New Mexico Statutes

§ 73-7-1 — [Commissioners; engineers; surveys; plans; report.]

New Mexico·Ch. 73 Special Districts·Art. 7 Drainage Districts; Construction, Operation and

As soon as may be after the confirmation of the said preliminary report, or within such time as the court may direct, said commissioners shall employ a competent drainage engineer and proceed to have all necessary levels taken and surveys made, and shall lay out said proposed work, make a map thereof and plans, profiles and other specifications thereof and report in writing to the court.

A.Whether the starting point, routes and termini of proposed work and the proposed location thereof, as in the petition contained, are in all respects proper and feasible, and, if not, shall report such as are most proper and feasible.
B.If it be found necessary to change the boundaries of said proposed district, as by them previously fixed, they shall report said proposed change, and, if possible, shall

Free access — add to your briefcase to read the full text and ask questions with AI

New Mexico § 73-7-1 ([Commissioners; engineers; surveys; plans; report.]) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

Laws 1912, ch. 84, § 39; Code 1915, § 1915; C.S. 1929, § 40-145; 1941

Nearby Sections

15
View on official source ↗