Bursey v. South Carolina Department of Health & Environmental Control

600 S.E.2d 80, 360 S.C. 135, 2004 S.C. App. LEXIS 175
Court of Appeals of South Carolina·Decided June 1, 2004·No. No. 3813·Published·Cited by 11 cases

Opinion

ANDERSON, J.:

The South Carolina Department of Health and Environmental Control (“DHEC”) and the South Carolina Electric and Gas Company (“SCE & G”) appeal a Circuit Court order affirming the decision of the South Carolina Mining Council. The Mining Council, deciding an appeal of a DHEC determination that SCE & G would not be required to obtain a mining permit in connection with its Lake Murray Dam remediation project (also referred to in various documents and briefs as the Saluda River Dam remediation project), ruled that SCE & G was required to obtain a mining permit. We affirm.1

FACTUAL/PROCEDURAL BACKGROUND

SCE & G is currently engaged in a dam remediation project, which includes construction of a back-up dam for the existing Saluda Dam at Lake Murray in Lexington County, South Carolina. The erection of this back-up dam is to be accomplished by mining materials from the construction site for use in the dam’s construction. The quarry mined for this construction will cover from ten to sixty acres and possibly constitute the largest quarry in South Carolina upon completion. Activities in connection with this project will include exploration of the land for suitable materials, blasting, dewatering, crushing raw materials, and the production of concrete. All activities associated with this mining and construction will be conducted at the SCE & G site. None of the mined material will be used for off-site purposes or sold to third parties.

[138] By letter dated May 15, 2001, SCE & G requested from DHEC a “letter of verification” stating that SCE & G was not required to obtain a mine operating permit for this project. Craig Kennedy, Assistant Division Director for the Division of Mining and Solid Waste Management, responded in a June 5, 2001, letter that, because the mining proposed by SCE & G fell within an exception to the South Carolina Mining Act (“the Act”),2 SCE & G was not required to obtain a mine operating permit for the project. Kennedy based his finding on the following language of the Act:

(1) “Mining” means:
(a) the breaking of the surface soil to facilitate or accomplish the extraction or removal of ores or mineral solids for sale or processing or consumption in the regular operation of a business;
(b) removal of overburden lying above natural deposits of ore or mineral solids and removal of the mineral deposits exposed....
... Mining does not include excavation or grading when conducted solely in aid of on-site farming or of on-site construction.

S.C.Code Ann. § 48-20-40(1) (Supp.2003). Kennedy concluded: “[A] mine operating permit is not required for landowners excavating on their own property [when] all the excavated material is used on that same tract of land or contiguous tracts of land by the same land owner.” Because Kennedy determined the proposed project constituted “on-site construction” as contemplated by the Act, DHEC did not require SCE & G to acquire a mine operating permit.

The Mining Association of South Carolina (“MASC”) and Brett Bursey (collectively, “Respondents”) appealed the DHEC decision to the Mining Council, a quasi-judicial body established by statute for the purpose of, among other things, hearing appeals of agency decisions related to mine operating permits. See S.C.Code Ann. §§ 48-2(M0(2), 48-20-190, 48-21-10, 48-21-20 (1987 & Supp.2003). Bursey’s appeal, dated October 17, 2001, was received on October 22. MASC’s appeal, dated October 19, 2001, was received on October 26.

[139] SCE & G and DHEC filed motions with the Mining Council to dismiss the appeals on the ground that they were filed more than thirty days after Respondents had notice of the decision not to require a permit. See S.C.Code Ann. § 48-20-190 (Supp.2003) (“The person taking the appeal within thirty days after the department’s decision shall give written notice to the council through its secretary that he desires to appeal and filing a copy of the notice with the department at the same time.”); 26 S.C.Code Ann. Regs. 89-290(B) (Supp.2003) (“The person taking the appeal shall within thirty days after notification of the Department’s decision, give written notice to the Mining Council through its secretary that he desires to take an appeal, at the same time filing a copy of the notice with the Department.”). The Mining Council denied the motions to dismiss and reversed DHEC’s decision, ruling that the SCE & G project required a mining permit under the Act.

SCE & G and DHEC (collectively, “Appellants”) appealed the Mining Council’s ruling to the Circuit Court. The court, applying the Administrative Procedures Act’s (the “APA”) “substantial evidence” standard of review, affirmed the Council’s rulings on both the timeliness of the appeals and the interpretation of the Act requiring SCE & G to obtain a mine operating permit.

ISSUES

I. Did the Circuit Court err in applying the APA’s “substantial evidence” standard of review?

II. Did the Circuit Court err in affirming the Mining Council’s findings that Respondents’ appeals were timely?

III. Did the Circuit Court err in affirming the Mining Council’s conclusion that SCE & G’s proposed activities require a mine operating permit?

LAW/ANALYSIS

I. Standard of Review

Appellants argue the Circuit Court erred in applying the “substantial evidence” standard of review enunciated in the APA. See S.C.Code Ann. § l-23-380(A)(6) (Supp.2003). Appellants contend the Mining Act, via the Act’s reference to [140] “Chapter 7 of Title 18,” mandates a broader standard. See S.C.Code Ann. § 48-20-200 (Supp.2003). We disagree.

A directly affected party, aggrieved by a DHEC determination to grant a mine operating permit, may appeal the decision to grant said permit to the Mining Council.3 S.C.Code Ann. § 48-20-190 (Supp.2003). A party is then granted the right to appeal the ruling of the Mining Council to the Circuit Court. S.C.Code Ann. § 48-20-200 (Supp.2003). Section 48-20-200 requires that this appeal be taken “in the manner provided by Chapter 7 of Title 18.” Id.

Free access — add to your briefcase to read the full text and ask questions with AI

Bursey v. South Carolina Department of Health & Environmental Control, 600 S.E.2d 80, 360 S.C. 135, 2004 S.C. App. LEXIS 175 (S.C. Ct. App. 2004).

600 S.E.2d 80 (Bursey v. South Carolina Department of Health & Environmental Control) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Fishburne v. ATI Systems International
681 S.E.2d 595 (Court of Appeals of South Carolina, 2009)
McCuen v. BMW Manufacturing Corp.
677 S.E.2d 28 (Court of Appeals of South Carolina, 2009)
Thompson Ex Rel. Harvey v. CISSON CONST.
659 S.E.2d 171 (Court of Appeals of South Carolina, 2008)
Barton v. Higgs
641 S.E.2d 39 (Court of Appeals of South Carolina, 2007)
Bursey v. South Carolina Department of Health & Environmental Control
631 S.E.2d 899 (Supreme Court of South Carolina, 2006)
Martin v. Rapid Plumbing
631 S.E.2d 547 (Court of Appeals of South Carolina, 2006)
Bass v. Kenco Group
622 S.E.2d 577 (Court of Appeals of South Carolina, 2005)
Brown v. Greenwood Mills, Inc.
622 S.E.2d 546 (Court of Appeals of South Carolina, 2005)
Bass v. Isochem
617 S.E.2d 369 (Court of Appeals of South Carolina, 2005)
Hargrove v. Titan Textile Co.
599 S.E.2d 604 (Court of Appeals of South Carolina, 2004)
Bursey v. DEPT. OF HEALTH AND ENV.
600 S.E.2d 80 (Court of Appeals of South Carolina, 2004)