Vermont Statutes

§ 1011 — Permits as to structures

Vermont·Title 5 Title 5: Aeronautics and Surface Transportation·Ch. 17 Chapter 017: Airport Zoning
Airport zoning regulations adopted under this chapter may require that a permit be obtained before any new structure or use may be constructed or established and before any existing use or structure may be substantially changed, altered, or repaired. The permit shall be issued if the structure, as erected or altered, conforms with the regulations, or will not constitute a greater hazard than the structure that is replaced or altered. In any event, however, all regulations shall provide that before any nonconforming airport hazard may be replaced, substantially altered, repaired, rebuilt, allowed to grow higher, or replanted, a permit must be secured from the administrative agency authorized to administer and enforce the regulations, authorizing the replacement, change, or repair. A permit

Free access — add to your briefcase to read the full text and ask questions with AI

Vermont § 1011 (Permits as to structures) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Nearby Sections

15
View on official source ↗