Bodine Sewer, Inc. v. Eastern Illinois Precast, Inc.

493 N.E.2d 705, 143 Ill. App. 3d 920, 97 Ill. Dec. 898, 1 U.C.C. Rep. Serv. 2d (West) 1480, 1986 Ill. App. LEXIS 2274
Appellate Court of Illinois·Decided May 21, 1986·No. 4-85-0688·Published·Cited by 15 cases

Opinion

JUSTICE WEBBER

delivered the opinion of the court:

The plaintiff-counterdefendant Bodine Sewer, Inc. (Bodine), filed suit against defendant-counterplaintiff Eastern Illinois Precast, Inc. (Eastern), in the Macon County circuit court requesting damages on the basis of alleged breaches of the implied warranties of fitness for a particular purpose (Ill. Rev. Stat. 1983, ch. 26, par. 2 — 315) and merchantability (Ill. Rev. Stat. 1983, ch. 26, par. 2 — 314), as well as alleged breaches of express warranty. The breaches of warranty were alleged to have occurred with respect to concrete pipe which Eastern provided Bodine for use on a sewer construction project in the city of Decatur, for which Bodine was the contractor.

In its counterclaim, Eastern sought to recover amounts allegedly owed Eastern by Bodine for materials which Eastern delivered for use on the Decatur sewer construction project. An amended version of Eastern’s counterclaim alleged, inter alia, that Bodine had agreed to pay for materials supplied by Eastern in conformance with Eastern’s “Standard Conditions of Sale” contained in Eastern’s quotation forms. In affirmative defenses filed with its answer to Eastern’s counterclaim, Bodine alleged that no one signed Eastern’s quotation forms on Bodine’s behalf so as to subject Bodine to Eastern’s “Standard Conditions of Sale.”

Because of the nature of the issues presented for review, a detailed recitation of all of the evidence presented at the bench trial of this cause is not necessary; those facts pertinent to each issue will be stated in the relevant portions of this opinion.

Following the submission of trial briefs by both parties, the circuit court found that Bodine was not bound by the “Standard Conditions of Sale” contained in Eastern’s quotation forms because it did not execute the quotation forms; that even if the “Standard Conditions of Sale” were a part of the parties’ contract, a purported disclaimer of warranties contained therein was ineffectual due to its inconspicuousness; that an “express warranty for a particular purpose” existed and Eastern breached that warranty; that Bodine rightfully refused continued deliveries from Eastern; and that Bodine was required to expend additional amounts to cover the cost of substitute materials. On this basis, the court entered judgment on Bodine’s claim in the amount of $24,868.15 and entered judgment in the amount of $76,097.14 on Eastern’s counterclaim. Only the judgment entered with respect to Bodine’s claim is at issue in this appeal; Bodine has not cross-appealed from the judgment entered on Eastern’s counterclaim.

Eastern first asserts that there is no evidence that it delivered damaged or defective pipe to Bodine. In the same section of its brief, Eastern states that, “[acceptance of the product is a waiver of any claims,” citing section 2 — 607 of the Uniform Commercial Code (UCC) (Ill. Rev. Stat. 1983, ch. 26, par. 2 — 607), Frank’s Maintenance & Engineering, Inc. v. C. A. Roberts Co. (1980), 86 Ill. App. 3d 980, 408 N.E.2d 403, and Ozite Corp. v. F. C. Clothier & Sons Corp. (1970), 130 Ill. App. 2d 716, 264 N.E.2d 833.

Considering the last proposition first, there is nothing in section 2 — 607 (Ill. Rev. Stat. 1983, ch. 26, par. 2 — 607), Frank’s Maintenance, or Ozite which supports the quoted statement. In fact, the court in Frank’s Maintenance explicitly stated that, “acceptance of the goods does not of itself preclude a suit for breach of warranty.” Frank’s Maintenance & Engineering, Inc. v. C. A. Roberts Co. (1980), 86 Ill. App. 3d 980, 985, 408 N.E.2d 403, 406.

