Opinion

*493 Justice O’Connor

delivered the opinion of the Court.

This case concerns overlapping federal and state regulation of a hydroelectric project located near a California stream. California seeks to ensure that the project’s operators maintain water flowing in the stream sufficient, in the State’s judgment, to protect the stream’s fish. The Federal Government claims the exclusive authority to set the minimum stream flows that the federally licensed powerplant must maintain. Each side argues that its position is consistent with the Federal Power Act, ch. 285, 41 Stat. 1063, as *494 amended, 16 U. S. C. §791a et seq. (1982 ed.), and, in particular, with §27 of that Act. We granted certiorari to resolve these competing claims.

I

The Rock Creek hydroelectric project lies near the confluence of the South Fork American River and one of the river’s tributaries, Rock Creek. Rock Creek runs through federally managed land located within California. The project draws water from Rock Creek to drive its generators and then releases the water near the confluence of the stream and river, slightly less than one mile from where it is drawn. The state and federal requirements at issue govern the “minimum flow rate” of water that must remain in the bypassed section of the stream and that thus remains unavailable to drive the generators.

In 1983, pursuant to the Federal Power Act (FPA or Act), the Federal Energy Regulatory Commission (FERC) issued a license authorizing the operation of the Rock Creek project. Keating, 23 FERC ¶ 62,137. Section 4(e) of the FPA empowers FERC to issue licenses for projects “necessary or convenient... for the development, transmission, and utilization of power across, along, from, or in any of the streams . . . over which Congress has jurisdiction.” 16 U. S. C. § 797(e) (1982 ed.). Section 10(a) of the Act also authorizes FERC to issue licenses subject to the conditions that FERC deems best suited for power development and other public uses of the waters. 16 U. S. C. §803(a) (1982 ed.). Congress’ subsequent amendments to those provisions expressly direct that FERC consider a project’s effect on fish and wildlife as well as “power and development purposes.” Electric Consumers Protection Act of 1986, Pub. L. 99-495, 100 Stat. 1243, 16 U. S. C. §§ 797(e), 803(a)(1). FERC issued the 1983 license and set minimum flow rates after considering the project’s economic feasibility and environmental consequences. In part to protect trout in the stream, the license *495 required that the project maintain interim minimum flow rates of 11 cubic feet per second (cfs) during May through September and 15 cfs during the remainder of the year. 23 FERC ¶ 62,137, at 63,204. The license also required the licensee to submit studies recommending a permanent minimum flow rate, after consulting with federal and state fish and wildlife protection agencies. Ibid. In 1985, the licensee submitted a report recommending that FERC adopt the interim flow rates as permanent rates. The California Department of Fish and Game (CDFG) recommended that FERC require significantly higher minimum flow rates.

The licensee had also applied for state water permits, and in 1984 the State Water Resources Control Board (WRCB) issued a permit that conformed to FERC’s interim minimum flow requirements but reserved the right to set different permanent minimum flow rates. App. 65-67. When the WRCB in 1987 considered a draft order requiring permanent minimum flow rates of 60 cfs from March through June and 30 cfs during the remainder of the year, the licensee petitioned FERC for a declaration that FERC possessed exclusive jurisdiction to determine the project’s minimum flow requirements. Rock Creek Limited Partnership, 38 FERC ¶ 61,240, p. 61,772 (1987). The licensee, by then respondent Rock Creek Limited Partnership, also claimed that the higher minimum flow rates sought by the WRCB would render the project economically infeasible. Ibid.

In March 1987, FERC issued an order directing the licensee to comply with the minimum flow requirements of the federal permit. In that order, FERC concluded that the task of setting minimum flows rested within its exclusive jurisdiction. Id., at 61,774. The Commission reasoned that setting minimum flow requirements was integral to its planning and licensing process under FPA § 10(a); giving effect to competing state requirements “would interfere with the Commission’s balancing of competing considerations in licensing” and would vest in States a veto power over federal *496 projects inconsistent with the FPA, as interpreted in First Iowa Hydro-Electric Cooperative v. FPC, 328 U. S. 152 (1946). 38 FERC, at 61,773. FERC also directed an Administrative Law Judge to hold a hearing to determine the appropriate permanent minimum flow rates for the project. Id., at 61,774. After considering proposals and arguments of the licensee, the CDFG, and FERC staff, the Administrative Law Judge set the minimum flow rate for the project at 20 cfs during the entire year. Rock Creek Limited Partnership, 41 FERC ¶ 63,019 (1987). Four days after FERC’s declaratory order, the WRCB issued an order directing the licensee to comply with the higher minimum flow requirements contained in its draft order. App. 73. The WRCB also intervened to seek a rehearing of FERC’s order. FERC denied the rehearing request, concluded that the State sought to impose conflicting license requirements, and reaffirmed its conclusion that the FPA, as interpreted in First Iowa, provided FERC with exclusive jurisdiction to determine minimum flow rates. Rock Creek Limited Partnership, 41 FERC ¶ 61,198 (1987).

The Court of Appeals for the Ninth Circuit affirmed FERC’s order denying rehearing. California ex rel. State Water Resources Board v. FERC, 877 F. 2d 743 (1989). That court, too, concluded that First Iowa governed the case; that FPA §27 as construed in First Iowa did not preserve California’s right to regulate minimum flow rates; and that the FPA pre-empted WRCB’s minimum flow rate requirements. Ibid. We granted certiorari, 493 U. S. 991 (1989), and we now affirm.

II

In the Federal Power Act of 1935, 49 Stat. 863, Congress clearly intended a broad federal role in the development and licensing of hydroelectric power. That broad delegation of power to the predecessor of FERC, however, hardly determines the extent to which Congress intended to have the Federal Government exercise exclusive powers, or intended *497

Free access — add to your briefcase to read the full text and ask questions with AI

California v. Federal Energy Regulatory Commission, 495 U.S. 490, 110 S. Ct. 2024, 109 L. Ed. 2d 474, 1990 U.S. LEXIS 2614 (1990).

495 U.S. 490 (California v. Federal Energy Regulatory Commission) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Texas v. New Mexico
602 U.S. 943 (Supreme Court, 2024)
Daniel Allen v. United States
83 F.4th 564 (Sixth Circuit, 2023)
County of Butte v. Dept. of Water Resources
California Supreme Court, 2022
Sanders v. Duke Energy Carolinas, LLC
W.D. North Carolina, 2022
Utah Native Plant Society v. U.S. Forest Service
923 F.3d 860 (Tenth Circuit, 2019)
County of Butte v. Dept. of Water Resources
California Court of Appeal, 2018
Jim Waller v. Sabine River Authority of Texas
Court of Appeals of Texas, 2018
John Templemire v. W&M Welding, Inc.
Supreme Court of Missouri, 2014
Charles R. Otwell, Sr. v. Alabama Power Company
747 F.3d 1275 (Eleventh Circuit, 2014)
John R. Sand & Gravel Co. v. United States
552 U.S. 130 (Supreme Court, 2008)
Verizon New England, Inc. v. Public Utilities Commission
2005 ME 64 (Supreme Judicial Court of Maine, 2005)
Ridenour v. Kaiser-Hill Co.
397 F.3d 925 (Tenth Circuit, 2005)
Friends of Eel River v. Sonoma County Water Agency
134 Cal. Rptr. 2d 322 (California Court of Appeal, 2003)