City of Tacoma v. Federal Energy Regulatory Commission

460 F.3d 53, 373 U.S. App. D.C. 117, 36 Envtl. L. Rep. (Envtl. Law Inst.) 20173, 2006 U.S. App. LEXIS 21400, 2006 WL 2411362
CourtCourt of Appeals for the D.C. Circuit
DecidedAugust 22, 2006
Docket05-1054, 05-1093, 05-1180, 05-1181
StatusPublished
Cited by50 cases

This text of 460 F.3d 53 (City of Tacoma v. Federal Energy Regulatory Commission) is published on Counsel Stack Legal Research, covering Court of Appeals for the D.C. Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
City of Tacoma v. Federal Energy Regulatory Commission, 460 F.3d 53, 373 U.S. App. D.C. 117, 36 Envtl. L. Rep. (Envtl. Law Inst.) 20173, 2006 U.S. App. LEXIS 21400, 2006 WL 2411362 (D.C. Cir. 2006).

Opinion

Opinion for the Court filed by Circuit Judge BROWN.

BROWN, Circuit Judge.

These consolidated cases seek our review of a series of orders issued by the Federal Energy Regulatory Commission (“FERC” or “Commission”), granting a conditional license to the City of Tacoma (“Tacoma”) to operate a hydroelectric pro *59 ject on the Skokomish River in the State of Washington. We deny the petitions in part, grant the petitions in part, and remand for further proceedings, without vacating the license.

I

In 1924, Tacoma obtained a license from the Federal Power Commission to flood 8.8 acres of national forest land by damming the North Fork of the Skokomish River at Lake Cushman on the Olympic Peninsula. This license was designated a “minor part license” because it covered only a small part of Tacoma’s much larger hydroelectric project (the “Cushman Project”). At that time, the Federal Power Commission interpreted its licensing authority narrowly, and therefore, the 1924 minor part license gave Tacoma the authority it needed to proceed with the Cushman Project. In the ensuing years, Tacoma built two dams across the North Fork river. The first dam greatly increased the size of Lake Cushman, and the second dam created Lake Kokanee further downstream. Tacoma also constructed two hydroelectric plants, one at the upper dam and a second near Hood Canal, which adjoins Puget Sound. Between Lake Kokanee and Hood Canal, Tacoma diverted virtually all the water from the North Fork riverbed into a pipeline, thereby maximizing the generating power of the river. Nevertheless, some distance downhill from Lake Koka-nee, water continued to flow into the North Fork riverbed from McTaggert Creek, and recently Tacoma has released into the riverbed an additional flow of sixty cubic feet per second (“cfs”).

The five-thousand-acre' reservation of the Skokomish Indian Tribe (“Tribe”) is located near the mouth of the Skokomish River, with Hood Canal as its northeastern border and the Skokomish River as its eastern, southeastern, and southern borders. The reservation was established in 1855 by the Treaty of Point No Point, which guarantees certain rights to the Tribe, including the right to take fish from the Skokomish River. The Cushman Project’s second hydroelectric plant is situated within the boundary of the reservation, on property Tacoma owns in fee, and an access road and transmission line run across reservation property. The Cushman Project did not remove all water from the section of the Skokomish River that borders the Tribe’s reservation; the lower portion of the river continues to be fed by the South Fork and also the small flow that remains in the North Fork. Nevertheless, the Cushman Project sharply reduced water levels, thereby affecting fish populations and increasing silt deposits. The Tribe asserts that the historic mean annual water-flow in the North Fork was eight-hundred cfs. If this figure is accurate, then even accounting for the sixty cfs that Tacoma is now releasing into the North Fork riverbed, Tacoma is still diverting about 92.5 percent of the North Fork’s water.

In 1963, the Federal Power Commission determined that its hydroelectric licensing jurisdiction extends to whole projects, not just to the parts of those projects that occupy or use federal land. See Pac. Gas & Elec. Co., 29 FPC 1265, 1266, 1963 WL 4558 (1963) (PG & E I). On that basis, the Commission concluded certain minor part licenses under consideration in that proceeding had been “improperly issued” based on an “erroneous conclusion of law.” Id. This holding cast a shadow of doubt over all projects that were then operating under minor part licenses, including the Cushman Project, but Tacoma nevertheless continued to operate the project under the terms of its 1924 mhjor part license.

