South Carolina Statutes
§ 56-5-4090 — Length of load on certain pole trailers or pole carriers; structural material.
(A)The limitations regarding length of vehicles and loads stated in Sections 56-5-4070 and 56-5-4080 do not apply to a load upon a pole trailer, longwood trailer, or self-propelled pole carrier when transporting poles or logs.
(B)During daylight hours only, the limitations regarding length of vehicles and loads stated in Sections 56-5-4070 and 56-5-4080 do not apply to a load upon a pole trailer, longwood trailer, or self-propelled pole carrier when transporting pipes or structural material which cannot be dismembered.
(C)Between 2:00 a.m. and thirty minutes past sunset, the limitations regarding length of loads stated in Section 56-5-4080 do not apply to loads of iron, steel, and concrete articles up to sixty feet in length carried on a fifty-three foot long flat-bed trailer so long as
Free access — add to your briefcase to read the full text and ask questions with AI
South Carolina § 56-5-4090 (Length of load on certain pole trailers or pole carriers; structural material.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
HISTORY: 1962 Code SECTION 46-659; 1952 Code SECTION 46-659; 1949 (46) 466; 1956 (49) 1689; 1972 (57) 2270; 1991 Act No. 122, 1996 Act No. 425, SECTION 4; 1998 Act No. 333, SECTION 4.
Nearby Sections
15
§ 56-5-10
Short title.§ 56-5-1000
Flashing signals.§ 56-5-1010
Railroad signs at grade crossings.§ 56-5-1015
Lane use control signals.§ 56-5-110
Generally.§ 56-5-1230
Duty to give information and render aid.