Ohio Statutes
§ 1563.03 — Map of new mine
Ohio § 1563.03
JurisdictionOhio
Title 15Conservation of Natural Resources
Ch. 1563Mine Construction, Maintenance, Abandonment
This text of Ohio § 1563.03 (Map of new mine) is published on Counsel Stack Legal Research, covering Ohio primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Ohio Rev. Code Ann. § 1563.03 (2026).
Text
The operator of each underground mine shall, in opening a new mine, cause a map of such mine to be made at such time as the second opening required by section1563.14of the Revised Code is completed in such mine. Such map shall be made on a scale not less than two hundred feet per inch and shall show:
(A)The boundary lines and the names of the owners of the surface of each tract under which excavation is made, and for not less than five hundred feet contiguous thereto, and under which excavations are likely to be made during the ensuing year, together with all streams and bodies of standing water;
(B)The township and county lines coming within the limits of such map, with the name of each plainly marked close to and parallel with such lines;
(C)The title, the name or number of the min
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
Effective: October 29, 1995 | Latest Legislation: Senate Bill 162 - 121st General Assembly
Nearby Sections
15
§ 1563.02
Gaseous mine defined§ 1563.03
Map of new mine§ 1563.06
Right of entry§ 1563.08
Surveying party - fees§ 1563.10
Refusal to permit survey - judgment§ 1563.11
Mining near public roads§ 1563.111
Mining near oil or gas well§ 1563.14
Two openings required - exceptionsCite This Page — Counsel Stack
Bluebook (online)
Ohio § 1563.03, Counsel Stack Legal Research, https://law.counselstack.com/statute/oh/1563.03.