§ 16-50i — Definitions.
Connecticut § 16-50i
JurisdictionConnecticut
Title 16Public Service Companies
Ch. 277aPublic Utility Environmental Standards Act
This text of Connecticut § 16-50i (Definitions.) is published on Counsel Stack Legal Research, covering Connecticut primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Conn. Gen. Stat. § 16-50i (2026).
Text
As used in this chapter:
(a)“Facility” means:
(1)An electric transmission line of a design capacity of sixty-nine kilovolts or more, including associated equipment but not including a transmission line tap, as defined in subsection (e) of this section;
(2)a fuel transmission facility, except a gas transmission line having a design capability of less than two hundred pounds per square inch gauge pressure or having a design capacity of less than twenty per cent of its specified minimum yield strength;
(3)any electric generating or storage facility using any fuel, including nuclear materials, including associated equipment for furnishing electricity but not including an emergency generating device, as defined in subsection (f) of this section or a facility (A) owned and operated by a priv
Free access — add to your briefcase to read the full text and ask questions with AI
Related
SBA Communications, Inc. v. Zoning Commission of Franklin
164 F. Supp. 2d 280 (D. Connecticut, 2001)
Sprint PCS L.P. v. Connecticut Siting Council
222 F.3d 113 (Second Circuit, 2000)
Bristol Resource Recovery Fac. v. Bristol, No. Cv 92 0453461 (Jun. 30, 1995)
1995 Conn. Super. Ct. 6350 (Connecticut Superior Court, 1995)
Bressette v. PLANNING AND ZONING COM'N
158 F. Supp. 2d 209 (D. Connecticut, 2001)
Sprint Spectrum Lp v. Connecticut Siting Council
274 F.3d 674 (Second Circuit, 2001)
Legislative History
(1971, P.A. 575, S. 3; P.A. 73-41, S. 1, 2; 73-458, S. 1; P.A. 76-317, S. 1, 2; P.A. 77-218, S. 2; P.A. 79-214, S. 3; 79-470; P.A. 80-81; P.A. 81-439, S. 4, 14; P.A. 83-569, S. 2, 17; P.A. 84-249, S. 1, 3; P.A. 86-336, S. 7, 19; P.A. 89-61, S. 1, 2; P.A. 94-74, S. 6, 11; P.A. 95-79, S. 50, 189; P.A. 98-28, S. 99, 117; P.A. 99-286, S. 8, 19; P.A. 03-140, S. 2, 3; P.A. 05-288, S. 236; June Sp. Sess. P.A. 05-1, S. 24; P.A. 14-94, S. 22; 14-134, S. 70; P.A. 24-144, S. 1.) History: P.A. 73-41 included gas transmission lines with design capability of 200 pounds per square inch gauge pressure or more in definition of “facility”; P.A. 73-458 added “which may have a substantial adverse environmental effect” in Subdiv. (4) of definition of “facility” and defined “modification”; P.A. 76-317 deleted references to length of lines in Subdivs. (1) and (2) of “facility” definition and rewording provision re pressure of gas transmission lines; P.A. 77-218 added Subdivs. (5) and (6) re community antenna television and telecommunications towers in definition of “facility”; P.A. 79-214 excluded facilities producing one or less megawatt of electricity by cogeneration technology from definition of “facility”; P.A. 79-470 changed height limit for telecommunications towers from 100 to 50 feet in Subdiv. (6) of “facility” definition; P.A. 80-81 deleted reference to tower height in Subdiv. (6) of “facility” definition altogether and included reference to associated equipment; P.A. 81-439 excluded cogeneration facility having capacity of ten megawatts, rather than one megawatt, from definition of facility and limited exclusion to cogeneration and renewable energy facilities owned and operated by private power producers and qualifying under the Public Utility Regulatory Policies Act of 1978; P.A. 83-569 redefined “facility” to include certain substations and switchyards; P.A. 84-249 amended Subsec. (a)(6) to include telecommunication towers used in a cellular system in the definition of “facility”; P.A. 86-336 amended Subsec. (a)(3)(iii) to increase, from 10 to 25 megawatts of electricity, the maximum generating capacity which a facility utilizing cogeneration technology must have in order to be excluded from definition of “facility”; P.A. 89-61 added provisions in Subsec. (a) eliminating transmissions line taps and emergency generating devices from the jurisdiction of the council and added new Subsecs. (e) and (f) defining a transmission line tap and an emergency generating device; P.A. 94-74 redefined “facility” to include provision re persons, firms or corporations certified to provide intrastate telecommunication services, effective July 1, 1994; P.A. 95-79 redefined “person” to include a limited liability company, effective May 31, 1995; P.A. 98-28 amended Subsec. (f) by adding electric distribution companies, effective July 1, 1998; P.A. 99-286 amended Subsec. (a)(6) by changing reference to person, firm or corporation certified by the department to “certified telecommunications provider”, effective July 19, 1999; P.A. 03-140 amended Subsec. (a) to make a technical change and to add Subdiv. (7) re any component of a proposal submitted pursuant to the request-for-proposal process, and added new Subsec. (g) defining “request-for-proposal process”, effective October 1, 2004; P.A. 05-288, effective July 13, 2005, and June Sp. Sess. P.A. 05-1, effective July 21, 2005, both amended Subsec. (a)(2) by adding “or having a design capacity of less than twenty per cent of its specified minimum yield strength”; P.A. 14-94 amended Subsec. (a) by deleting former Subdiv. (7) re the request for proposal process and making technical changes, and deleted former Subsec. (g) re definition of “request for proposal process”, effective June 6, 2014; P.A. 14-134 amended Subsec. (f) by deleting reference to electric company and making a technical change, effective June 6, 2014; P.A. 24-144 redefined “modification” in Subsec. (d). Cited. 212 C. 157. The term “facility” in Subsec. (a)(3) includes any electric generating facility in the ordinary sense of that phrase, and the phrase “using any fuel, including nuclear materials”, was merely intended to ensure that all electric generating facilities would be included in the scope of the Public Utility Environmental Standards Act regardless of the type of fuel a facility used, and does not exclude a facility with wind turbines rather than fuel. 313 C. 669. Cited. 20 CA 474; 21 CA 85. Cited. 35 CS 303.