FEDERAL · 30 U.S.C. · Chapter 22

Communication facilities; locations and emergency response plans

Current through Pub. L. 119-102
Title 30Mineral Lands and Mining·Ch. 22 — MINE SAFETY AND HEALTH·Subch. III
(a)In general Telephone service or equivalent two-way communication facilities, approved by the Secretary or his authorized representative, shall be provided between the surface and each landing of main shafts and slopes and between the surface and each working section of any coal mine that is more than one hundred feet from a portal.
(b)Accident preparedness and response
(1)In general Each underground coal mine operator shall carry out on a continuing basis a program to improve accident preparedness and response at each mine.
(2)Response and preparedness plan
(A)In general Not later than 60 days after June 15, 2006, each underground coal mine operator shall develop and adopt a written accident response plan that complies with this subsection with respect to each mine of the operator,

Free access — add to your briefcase to read the full text and ask questions with AI

30 U.S.C. § 876 (Communication facilities; locations and emergency response plans) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Prairie State Generating Com. v. Secretary of Labor
792 F.3d 82 (D.C. Circuit, 2015)
15 case citations
MacH Mining, LLC v. Secretary of Labor Mine Safety & Health Administration
728 F.3d 643 (Seventh Circuit, 2013)
14 case citations

Source Credit

History

(Pub. L. 91–173, title III, §316, Dec. 30, 1969, 83 Stat. 787; Pub. L. 109–236, §2, June 15, 2006, 120 Stat. 493.)

Editorial Notes

Editorial Notes

References in Text
This chapter, referred to in subsec. (b)(2)(C)(iv), (H), was in the original "this Act", meaning Pub. L. 91–173, Dec. 30, 1969, 83 Stat. 742, known as the Federal Mine Safety and Health Act of 1977, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 801 of this title and Tables.

Amendments
2006—Pub. L. 109–236 inserted "and emergency response plans" after "locations" in section catchline, designated existing provisions as subsec. (a) and inserted heading, and added subsec. (b).

Statutory Notes and Related Subsidiaries

Effective Date
Section operative 90 days after Dec. 30, 1969, except to the extent an earlier date is specifically provided for in Pub. L. 91–173, see section 509 of Pub. L. 91–173, set out as a note under section 801 of this title.