California Statutes
§ 21568.1. — 21568.1. (Added by Stats. 2022, Ch. 275, Sec. 2.)
California·Code PCC Public Contract Code - PCC·Div. 2. DIVISION 2. GENERAL PROVISIONS·Part 3. PART 3. CONTRACTING BY LOCAL AGENCIES·Ch. 1.5. CHAPTER 1.5. Water District Acts·Art. 121.1. ARTICLE 121.1. Metropolitan Water District of Southern California-Alternative Project Delivery Program
(a)Upon approval by its governing body, the Metropolitan Water District of Southern California may use, in addition to other methods of project delivery otherwise allowable by law, the following methods of project delivery for a regional recycled water project or other water infrastructure project undertaken by the district to alleviate water supply shortages attributable to drought or climate change:
(1)Design-build.
(2)Progressive design-build.
(3)Construction Manager/General Contractor method.
(b)
(1)A design-build contract shall be awarded pursuant to Chapter 4 (commencing with Section 22160).
(2)A progressive design-build contract or a Construction Manager/General Contractor method contract shall be awarded on a best value or qualifications basis or to the lowest responsible bid
Free access — add to your briefcase to read the full text and ask questions with AI
California § 21568.1. (21568.1. (Added by Stats. 2022, Ch. 275, Sec. 2.)) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
Added by Stats. 2022, Ch. 275, Sec. 2. (AB 1845) Effective January 1, 2023.