City of Austin, Texas and Lower Colorado River Authority v. Decker Coal Company, a Joint Venture, Wytana, Inc. And Western Minerals, Inc.

701 F.2d 420, 1983 U.S. App. LEXIS 29319
CourtCourt of Appeals for the Fifth Circuit
DecidedMarch 28, 1983
Docket81-1618
StatusPublished
Cited by41 cases

This text of 701 F.2d 420 (City of Austin, Texas and Lower Colorado River Authority v. Decker Coal Company, a Joint Venture, Wytana, Inc. And Western Minerals, Inc.) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fifth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
City of Austin, Texas and Lower Colorado River Authority v. Decker Coal Company, a Joint Venture, Wytana, Inc. And Western Minerals, Inc., 701 F.2d 420, 1983 U.S. App. LEXIS 29319 (5th Cir. 1983).

Opinions

E. GRADY JOLLY, Circuit Judge:

I. INTRODUCTION

This case comes before this court from a decision by the district court for the Western District of Texas, Bunton, J., in favor of the plaintiffs — the City of Austin, Texas, and the Lower Colorado River Authority.1

We are presented with a question of allocation of costs under a coal procurement contract entered into between the plaintiffs and Decker Coal Company.2 Specifically, the issue involved is whether, pursuant to the contractual provision allowing Decker to pass costs on to the plaintiffs for “any new legislation, regulation, judicial action ... or labor agreement ... enacted, promulgated, or taken or made effective after March 31,1974,” Decker could pass through cost increases resulting from a 1976 determination by the Montana Department of State Lands [hereinafter, “MDSL”], pursuant to a pre-1974 Montana statute, which precluded “disturbance” of a certain portion of land within the proposed mine area.3

Because we find, based on an interpretation of the entire contract as required by Montana law,4 that the parties intended to allow pass-through of costs resulting from governmental action such as was involved here, we reverse the decision of the court below and remand for a determination of increased mining costs chargeable to the plaintiffs.

II. MOTION FOR CERTIFICATION

We note at the outset that Decker has filed a Motion for Certification to the Montana Supreme Court of the single issue involved herein. We hereby deny that motion.

Our decision not to certify the issue is based on the logic set forth in Florida ex rel. Shevin v. Exxon Corp., 526 F.2d 266, 274-76 (5th Cir.1976), and on the traditional use of certification. If this case turned on Montana’s definition of “regulation” or other terms about which the Montana court possessed expertise, this would be a different case. As -we discuss below, however, we base this decision on a determination of intent as manifested by the contract. Because we are as capable of making that determination on the basis of the record as is Montana, we will do so.5

[423]*423III. FACTS

A. The Contract

In an effort to meet growing energy demands, the plaintiffs, City of Austin and Lower Colorado River Authority, formed jointly the Fayette Power Project. Included in the project’s plans were an electric generation station with one 600-megawatt unit and other units with a variety of coal-burning capabilities.

On October 24, 1974, the plaintiffs entered into the Coal Purchase Contract with Decker. Under the contract, coal deliveries were scheduled to begin in 1978 and to continue for approximately 26 years, until 2003. Over the course of the contract over 50 million tons of coal are to be delivered.6

The contract established a “base price” of $7.00 per ton as of March 31,1974. Numerous price adjustment mechanisms were built into the contract, primarily in article IX, which is a detailed enumeration of adjustment factors, covering 11 pages. The pertinent clause within article IX of the contract is paragraph 9.06:

ADDITIONAL COSTS IMPOSED BY LEGISLATION, REGULATION, JUDICIAL ACTION, LABOR AGREEMENT, OR CHANGES IN THE METHOD OF OPERATION DUE TO MATERIAL SHORTAGES
The price of coal shall be increased from the base price in the same amount that the cost per ton of mining coal at the Mine is increased by any direct cost or required investment in order to comply with any new legislation, regulation, judicial action (other than the codification of the common law), or labor agreement which provides for new “add-ons” or additional personnel .... enacted, promulgated, or taken or made effective after March 31, 1974.
B. The Mine

In July 1973 Decker filed an Application for Prospecting Permit with MDSL for exploration by rotary drill holes in Big Horn County, Montana. The site, known as “East Decker,” is east of the Tongue River Reservoir directly across from another Decker mining area, dubbed “West Decker.” Decker had acquired a perpetual coal lease for this area in September 1971.

The East Decker site lies, in part, within the Deer Creek floodplain, through which Deer Creek flows on its way to Tongue River Reservoir. Deer Creek has a drainage area of approximately 50 square miles and its floodplain contains riparian timber, shrub habitat and significant wildlife.

Decker’s permit application specified the acreage to be disturbed, the method of prospecting, the mineral sought, and included a Detailed Prospecting Reclamation Plan with maps. In its reclamation plan, Decker stated: “2. The Company assures the Department of State Lands that the area covered by the application for prospecting permit includes no land having special, exceptional, critical, or unique characteristics as defined in Section 9(2) (a, b, c, d) Chapter 325, Laws of Montana 1973.”7

Decker went on to say that based on interviews with local residents of the community, no “archaeological, historical, ethnological and cultural values” would, to Decker’s knowledge, be affected. Nor would the “use, enjoyment, or fundamental character” of neighboring lands with such characteristics be adversely affected. Decker promised MDSL that should any characteristics of “Section 9” lands be encountered it would cease prospecting, notify MDSL immediately, and reclaim all disturbances within the area having those characteristics.8 The Application for Prospecting [424]*424Permit and appended Detailed Prospecting Reclamation Plan were filed as required by the Montana Strip and Underground Mine Reclamation Act, 1975 Mont.Laws ch. 441, sec. 14, and by the regulations adopted by MDSL pursuant thereto, Mont.Admin.Code §§ 26-2.10(10)-S10270 to -350 (1973).9

On July 23, 1973, MDSL issued Decker a permit allowing Decker to prospect on the lands in question, according to the procedures and assurances which it had set forth in its permit application. This permit was reissued on September 21, 1973, and renewed on September 20, 1974. In the 1974 renewal MDSL stated that the permit “in no way implies future Department approval of any area for mining,” and attached a MDSL letter spelling out the requirements vis-a-vis the nearby Tongue River Reservoir so that no water pollution should occur.10

Finally, on April 9,' 1975, Decker submitted an application for a strip mining permit to MDSL. Included in the application was a proposal to place “overburden” and spoil materials into the Deer Creek floodplain, to divert Deer Creek from its original channel, and to affect Deer Creek drainage in other ways. Decker submitted archaeological, ecological and topographic data with the application and stated that the area did not encompass any “Section 9” lands. Appended to the application was a 1973 “Historic and Archaeologic Resources Impact Appraisal” which included an evaluation of the proposed mining area.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Michael Channette v. Evans Operating Compan
440 F. App'x 258 (Fifth Circuit, 2011)
Stine v. Marathon Oil Co.
Fifth Circuit, 1992
Parich v. State Farm Mutual Automobile Insurance
919 F.2d 906 (Fifth Circuit, 1990)