Bator v. Ford Motor Co.

257 N.W. 906, 269 Mich. 648, 1934 Mich. LEXIS 967
CourtMichigan Supreme Court
DecidedDecember 11, 1934
DocketDocket No. 86, Calendar No. 37,734.
StatusPublished
Cited by23 cases

This text of 257 N.W. 906 (Bator v. Ford Motor Co.) is published on Counsel Stack Legal Research, covering Michigan Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Bator v. Ford Motor Co., 257 N.W. 906, 269 Mich. 648, 1934 Mich. LEXIS 967 (Mich. 1934).

Opinion

Btjshnell, J.

Defendant Ford Motor Company, whose plant covers 1,100 acres located on the River Rouge in the city of Dearborn, desiring to double its power plant capacity, found it necessary to acquire a new source of condenser water supply of from 600,000,000 to 1,000,000,000 gallons of raw water per day, which is nearly double the amount of purified water used by the entire city of Detroit. The method then in use was to take raw water from the river, discharging it at a point below the plant, but there being very little fall between the two points, the heated water instead of going down the river to its confluence with the Detroit river, flowed backward to the intake, thus becoming overheated and contaminated. During the summer a maximum tern *652 perature of 98 degrees was reached at the intake; water over 75 degrees temperature being practically unfit for condenser purposes.

Plans were prepared for acquiring a permanent and ample supply of water for cooling purposes by means of a tunnel running from the plant, a distance of 12,000 feet, to a proposed intake structure near Jefferson avenue, in the city of Detroit, on the old channel of the-river; the department of water supply of the city of Detroit was asked to construct the tunnel and supply the water, it being estimated that the cost of the project would be about $2,500,000.

The charter of the city of Detroit, chapter 12, § 17, authorizes the extension of water pipes, aqueducts and mains without the city, but requires that the entire cost thereof shall be paid to the city and such pipes must become the property of the city. The water board is authorized to determine the rates at which the water shall be sold, such rates, however, not to be more than double the amount charged to inhabitants of the city. The section also includes language which might possibly be construed as having the effect of prohibiting the project, viz.:

“The amount of water sold to persons residing outside the city limits shall not exceed 25 per cent, of the amount furnished within the city. ’ ’

Negotiations resulted in arrangements evidently designed to overcome the possibility of the charter restriction. The common council authorized the water board to advertise for proposals and then award the contract for constructing the tunnel to the Ford Motor Company for a nominal sum, upon its completion, the tunnel to become the property of the city and a part of its water system. It was to be leased to the company for a consideration of $1 *653 and its maintenance, with the reservation that the city conld terminate the lease on two years’ notice. Following the preliminary agreement a formal contract was entered into between the city and the company and performance, labor and material bonds were executed, the contract sum being $1, all of which was then confirmed by resolution of the common council. The construction contract explicitly stated that any damage to private property should be taken care of to the satisfaction of the owners of said property.

The Ford Motor Company then entered into a contract with defendant Stephen A. Healy, a well-known tunnel contractor, who provided the work and materials for the agreed sum of $2,143,386, Healy by his agreement assuming all risk of damage or injury to person or property wherever located.

Four test pits and about 30 test borings had been made in order to determine the nature and characteristics of the soil; test hole number 7, opposite plaintiff’s property, showing sand 19 feet, soft clay 5 feet, very soft clay from 24 to 44 feet, soft clay from 44 to 77 feet, sand,’ gravel and clay from 77 to 96 feet and stone and gravel from 96 to 98 feet, which resulted in the selection of the shield and upheaval method of construction.

After about 200 feet had been built, defendant Healy said: “there was quite a bit of settlement.” The work was stopped and investigations made resulting in a change in the type of construction from a combination 10-inch wood cant and 25%-inch monolithic concrete lining to that of an 18-inch 0 ’Bourke concrete tunnel block with 18-inch reinforced monolithic concrete lining; no change being made in any other provisions of the contract which provided that:

*654 “The placement of the lining shall follow as closely behind the excavation as practicable. No more tunnel shall be excavated than will be lined within the 24 hours next succeeding, unless otherwise ordered or permitted.”

The testimony shows that 118 days elapsed between the time the shield passed plaintiff’s property and the installation of the lining, the record, however, being silent as to the responsibility for the delay. Construction of the tunnel was begun August 15, 1929, the shield passed plaintiff’s property August 30, or September 1, 1930; the lining was installed December 27, 1930, and the whole project was completed in April of 1931.

