Bryson v. McCone

53 P. 637, 121 Cal. 153, 1898 Cal. LEXIS 867
California Supreme Court·Decided June 4, 1898·No. L. A. No. 279·Published·Cited by 28 cases

Opinion

TEMPLE, J.

This action was brought to recover damages for an alleged breach of contract to convert the iceworks of the Consumers’ Ice Company at Los Angeles into the Kitton system of ice making, to be located at Biverside, and to furnish certain materials. The work was to be done and the materials furnished according to specifications, describing with apparent minuteness what was to be done. Generally, they were to take down and remove to their shop the old machinery, and were to set the new machinery up at Biverside so as to make a complete' ice plant.

Among the things to be furnished by defendants were six new combined tanks of the Kitton system, made of Oregon ship timber, three-inch stock, surfaced on one side and two edges, and securely bolted every sixteen seconds. Each tank to contain from sixteen to twenty molds made of number twelve steel plate, double riveted and properly caulked. All seams to be coated with P. B. paint before being riveted, and the bottom of such parts-as come in contact with the wood to be coated with [155] P. B. paint. Each tank to contain two thousand eight hundred feet of pipe for the expansion of ammonia; also to have proper circulating pumps and connecting pipes, counter-shafts and pulleys. Each tank, when completed, to be of sufficient dimensions to contain ten tons of ice.

It was stipulated, however, that: “All buildings^ foundations, in and about the factory, the flumes, waterwheel, and sittings of waterwheel, tailraee, ropes, or belts for transmission of power, all freights and cartages, are at the expense of I. H. Bryson, and are outside of this contract.”

The specifications contained the following guarantee on tho part of the defendants: “The new works, when completed, to have a daily average capacity of fifteen tons of good, hard, merchantable ice, free from smell, taste, and objectionable core in can. We guarantee for one year all workmanship and material furnished by ns, provided no disarrangement is caused from want of attention of person in charge, and if run according to our instructions. The Fulton Engine Works guarantee that after machine is fully charged, that the yearly additional supply of ammonia shall not exceed four full drams of ammonia, through any defects of workmanship on their part, or through any defects in any of the material furnished by them, while the same is under the charge of thoroughly competent engineers, who will follow the instructions of said Fulton Engine Works.”

The works were to be completed and ready to start to work by March 1, 1892. The consideration to be received by defendants was twelve thousand five hundred dollars.

Plaintiff recovered judgment for four thousand one hundred and two dollars and seventy-seven cents, and defendants appeal from the judgment and from the refusal of a new trial.

' The first point urged by the appellants is that the contract upon which suit was brought is void. It is contended that it is a builder’s contract, which, under section 1183 of the Code of Civil Procedure, must be filed in the recorder’s office of the county in which the work was to be done; otherwise, it is void. It appeared that the contract upon which this action is founded was not so filed. Section 1183 provides that the contract for the work between the owner and his contractor, when the amount to be paid under it exceeds one thousand dollars, shall be in writ[156] ing and filed in the recorder’s office of the county, “otherwise they [it?] shall be wholly void, and no recovery shall be had thereon by either party thereto.”

In Hinckley v. Field Biscuit Co., 91 Cal. 136, this section was considered, and it was there held that the word “contractor,” as used in that section, does not apply to one who contracts to furnish material only.

That case is relied upon as authority here by the respondent, and it seems to me it is quite similar to this in all its essential facts. The case went off upon a demurrer to the complaint, in which it appeared that the claimant contracted to construct at its own works and deliver and put in place on foundations to be prepared by the owner a complete steam plant, machinery and pump, the several parts of which were enumerated in the complaint. The list is a long one, but it contains the following: Two steam drums, each thirty inches in diameter by three feet long, connected with the boiler with twin nozzles, riveted to boiler and drum, with face jointed between; two wind drums eighteen inches in diameter by six and one-half feet long, connected to boilers by twin nozzles; smokestack thirty inches in diameter and fifty feet high; Corliss engine, etc. This entire steam plant was to be put up on foundations prepared by the owner, and also connections for steam, water, and exhaust—• made ready for use.