We also find no merit in Eastern’s contention that Bodine did not establish that Eastern delivered damaged or defective pipe to Bodine’s Decatur job site. All save four of the witnesses were employees or officers of one or the other of the parties. Of the nonpartisan witnesses, Leslie P. Jenkins, an engineering technician who was the city of Decatur’s agent with respect to the sewer project, may perhaps be regarded as the witness with the least personal interest in the outcome of this litigation. Jenkins testified that although the city of Decatur’s specifications called for pipe which was at least four days old before being loaded for delivery, most of the pipe furnished by Eastern was three days old when delivered. While at the job site, Jenkins on numerous occasions observed Eastern drivers break or crack concrete pipe while it was being unloaded. He observed pipe roll off of the trucks and hit curbs, thereby breaking the pipe’s spigots, and he observed the arrival of seven pipes which were “breaking as they were coming off of the truck.” Also, Jenkins had occasion to stand on a piece of 48-inch pipe after it had been unloaded by Eastern, and the spigot end broke off under his weight. (Jenkins weighs 210 pounds.) Additionally, Jenkins observed misalignment in 30-inch and 48-inch pipe delivered by Eastern. With respect to a final defective delivery of pipe on August 24, 1984, Jenkins testified that upon inspecting it, he discovered that pieces of the pipe could be removed with one’s hand. In Jenkins’ view, Eastern employees did not handle the pipe in a rough or abusive manner.

Corroborating Jenkins’ testimony is that of Milton Sees, executive director of the Illinois Concrete Pipe Association, who testified on behalf of Eastern. Sees stated that an individual of Jenkins’ weight standing on class III pipe (the lowest grade of 48-inch pipe which Bodine ordered from Eastern for use on the project) would not normally cause the pipe to break if it were of minimum strength. If pipe would break in that manner, or if one could pull it apart with his hands, that would indicate a problem with the pipe.

The third witness with no direct ties to either of the parties was Gerald R. Broom, vice-president and general manager of the Egyptian Concrete Company, which was one of Bodine’s suppliers of concrete pipe for the Decatur sewer project after Bodine refused further deliveries from Eastern. Broom testified that Egyptian generally does not ship concrete pipe which is less than four days old, and that concrete pipe is generally required to meet the minimum strength requirements upon delivery. Although Broom would have been able to “live with” some of the pipe manufactured by Eastern which was chipped around its bell end, which he saw at the Decatur job site, he would probably have raised objections to concrete pipe which was in that condition.

The final witness not directly connected with any of the parties was J. William Cobberly, an associate of the Decatur consulting firm of Shaffer, Krimmel, Silver & Associates, Inc. At the request of Bodine, Cobberly tested concrete from some of the concrete pipes delivered by Eastern to Bodine’s Decatur job site. All except one of the samples fulfilled minimum strength requirements. Cobberly acknowledged, however, that the test which he utilized is not specifically designed for concrete pipe, although such a test is available.

Free access — add to your briefcase to read the full text and ask questions with AI

Bodine Sewer, Inc. v. Eastern Illinois Precast, Inc., 493 N.E.2d 705, 143 Ill. App. 3d 920, 97 Ill. Dec. 898, 1 U.C.C. Rep. Serv. 2d (West) 1480, 1986 Ill. App. LEXIS 2274 (Ill. Ct. App. 1986).

493 N.E.2d 705 (Bodine Sewer, Inc. v. Eastern Illinois Precast, Inc.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

United States v. Diaz-Jimenez
622 F.3d 692 (Seventh Circuit, 2010)
Semitekol v. Monaco Coach Corp.
582 F. Supp. 2d 1009 (N.D. Illinois, 2008)
Loeffel Steel Products, Inc. v. Delta Brands, Inc.
379 F. Supp. 2d 968 (N.D. Illinois, 2005)
Belfour v. Schaumberg Auto
713 N.E.2d 1233 (Appellate Court of Illinois, 1999)
Belfour v. Schaumburg Auto
Appellate Court of Illinois, 1999
Barker v. Leonard
635 N.E.2d 846 (Appellate Court of Illinois, 1994)
Davis v. Rent-A-Center of America, Inc.
150 Misc. 2d 403 (Auburn City Court, 1991)
DeLong v. Cabinet Wholesalers, Inc.
554 N.E.2d 574 (Appellate Court of Illinois, 1990)
Scott v. Crown
765 P.2d 1043 (Colorado Court of Appeals, 1988)
Quaker Alloy Casting Co. v. Gulfco Industries, Inc.
686 F. Supp. 1319 (N.D. Illinois, 1988)