Celender v. Allegheny County Sanitary Authority

222 A.2d 461, 208 Pa. Super. 390, 1966 Pa. Super. LEXIS 856
CourtSuperior Court of Pennsylvania
DecidedSeptember 15, 1966
DocketAppeals, 135 and 136
StatusPublished
Cited by40 cases

This text of 222 A.2d 461 (Celender v. Allegheny County Sanitary Authority) is published on Counsel Stack Legal Research, covering Superior Court of Pennsylvania primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Celender v. Allegheny County Sanitary Authority, 222 A.2d 461, 208 Pa. Super. 390, 1966 Pa. Super. LEXIS 856 (Pa. Ct. App. 1966).

Opinion

Opinion by

Montgomery, J.,

Appellants-plaintiffs, employes of Mole Construction Company, were severely burned as the result of an ex *392 plosion in a sewage disposal tunnel being constructed by Mole under a contract with the Allegheny County Sanitary Authority. This tunnel construction included a large underground vault known as TT-1, located adjacent to the Ohio River in McKees Rocks, Allegheny County. Plaintiffs sued the Authority alleging negligence in permitting explosive gas to accumulate in the vault and in failing to notify them of its presence. The Authority joined Mole as an additional defendant. In a jury trial the court below granted a nonsuit as to both original and additional defendants and later refused to remove it. Plaintiffs appealed.

Plaintiff Michael Celender, employed as a cement mason by Mole, and plaintiff John Diulus, employed as a laborer, reported for work on July 25, 1958, and were sent to a job location several miles away, on the other side of the river from the underground vault TT-1. They were unable to work at the site to which they had been assigned this day because of a misunderstanding. They then proceeded in an automobile owned by Celender from that site to consult with their foreman concerning another job assignment, which foreman they expected to find near McKees Rocks. As they passed vault TT-1, Celender recalled that he had left a rubbing stone inside that vault a few days before while he was working there. Celender, who was driving, stopped the car and sent Diulus down to look for the stone. Because the vault was dark Diulus could not readily find the stone. Celender then entered the vault and at his request Diulus struck a match. Immediately there was an explosion and flames raced around the chamber. Before they could escape both men were severely burned.

Plaintiffs admitted that on the day of the accident no one knew that they were going to enter this vault, but they and their witnesses stated that a warning was never given them concerning the possibility of ignit *393 ing underground gas by smoking or by tbe use of open lights and that they had smoked while working therein. They testified, however, that they knew that there was likely to be gas in the tunnels and that they also knew that there were large gasoline and oil tanks located nearby.

The Authority was created to provide for the construction of a sewage system in Allegheny County which would treat and dispose of sewage rather than permit its drainage into the rivers in the area. The treatment plant was constructed on the north bank of the Ohio River near the McKees Rocks Bridge across from vault U-l. Various pipe lines conducted the flow of sewage to the plant after intercepting it at the river outlets of various existing sewers. At these interception points underground vaults including U-l were constructed to provide access by workmen to the junctions. Numerous contractors participated in the project but U-l vault was part of the contract (No. 28) awarded to Mole. At the time of the explosion this vault was 80 per cent complete but no work was being done on it at the time of the explosion. Vault U-l was constructed on property owned by the Socony Mobil Oil Company under which the Authority had a perpetual easement. There was a fence around the area where this vault was located and there was a cap over the top of the opening leading underground.

A nonsuit should be entered only in a clear case. Hader v. Coplay Cement Mfg. Co., 410 Pa. 139, 189 A. 2d 271 (1963); DiGiannantonio v. Pittsburgh Railways Company, 402 Pa. 27, 166 A. 2d 28 (1960), and on appeal from a compulsory nonsuit the plaintiff must be given the benefit of all favorable testimony and every reasonable inference of fact arising therefrom, and all conflicts therein must be resolved in favor of the plaintiff. Davies v. McDowell National Bank, 407 Pa. 209, 180 A. 2d 21 (1962); Idlette v. Tracey, 407 Pa. 278, 180 A. 2d 37 (1962).

*394 It is clear and undisputed that Mole was an independent contractor to whom and to his servants, a property owner, which the Authority was, owes only the duty of reasonable care to have the premises in a safe condition for work, unless the defects responsible for the injury were known to the contractor. Engle v. Reider, 366 Pa. 411, 77 A. 2d 621 (1951). Furthermore, the owner of the property is under no duty to protect the employes of an independent contractor from risks arising from or intimately connected with defects or hazards which the contractor has undertaken to repair or which are created by the job contracted. Hader v. Coplay Cement Mfg. Co., supra; Wetherill v. Showell, Fryer & Co., Inc., 264 Pa. 449, 107 A. 808 (1919).

