This text of 59 F. Supp. 2d 384 (Whitlock Packaging Corp. v. Precision Diversified Systems, Inc.) is published on Counsel Stack Legal Research, covering District Court, D. New Jersey primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Whitlock Packaging Corp. v. Precision Diversified Systems, Inc., 59 F. Supp. 2d 384, 1998 U.S. Dist. LEXIS 22528, 1998 WL 1100176 (D.N.J. 1998).

Opinion

OPINION

CHESLER, United States Magistrate Judge.

I. INTRODUCTION

This matter comes before the Court on the motion of Defendant, Precision Diversified Systems, Inc. (“Defendant” or “PDS”), to confirm an arbitration award and for the entry of judgment or, in the alternative, for summary judgment and dismissal of Plaintiffs complaint, and on the cross-motion of Plaintiff, Whitlock Packaging Corp. (“Plaintiff’ or “Whit-lock”), to confirm the arbitration award (pleaded as a cross-motion for summary judgment on liability) and for the scheduling of a trial on damages. The parties consented to having the matter resolved by the undersigned, see 28 U.S.C. § 636(c), and an Order of Reference was entered by the Honorable Harold A. Aekermanj U.S.D.J., on April 23, 1998. 1 Oral argument was heard on June 22,1998. For the reasons set forth below, Defendant’s motion to confirm the arbitration award will be denied, Defendant’s alternative motion for summary judgment will be granted so far as it deals with damages, Plaintiffs cross-motion to confirm the arbitration award will be granted, and Plaintiffs cross-motion for the scheduling of a trial on damages will be denied.

II. BACKGROUND

Plaintiff, Whitlock Packaging Corp. (“Plaintiff’ or “Whitlock”), is the owner and operator of a large beverage blending and packaging plant located in Wharton, New Jersey. Defendant, Precision Diversified Systems, Inc. (“Defendant” or “PDS”), is the manufacturer of a piece of *387 equipment known as beverage cooling tunnels (“Tunnel” or “Tunnels”). A Tunnel is an important link in the production line because it must quickly cool freshly Med cans containing hot beverages as the cans pass through the Tunnel on specially designed conveyor belts. See Alexander Dep. ¶. Once the cans are filled with hot beverages and cooled in the Tunnel, they continue down the production line where they are labeled and packaged for shipping. Id. at ¶ 3. Without proper cooling, the entire production line will be slowed or halted completely. Id. at ¶ 4.

In late 1995, Plaintiff and Defendant began discussions regarding Plaintiffs need for a Tunnel at their Wharton, New Jersey facility. Id. at ¶ 3. In late 1995 and early 1996, Defendant entered into two contracts with Plaintiff to manufacture two separate special pieces of equipment for Plaintiff known as airmist coolers. See Ware Aff. ¶ 2. Both orders were verbal but were subject to Defendant’s standard purchase order terms and conditions that were submitted to Plaintiff. See Defendant’s Statement of Undisputed Facts at ¶ 2 [hereinafter “Defendant’s Statement”]. Plaintiff provided Defendant with pertinent specifications of performance that the cooling Tunnels had to meet or exceed. See Plaintiffs Statement of Undisputed Facts at ¶ 3 [hereinafter “Plaintiffs Statement”]. Defendant advised Plaintiff that it could design and manufacture a Tunnel that would meet or exceed the required specifications for a sixty foot Tunnel that could process forty-six ounce cans at the rate of 360 per minute. Id.

Defendant designed and constructed the Tunnel which was then installed at Plaintiffs facility in Wharton, New Jersey. See Ware Aff. at ¶ 2. Plaintiff paid for the first piece of equipment in full and left a balance of $90,000 due on the second piece of equipment. See Defendant’s Statement at ¶ 3. After installation, the Tunnel was placed in operation and failed to perform according to the specifications because it could not cool the requisite amount of cans per minute. See Plaintiffs Statement at ¶ 5. Additionally, the Tunnel was continually out of service and required substantial repairs. Id. Some of the machine’s failures included broken tail shafts, broken sprockets on the drive shaft and tail shaft, stoppage due to motor over-current, a high level of chain wear and damage, broken bearing mount, and a cracked structural member at the drive shaft. Id. The down time of the Tunnel allegedly caused a halt to Plaintiffs production process on numerous occasions. Id.

Plaintiff concluded that the Tunnel’s fail- * ure was caused by the manner in which Defendant designed and constructed the equipment. Id. at ¶ 6. Defendant strongly disagreed with this conclusion and claimed that Plaintiff had misused the Tunnel by allowing or causing excessive calcium build-up in the Tunnel. Id. at ¶ 7. In order to facilitate a resolution to the controversy, the parties agreed to allow the independent engineering company of Luciano Packaging Technologies, Inc., of Som-erville, New Jersey (“Luciano”), to act as a third party inspector and to review the cause of the Tunnel’s failure. Id. at ¶ 8. Specifically, Howard R. Leary, Vice President of Applied Engineering at Luciano (“Leary”), was to determine if the cause of the Tunnel’s failures was a result of design and structural integrity and quality of materials that Defendant used or a result of increasing friction on the machine due to Plaintiffs chemically, induced scale buildup by water treatment biocide chemicals. Id.

Plaintiff and Defendant agreed that if Leary’s determination of the cause of the failures is favorable to Defendant, Plaintiff would pay an additional $30,000 towards final settlement of the second Tunnel and would reimburse Defendant for the performance bond cost. Id. at ¶ 9. Plaintiffs president, and the third-party defendant in this case, Jerry Whitlock, personally guaranteed the payment of $30,000 in the event Leary’s decision favored Defendant. Id. ¶10.

*388 If Luciano upheld Plaintiffs position, however, Defendant would have to perform all necessary repairs on Tunnel One (estimated to be about $15,000) and Plaintiff would not be required to make any further payments towards the purchase of Tunnel Two the $60,000 initial payment satisfied the entire purchase price for the Tunnel and Defendant would be required to bear the cost of the performance bond). Id. at ¶ 9. Defendant also agreed that its president, Gerald Ware, would personally go to Plaintiffs facility within ten days of Leary’s report to schedule a date for the necessary repairs. Id. at ¶ 10. Additionally, Defendant agreed that the repairs would be completed within three days of the repair date. Id.

Leary issued his letter report on February 17, 1997, in which he concluded that the Tunnel “appear[ed] to be operating at its limits of strength and power” which allegedly was below the specification of running 360 forty-six ounce cans through per minute. Id. at ¶ 12. The report suggested reducing the load on the Tunnel by cutting down on the amount of product on the conveyor belt. Id. The report also suggested that “wear strips” be installed on the Tunnel in order to support the return run of the chain thereby reducing the chain’s tension. Id.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Kimm v. BLISSET, LLC
905 A.2d 887 (New Jersey Superior Court App Division, 2006)
S.C. v. Deptford Township Board of Education
248 F. Supp. 2d 368 (D. New Jersey, 2003)

Cite This Page — Counsel Stack

Bluebook (online)
59 F. Supp. 2d 384, 1998 U.S. Dist. LEXIS 22528, 1998 WL 1100176, Counsel Stack Legal Research, https://law.counselstack.com/opinion/whitlock-packaging-corp-v-precision-diversified-systems-inc-njd-1998.