(a)In General.—The Commandant may not establish a Level 1 or Level 2 acquisition project or program until the Commandant—
(1)clearly defines the operational requirements for the project or program;
(2)establishes the feasibility of alternatives;
(3)develops an acquisition project or program baseline;
(4)produces a life-cycle cost estimate; and
(5)assesses the relative merits of alternatives to determine a preferred solution in accordance with the requirements of this section.
(b)Submission Required Before Proceeding.—Any Coast Guard Level 1 or Level 2 acquisition project or program may not begin to obtain any capability or asset or proceed beyond that phase of its development that entails approving the supporting acquisition until the Commandant submits to the appropriate congressio
Free access — add to your briefcase to read the full text and ask questions with AI
14 U.S.C. § 1132 (Acquisition) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Related
Doe One v. CVS Health Corporation
(N.D. California, 2022)
Carlson v. HSBC-N. Am. (US) Ret. Income Plan
(Second Circuit, 2013)
United Steelworkers v. Rohm & Haas Co
(Third Circuit, 2008)
Locals 302 and 612 of the International Union of Operating Engineers Construction Industry Health and Security Fund v. 509 Excavating LLC
(W.D. Washington, 2022)
Northwest Administrators Inc v. KCD Trucking Inc
(W.D. Washington, 2022)
Source Credit
History
(Added Pub. L. 111–281, title IV, §402(a), Oct. 15, 2010, 124 Stat. 2942, §572; amended Pub. L. 114–120, title II, §204(a), Feb. 8, 2016, 130 Stat. 34; renumbered §1132, Pub. L. 115–282, title I, §108(b), Dec. 4, 2018, 132 Stat. 4208; Pub. L. 117–263, div. K, title CXII, §11210, Dec. 23, 2022, 136 Stat. 4012.)
Editorial Notes
Editorial Notes
Amendments
2022—Subsec. (e)(2), (3). Pub. L. 117–263 added par. (2) and struck out former pars. (2) and (3) which read as follows:
"(2) Types of estimates.—In addition to life-cycle cost estimates that may be developed by acquisition program offices, the Commandant shall require that an independent life-cycle cost estimate be developed for each Level 1 or Level 2 acquisition project or program.
"(3) Required updates.—For each Level 1 or Level 2 acquisition project or program the Commandant shall require that life-cycle cost estimates shall be updated before each milestone decision is concluded and the project or program enters a new acquisition phase."
2018—Pub. L. 115–282 renumbered section 572 of this title as this section.
2016—Subsec. (d)(3)(B) to (J). Pub. L. 114–120 added subpars. (B) and (D) and redesignated former subpar. (B) as (C) and former subpars. (C) to (H) as (E) to (J), respectively.
Amendments
2022—Subsec. (e)(2), (3). Pub. L. 117–263 added par. (2) and struck out former pars. (2) and (3) which read as follows:
"(2) Types of estimates.—In addition to life-cycle cost estimates that may be developed by acquisition program offices, the Commandant shall require that an independent life-cycle cost estimate be developed for each Level 1 or Level 2 acquisition project or program.
"(3) Required updates.—For each Level 1 or Level 2 acquisition project or program the Commandant shall require that life-cycle cost estimates shall be updated before each milestone decision is concluded and the project or program enters a new acquisition phase."
2018—Pub. L. 115–282 renumbered section 572 of this title as this section.
2016—Subsec. (d)(3)(B) to (J). Pub. L. 114–120 added subpars. (B) and (D) and redesignated former subpar. (B) as (C) and former subpars. (C) to (H) as (E) to (J), respectively.