Appellants’ position is that the Authority was a participant in the work, having reserved control over part of it, and in support of their position they cite various provisions of the contract, i.e.: (1) B-35, which gave to the Authority engineer the right to order the contractor to erect safeguards and to take precautions deemed advisable by the engineer, “If, at any time, in the opinion of the engineer, the work is not ... in all respects safe in respect to . . . persons on or about the work . . .” Also this section gives the Authority engineer the privilege of putting the work in such safe condition at the cost of the contractor, if it fails to do so promptly after being directed to do so; (2) B-ll, which gives the Authority engineer the right to decide whether the contract is being properly fulfilled; (3) B-12, which gives to said engineer the right to approve the sequence of execution of the contract and the general conduct of the work or to direct the order or sequence where public necessity or welfare shall require; (4) B-13, which gives the Authority engineer the right to give orders and directions to the contractor’s superintendent in the absence of the contractor; (5) B-20, *395 gives the Authority engineer the right to require the dismissal of any workman who, in the opinion of the Authority engineer, is incompetent or whose work is unsatisfactory; (6) 0-33, provides for the type of lighting to he used in the shafts or tunnels and forbidding the use of open-flame lights unless expressly permitted. It is stated in appellants’ brief that, “The most pertinent reservation of control is found in the area of safety. . . .”

Appellants argue that this question of reservation of control should have been left to the jury but we cannot accept this argument since this was a written contract free from ambiguity, the interpretation of which was for the court. United Refining Company v. Jenkins, 410 Pa. 126, 189 A. 2d 574 (1963); 8 P.L.E., Contracts, §148. Therefore the issue resolves itself into the question of whether such provision giving the Authority the right to observe the fulfillment of safety requirements with the right to order them fulfilled if the contractor did not do so, is such control of part of the work as intended by §414 of the Restatement 2d, Torts so as to impose liability on the Authority. We are of the opinion that they are not sufficient for that purpose. Throughout the provisions in the contract the obligation to secure safety is imposed on the contractor.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

SHIPMAN v. AQUATHERM L.P.
E.D. Pennsylvania, 2020
Nertavich v. PPL Electric Utilities
31 Pa. D. & C.5th 353 (Philadelphia County Court of Common Pleas, 2013)
Zangrandi v. Kay Builders
26 Pa. D. & C.5th 501 (Lehigh County Court of Common Pleas, 2012)
Wombacher v. Greater Johnstown School District
20 A.3d 1240 (Commonwealth Court of Pennsylvania, 2011)
Beil v. Telesis Construction, Inc.
11 A.3d 456 (Supreme Court of Pennsylvania, 2011)
San Juan v. PSC Industrial Outsourcing, Inc.
240 P.3d 1026 (Nevada Supreme Court, 2010)
Warnick v. Home Depot U.S.A., Inc.
516 F. Supp. 2d 459 (E.D. Pennsylvania, 2007)
Farabaugh v. Pennsylvania Turnpike Commission
911 A.2d 1264 (Supreme Court of Pennsylvania, 2006)
Bonsall v. Kutztown Fire Co.
80 Pa. D. & C.4th 380 (Berks County Court of Common Pleas, 2006)
LaChance v. Michael Baker Corp.
869 A.2d 1054 (Commonwealth Court of Pennsylvania, 2005)
Marcano v. Hess Oil Virgin Islands Corp.
237 F. Supp. 2d 592 (Virgin Islands, 2003)
Pawlowski v. Conrail Inc.
42 Pa. D. & C.4th 517 (Alleghany County Court of Common Pleas, 1999)
Emery v. Leavesly McCollum
725 A.2d 807 (Superior Court of Pennsylvania, 1999)
Cary v. Gooding
34 Pa. D. & C.4th 417 (Chester County Court of Common Pleas, 1996)
Kozinevich v. Great Atlantic & Pacific Tea Co.
201 A.D.2d 462 (Appellate Division of the Supreme Court of New York, 1994)
Tarantino v. P.H. Glatfelter Co.
2 Pa. D. & C.4th 198 (York County Court of Common Pleas, 1989)
Bucha v. E.J.J. Mickley Roofing Inc.
50 Pa. D. & C.3d 191 (Northampton County Court of Common Pleas, 1988)
Colloi v. Philadelphia Electric Co.
481 A.2d 616 (Supreme Court of Pennsylvania, 1984)
Sierra Pacific Power Co. v. Rinehart
665 P.2d 270 (Nevada Supreme Court, 1983)
Sharkey v. Airco, Inc.
522 F. Supp. 646 (E.D. Pennsylvania, 1981)

Cite This Page — Counsel Stack

Bluebook (online)
222 A.2d 461, 208 Pa. Super. 390, 1966 Pa. Super. LEXIS 856, Counsel Stack Legal Research, https://law.counselstack.com/opinion/celender-v-allegheny-county-sanitary-authority-pasuperct-1966.