States v. San Francisco, 310 U.S. 16, 60 S.Ct. 749, 84 L.Ed. 1050 (1940), quoted in Lathan v. Volpe, 455 F.2d 1111, 1116 (9th Cir. 1971) and Northside Tenants’ Rights Coalition v. Volpe, 346 F.Supp. 244, 248-249 (E.D.Wis.1972). Accordingly, courts have not hesitated to en *49 join projects proceeding in violation of NEPA, irrespective of the damage caused by such injunctions. Calvert Cliffs’ Coordinating Committee, Inc. v. United States Atomic Energy Commission, 146 U.S.App.D.C. 33, 449 F.2d 1109, 1115 (1971); Lathan v. Volpe, supra; Greene County Planning Board v. Federal Power Commission, 455 F.2d 412, 422-423 (2d Cir.), cert. denied, 409 U.S. 849, 93 S.Ct. 56, 34 L.Ed.2d 90 (1972); Arlington Coalition v. Volpe, 458 F.2d 1323 (4th Cir.), cert. denied, 409 U.S. 1000, 93 S.Ct. 312, 34 L.Ed.2d 243 (1972); Lathan v. Volpe, 350 F.Supp. 262, 265 (W.D.Wash.1972). Therefore, the Court’s grant or denial of plaintiffs’ motion for a preliminary injunction depends on the probability that plaintiffs will succeed on the merits.

The Basis of Plaintiffs’ Attack

Plaintiffs assert that BPA’s choice of route “D” was arbitrary and capricious, constitutes an abuse of discretion, and was violative of procedure required by law. See 5 U.S.C. § 706(2)(A) and (D). Plaintiffs’ attack is founded on defendants’ alleged non-compliance with NEPA, 42 U.S.C. § 4321 et seq. Specifically, they assert that the EIS prepared for the project failed to comply with NEPA in thé following particulars:

(1) that the EIS failed to incorporate - a ' cost-benefit analysis comparing the alternatives to the route chosen, as required by 42 U.S.C. 4332(2)(B) and Guideline 1500.8(a)(4) of the Council on Environmental Quality (CEQ), Part 1500, Chapter 5, Title 40, “Protection of the Environment”;
(2) that defendants failed to review and revise their procedures for preparation of EISs in consultation with CEQ as required by CEQ Guideline 1500.3(a);
(3) that defendants failed to fulfill their statutory duties under the National Historic Preservation Act of 1966, 16 U.S.C. 470f et seq., and Executive Order 11593;
(4) that defendants failed to correlate the project and its alternatives to BPA’s larger projects as required by CEQ Guideline 1500.6(d)(1);
(5) that defendants failed to adequately consult with other federal agencies and give sufficient consideration to their comments as required by 42 U.S.C. 4332(2)(C) and CEQ Guideline 1500.8;

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
417 F. Supp. 46, 6 Envtl. L. Rep. (Envtl. Law Inst.) 20, 1976 U.S. Dist. LEXIS 15887, Counsel Stack Legal Research, https://law.counselstack.com/opinion/columbia-basin-land-protection-assn-v-kleppe-waed-1976.