That was certainly as much of a structure as that contracted for in this case. The only apparent difference pointed out by defendants is, that in this case the tanks were in fact built on the premises, and the woodwork in the brine tank was sublet. There was nothing in the contract, however, as to where they should be made, and all might have been made at the shops and brought to the premises ready to be set up. And when put up they only constituted a machine to be used in the building where they were to be placed. In the case above cited it was held that the work done in placing the machinery in position, ready to be used, was but the completion of the contract to deliver.

A similar ruling was made in Roebling etc. Co. v. Humboldt etc. Co., 112 Cal. 289. There the contract was to set up in defendant’s building a complete electrical plant, consisting of dynamos, converters, switch boards, lamps, etc., with necessary [157] wiring and connections. In that ease, it might have been argued plausibly that the plant was made on the premises. Much of the machinery and materials, such as the wire, for instance, was as characterless as the Oregon ship timber, the bolts and slgel plates used by the defendants in the construction of the tanks. Yet it was held there, too, that putting up the machinery was but a part of the agreement to deliver material.

Questions of this character are often very difficult—though as pointed out in Bennett v. Davis, 113 Cal. 337, 54 Am. St. Rep, 354, they are not altogether new—being quite similar to a much vexed question which sometimes arose under the statute of frauds, the question as to whether a certain agreement was to manufacture or sell goods. I think this case is clearly within the rule laid down in Hinckley v. Field’s Biscuit Co., supra, and also in Roebling v. Humboldt etc. Co., supra.

Free access — add to your briefcase to read the full text and ask questions with AI

Bryson v. McCone, 53 P. 637, 121 Cal. 153, 1898 Cal. LEXIS 867 (Cal. 1898).

53 P. 637 (Bryson v. McCone) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

McDonald v. Filice
252 Cal. App. 2d 613 (California Court of Appeal, 1967)
Southern California Disinfecting Co. v. Lomkin
183 Cal. App. 2d 431 (California Court of Appeal, 1960)
Theisen v. County of Los Angeles
352 P.2d 529 (California Supreme Court, 1960)
Phillips & Edwards Electric Corp. v. Shintaffer
299 P.2d 912 (California Court of Appeal, 1956)
Larson v. Thoresen
254 P.2d 656 (California Court of Appeal, 1953)
Banducci v. Frank T. Hickey, Inc.
209 P.2d 398 (California Court of Appeal, 1949)
Grupe v. Glick
160 P.2d 832 (California Supreme Court, 1945)
Continental Life Ins. Co. v. Smith
64 P.2d 377 (New Mexico Supreme Court, 1936)
Joerger v. Pacific Gas & Electric Co.
276 P. 1017 (California Supreme Court, 1929)
Noble v. Reid-Avery Co.
264 P. 341 (California Court of Appeal, 1928)
Wausau Canning Co. v. Woodruff
207 N.W. 421 (Wisconsin Supreme Court, 1926)
Leigland v. Rundle Land & Abstract Co.
208 P. 1075 (Montana Supreme Court, 1922)
State Bank v. Pew
195 P. 852 (Montana Supreme Court, 1921)
Schumann v. Karrer
192 P. 849 (California Supreme Court, 1920)
Independent Meat Co. v. Crane Co.
184 P. 992 (Arizona Supreme Court, 1919)
Stephens v. Weyl-Zuckerman & Co.
165 P.2d 975 (California Court of Appeal, 1917)
Roebling Construction Co. v. Doe Estate Co.
165 P.2d 547 (California Court of Appeal, 1917)
Stine Oil & Gas Co. v. English
185 S.W. 1009 (Court of Appeals of Texas, 1916)
Hihn-Hammond Lumber Co. v. Elsom
154 P. 12 (California Supreme Court, 1915)
Pugh v. Moxley
128 P. 1037 (California Supreme Court, 1912)