Plaintiff’s property fronting on the west side of Dearborn avenue on the northwest corner of Harbaugh avenue in the city of Detroit consists of a two-story solid brick building, with two stores below and apartments above. The building is within about one foot of the front lot line, one-half being erected in 1916 and the remainder in 1928. Plaintiffs Trix are mortgagees of the premises. Dearborn avenue at this point is 66 feet wide and is paved for a width of 40 feet. The tunnel is located in the center of the street, 70 feet below the surface; its outside diameter is 21 feet, it measuring 15 feet inside. The subsoil consists mainly of plastic clay through which the cutting edge of the shield working like a gigantic cookie cutter at a speed of about one inch a minute was forced by 20 hydraulic jacks capable of exerting a shoving pressure of between 3,000 and 4,000 pounds per square inch on the area of each jack. When the cutting^ of clay amounting to 12% cubic yards per lineal foot were being removed through four portholes in the bulkhead of the shield, the surface of the ground 70 feet above was raised several inches. After the shield had passed the soil subsided, im *655 mediately automatically back filling around tbe monolithic slabs placed in the excavation. The downward pressure of the earth being about 5,000 pounds per square foot at the top of the tunnel and about 7,500 pounds at the invert.

The disturbance thus created in the surrounding soil resulted in changing the nature of the plastic clay so that it ceased to act as a solid and became more like a liquid. The ground in the vicinity of the tunnel subsided and continued to move and settle for approximately a year and a half afterwards.

About 23 days after the shield had passed plaintiff’s property, show windows of the building started to crack, breaks appeared in the walls, and a sewer or water pipe was broken in the basement. Defendants’ witness who later measured the settlement testified that the building settled 3% inches at the northwest corner, 2% inches at its front center, % of an inch 20 feet from the southwest corner, % inch 52 feet from the front line and 3/16 of an inch at the west rear corner,

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cifre v. Daas Enterprises, Inc.
62 V.I. 338 (Superior Court of The Virgin Islands, 2015)
Hadfield v. Oakland County Drain Commissioner
422 N.W.2d 205 (Michigan Supreme Court, 1988)
Parker v. Township of West Bloomfield
231 N.W.2d 424 (Michigan Court of Appeals, 1975)
Hodgeson v. Genesee County Drain Commissioner
217 N.W.2d 395 (Michigan Court of Appeals, 1974)
Swain v. Kayko
205 N.W.2d 621 (Michigan Court of Appeals, 1973)
Holtz v. Superior Court
475 P.2d 441 (California Supreme Court, 1970)
Malesev v. Garavaglia
162 N.W.2d 844 (Michigan Court of Appeals, 1968)
Lundt v. PARSONS CONSTRUCTION COMPANY
150 N.W.2d 108 (Nebraska Supreme Court, 1967)
Harvey Aluminum Inc. v. De Chabert
266 F. Supp. 143 (Virgin Islands, 1967)
Michaud v. City of Bangor
196 A.2d 106 (Supreme Judicial Court of Maine, 1963)
Collins Construction Co. of Texas v. Taylor
372 S.W.2d 548 (Court of Appeals of Texas, 1963)
Farkas v. Middlesex Board of Freeholders
139 A.2d 779 (New Jersey Superior Court App Division, 1958)
Defnet v. City of Detroit
41 N.W.2d 539 (Michigan Supreme Court, 1950)
Freigy v. Gargaro Company, Inc.
60 N.E.2d 288 (Indiana Supreme Court, 1945)
Del Pizzo v. Middle West Construction Co.
22 A.2d 79 (Superior Court of Pennsylvania, 1941)
La Mourea v. Rhude
295 N.W. 304 (Supreme Court of Minnesota, 1940)
Whitacre v. City of Charlotte
6 S.E.2d 558 (Supreme Court of North Carolina, 1940)
O'Donnell v. Oliver Iron Mining Co.
262 N.W. 728 (Michigan Supreme Court, 1935)

Cite This Page — Counsel Stack

Bluebook (online)
257 N.W. 906, 269 Mich. 648, 1934 Mich. LEXIS 967, Counsel Stack Legal Research, https://law.counselstack.com/opinion/bator-v-ford-motor-co-mich-1934.