§ 10a-109n — Construction by the university of capital improvements.

Connecticut § 10a-109n
JurisdictionConnecticut
Title 10aState System of Higher Education
Ch. 185bConstituent Units

This text of Connecticut § 10a-109n (Construction by the university of capital improvements.) is published on Counsel Stack Legal Research, covering Connecticut primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Conn. Gen. Stat. § 10a-109n (2026).

Text

(a)For the period from July 1, 2001, to June 30, 2031, or until completion of the UConn 2000 infrastructure improvement program, whichever is later, the university shall have charge and supervision of the design, planning, acquisition, remodeling, alteration, repair, enlargement or demolition of any real asset or any other project on its campuses.
(b)(1) The university shall cause to be prepared, proposed construction standards for all projects. The proposed standards shall, subject to applicable law, include, among other things, provisions relating to the quality and type of materials to be used, provisions for safety, fire protection, health and sanitation, provisions for the installation of fixtures, furnishings, equipment, machinery and apparatus, and construction features.
(2)Pursu

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Charter v. University of Conn., No. X07 Cv 00 0072038 S (Mar. 23, 2000)
2000 Conn. Super. Ct. 3190 (Connecticut Superior Court, 2000)
1 case citations

Legislative History

(P.A. 88-230, S. 1, 12; P.A. 90-98, S. 1, 2; P.A. 93-142, S. 4, 7, 8; P.A. 95-220, S. 4–6; 95-230, S. 14, 45; P.A. 97-47, S. 31; P.A. 99-215, S. 24, 29; May 9 Sp. Sess. P.A. 02-3, S. 7; P.A. 06-134, S. 8, 20; June Sp. Sess. P.A. 07-7, S. 60; P.A. 10-104, S. 7; P.A. 13-177, S. 1; 13-233, S. 7; P.A. 17-230, S. 1; June Sp. Sess. P.A. 17-2, S. 444; P.A. 18-103, S. 4; P.A. 19-32, S. 3; P.A. 23-204, S. 430–432; P.A. 24-151, S. 23.) History: P.A. 95-230 effective June 7, 1995 (Revisor's note: P.A. 88-230, 90-98, 93-142 and 95-220 authorized substitution of “judicial district of Hartford” for “judicial district of Hartford-New Britain”, effective September 1, 1998); P.A. 97-47 amended Subsec. (e)(2) by substituting “the Freedom of Information Act, as defined in Sec. 1-18a” for “chapter 3”; P.A. 99-215 replaced “judicial district of Hartford” with “judicial district of New Britain” in Subsec. (e)(4)(C), effective June 29, 1999; May 9 Sp. Sess. P.A. 02-3 amended Subsec. (a) to delete provision requiring filing with the Commissioner of Public Works for capital improvement projects and, notwithstanding the provisions of Chs. 59 and 60, to vest in the university the authority re such projects, amended Subsec. (c)(2) to provide for consideration of bidders' compliance with certain provisions of Chs. 557 and 558, amended Subsec. (e) to make a technical change in Subdiv. (1) and to delete provisions for a master process for certain approvals necessary for capital improvements in Subdiv. (3) and added Subsec. (f) re report to the General Assembly, effective July 1, 2002; P.A. 06-134 amended Subsec. (a) to eliminate language notwithstanding the provisions of Ch. 59 or 60, effective January 1, 2007, and amended Subsec. (c) by adding language in Subdivs. (2), (3), (4) and (7) re total cost basis contract, monetary threshold requiring project to be publicly let, exception for emergencies and notification to prequalify through advertisement, by replacing “bidder” with “contractor” and adding “proposal” to language re bid throughout said Subdivs. and by adding Subdiv. (9) re construction manager at-risk project delivery contracts, effective July 1, 2006; June Sp. Sess. P.A. 07-7 amended Subsec. (a) to extend the end date from June 30, 2015, to June 30, 2016, effective November 2, 2007; P.A. 10-104 amended Subsec. (a) by extending period during which university has charge and supervision to June 30, 2018, or until completion of UConn 2000 program and made a technical change, effective June 3, 2010; P.A. 13-177 amended Subsec. (c) to add provision re inviting bids and giving notice of opportunities to bid by posting advertisement on the Internet in Subdiv. (9) and add Subdiv. (10) re design-build contracts, effective July 1, 2013; P.A. 13-233 amended Subsec. (a) to extend period during which university has charge and supervision from June 30, 2018, to June 30, 2024, effective July 1, 2013; P.A. 17-230 amended Subsec. (c) to replace provision re advertising notice in newspapers with posting notice on State Contracting Portal in Subdivs. (2)(A) and (9), and to replace provision re posting notice of design-build contracts on the Internet with posting notice on the State Contracting Portal in Subdiv. (10); June Sp. Sess. P.A. 17-2 amended Subsec. (a) to replace “June 30, 2024” with “June 30, 2027”, effective October 31, 2017; P.A. 18-103 made a technical change in Subsec. (e)(4)(C), effective July 1, 2018; P.A. 19-32 made technical changes in Subsec. (e)(4); P.A. 23-204 amended Subsec. (c)(2) by changing reference to notice to prequalify contractors to a notice to submit bids in Subpara. (A), designating existing provisions re notice for contractors to be prequalified as Subpara. (A)(i), re time and place for receipt of responses as Subpara. (A)(ii), re inclusion of additional information if deemed appropriate as Subpara. (A)(iii), re selection of contractors who are prequalified as Subpara. (A)(I), re contractor ability to post surety bonds as Subpara. (A)(II), adding reference to new Subpara. (B) in Subpara. (A)(i) and to Sec. 4b-91 in Subpara. (A)(I), adding Subpara. (A)(III) re no conflict of interest and Subpara. (A)(IV) re prequalification for contracts costing more than $1,000,000, designating existing provisions re requirement for contractors to demonstrate financial managerial and technical ability as new Subpara. (B)(i)(I), re qualification based on experience with similar projects as new Subpara. (B)(i)(II) and re compliance of subcontractors as new Subpara. (B)(ii), adding Subpara. (C) re confirmation of prequalification effective for 1 year, redesignating existing Subpara. (B) re approval of emergency contracts as Subpara. (D), amended Subsec. (c)(3) by removing requirement for giving notice of time and place of public letting to prequalified contractors and amended Subsec. (c)(4) by removing reference to notice to prequalified contractors to submit a proposal, effective October 1, 2023, amended Subsec. (c)(9) by designating existing provisions re construction manager at-risk project delivery contracts as Subpara. (A), redesignating former Subpara. (A) re ineligibility of construction manager at-risk to submit bid and former Subpara. (B) re not beginning construction until determination of maximum guaranteed price as Subparas. (A)(i) and (A)(ii), respectively, redesignating existing provisions in Subpara. (A)(ii) re exception for project elements of site preparation and demolition as subclause (I) and adding Subpara. (A)(ii)(II) re exception for project elements of site preparation, demolition, public utility installation and connections and building envelope components, new Subpara. (B) re conditions for beginning construction prior to the determination of maximum guaranteed price for specific project elements and Subpara. (C) re renovation of existing buildings in multiple phases, effective June 12, 2023, and amended Subsec. (c)(10) by replacing contract amount over which design-builders need to be prequalified from $500,000 to an amount set forth in Sec. 4b-91(a)(2), effective October 1, 2023; P.A. 24-151 amended Subsec. (a) to replace “June 30, 2027” with “June 30, 2031”, effective July 1, 2024.