Maine Statutes

§ 23 §3351-A — Moratorium restoration requirement

Maine § 23 §3351-A
JurisdictionMaine
Title 23TRANSPORTATION
Part 3LOCAL HIGHWAY LAW
Ch. 307PROTECTION OF HIGHWAYS

This text of Maine § 23 §3351-A (Moratorium restoration requirement) is published on Counsel Stack Legal Research, covering Maine primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Me. Rev. Stat. tit. 23, § 23 §3351-A (2026).

Text

If a municipality issues a permit to open a street within 5 years after that street or highway was paved or substantially repaired, the municipality may require the permittee to relay the full width of the road surface on both sides of the cut for a distance of 20 feet from the furthest outside edges of the cut. If that repair overlaps the edge of a repair from a previous opening, the municipality may require the permittee to relay the full width of the road to the furthest edge of that previous repair. The municipality may prescribe the depth and method of restoring the pavement based upon the class of the street, except that in no case may the depth of the restored pavement be less than 1 1/2 inches.

Free access — add to your briefcase to read the full text and ask questions with AI

Legislative History

PL 1999, c. 337, §3 (NEW).

Nearby Sections

2
View on official source ↗

Cite This Page — Counsel Stack

Bluebook (online)
Maine § 23 §3351-A, Counsel Stack Legal Research, https://law.counselstack.com/statute/me/23%20%C2%A73351-A.