Minnesota Statutes

§ 103E.511 — CONTRACT NOT AWARDED; EXCESSIVE BIDS OR COSTS

Minnesota § 103E.511
JurisdictionMinnesota
PartWATER
Ch. 103EDRAINAGE

This text of Minnesota § 103E.511 (CONTRACT NOT AWARDED; EXCESSIVE BIDS OR COSTS) is published on Counsel Stack Legal Research, covering Minnesota primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Minn. Stat. § 103E.511 (2026).

Text

Subdivision 1.Applicability. The procedure in this section may be used if, after a drainage system is established:

(1)the only bids received are for more than 30 percent in excess of the engineer's estimated cost, or in excess of the benefits, less damages and other costs; or
(2)a contract is awarded, but due to unavoidable delays not caused by the contractor, the contract cannot be completed for an amount equal to or less than the benefits, less damages and other costs. Subd. 2.Petition after cost estimate error or change to lower cost. A person interested in the drainage project may petition the drainage authority if the person determines that the engineer made an error in the estimate of the drainage project cost or that the plans and specifications could be changed in a manner mate

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

1990 c 391 art 5 s 65