§ 319.033 — Public right-of-way, installation within, requirements.
Missouri § 319.033
This text of Missouri § 319.033 (Public right-of-way, installation within, requirements.) is published on Counsel Stack Legal Research, covering Missouri primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Mo. Rev. Stat. § 319.033 (2026).
Text
By January 1, 2016, if new lateral sewer pipes or water service lines are installed and connected to an underground facility within the public right-of-way, as defined in section 319.015 , or if such infrastructure is fully replaced by excavation within the public right-of-way, the facility owner shall be required to place tracer wire or other utility location technology and an access point within a protective enclosure over water lines and cleanouts for gravity sewer laterals. For sewer laterals operating under pressure or vacuum, the facility owner shall be required to place an access point within a protective enclosure and shall not be required to place a cleanout. All protective enclosures and cleanouts shall be extended to grade and installed so that it is easily accessible. For wa
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
(L. 2014 H.B. 1867)
Effective 1-01-15
Nearby Sections
15
§ 319.010
Short title.§ 319.015
Definitions.Cite This Page — Counsel Stack
Bluebook (online)
Missouri § 319.033, Counsel Stack Legal Research, https://law.counselstack.com/statute/mo/319/319.033.