In 1974, Tacoma’s minor part license expired, and Tacoma applied for a new *60 license, expressly seeking a “major project license” that would cover all its project-related facilities. Pursuant to section 15 of the Federal Power Act (“FPA” or the “Act”), 16 U.S.C. § 808(a)(1), which is the section governing relicensing, the Commission is required to issue annual renewals of the existing license during the application review period that precedes issuance of a new long-term license. The Commission therefore issued Tacoma an annual license, and as a consequence of repeated delays, Tacoma operated the project for the next twenty-four years under these annual renewals.

The array of matters addressed during this lengthy review period included: (1) the state certification required under section 401(a) of the Clean Water Act, 33 U.S.C. § 1341(a); (2) the state “concurrence” required under section 307(c)(3)(A) of the Coastal Zone Management Act, 16 U.S.C. § 1456(c)(3)(A); (3) the consultations with state and federal wildlife agencies required under section 10(j) of the FPA, id. § 803(j); and (4) the consultations with the Advisory Council on Historic Preservation required under section 106 of the National Historic Preservation Act, id. § 470f. In addition, FERC (the successor agency to the Federal Power Commission) prepared an environmental impact statement as required by the National Environmental Policy Act, 42 U.S.C. § 4332(2)(C), and the Department of the Interior (“Interior”), as the agency supervising the Tribe’s reservation, prepared a list of “conditions” to be included. in Tacoma’s new license pursuant to section 4(e) of the FPA. See 16 U.S.C. § 797(e).

The Tribe also petitioned FERC in 1992 for an order declaring the proceeding to be an original license proceeding, not a reli-censing. Among other things, the Tribe was seeking to establish pre-1924 environmental conditions as the baseline for FERC’s analysis of environmental impact, arguing that most, of the project had never been the subject of any license proceeding. FERC rejected the Tribe’s argument, stating, “We ... conclude that the subsequent licensing of a major project with an expiring minor part license is not an original licensing proceeding, but is a relicensing proceeding which is governed by the reli-censing provisions of section 15 of the FPA.” City of Tacoma, 67 FERC ¶ 61,152, at 61,443, 1994 WL 170164 (1994). FERC also specifically rejected the use of pre-1924 environmental conditions as the baseline for measuring environmental impact. See id. at 61,443-44.

FERC finally completed the application review process in 1998, and on July 30th of that year, FERC issued a forty-year major license for the Cushman Project, imposing a number of conditions designed, among other things, to protect the environment, to remedy past environmental impacts, to restore fish populations, and otherwise to mitigate the effect of the project on the Tribe’s reservation. See City of Tacoma, 84 FERC ¶ 61,107, at 61,578-99, 1998 WL 608611 (1998).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Eagle County, Colorado v. STB
82 F.4th 1152 (D.C. Circuit, 2023)
United Refining Co v. EPA
64 F.4th 448 (Third Circuit, 2023)
Save The Colorado v. Spellmon
50 F.4th 954 (Tenth Circuit, 2022)
Environmental Health Trust v. FCC
9 F.4th 893 (D.C. Circuit, 2021)
NC Department of Environmental v. FERC
3 F.4th 655 (Fourth Circuit, 2021)
Ergon-West Virginia, Inc. v. EPA
980 F.3d 403 (Fourth Circuit, 2020)

Cite This Page — Counsel Stack

Bluebook (online)
460 F.3d 53, 373 U.S. App. D.C. 117, 36 Envtl. L. Rep. (Envtl. Law Inst.) 20173, 2006 U.S. App. LEXIS 21400, 2006 WL 2411362, Counsel Stack Legal Research, https://law.counselstack.com/opinion/city-of-tacoma-v-federal-energy-regulatory-commission-cadc-2006.