Westinghouse Electric Corporation, Cross-Appellants v. M/v "Leslie Lykes", Etc., Lykes Bros. Steamship Co., Inc., Cross-Appellee

734 F.2d 199, 1985 A.M.C. 247, 1984 U.S. App. LEXIS 21534
CourtCourt of Appeals for the Fifth Circuit
DecidedJune 14, 1984
Docket82-3128
StatusPublished
Cited by20 cases

This text of 734 F.2d 199 (Westinghouse Electric Corporation, Cross-Appellants v. M/v "Leslie Lykes", Etc., Lykes Bros. Steamship Co., Inc., Cross-Appellee) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fifth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Westinghouse Electric Corporation, Cross-Appellants v. M/v "Leslie Lykes", Etc., Lykes Bros. Steamship Co., Inc., Cross-Appellee, 734 F.2d 199, 1985 A.M.C. 247, 1984 U.S. App. LEXIS 21534 (5th Cir. 1984).

Opinion

JOHN R. BROWN, Circuit Judge:

This is a suit by a shipper of cargo against an ocean carrier for damage to cargo resulting from a fire aboard ship. One issue concerns the effect of an unseaworthy condition on the burden of proof in a carrier’s defense under the Fire Statute, 46 U.S.C. § 182, which requires that the fire be caused by the “design or neglect” of the owner, and under the Carriage of Goods By Sea Act, 46 U.S.C. § 1304(2)(b). After a traditional bench trial, the District Court held that the carrier was not entitled to the exoneration provided by the Fire Statute, because it found the fire to have been “attributable to the management level of Lykes.” Because the District Court’s factfinding was influenced by a view of the Fire Statute that we reject, and its findings did not center on the essential element that the fire must have been caused by the *202 “design or neglect” of the shipowner, we reverse the decree in favor of Cargo. We also reject Cargo’s purported cross-appeal of the trial court’s conclusion that the Master’s decisions in fighting the fire were not attributable to the owner under the Fire Statute.

Facts and Decision Below

In August of 1976, Westinghouse Electric Corp. (Cargo) shipped several large electric rotors aboard the SS LESLIE LYKES (LESLIE) owned by Lykes Brothers Steamship Co., Inc. (Carrier). The LESLIE was an ocean-going steamship used to transport break-bulk or general cargo.

The LESLIE contains six cargo holds. The No. 3 hold is divided into three horizonal compartments. The bottom compartment is the lower hold, also referred to as the dry cargo hold. Above the lower hold is the lower tween deck (LTD), in which the fire occurred. The top compartment is the upper tween deck, which is immediately below the main deck or weather deck. Each deck has a MacGregor hatch cover, which opens in accordion fashion, consisting of panels attached by hinges, positioned on rollers. The hatch covers are activated hydraulically.

The No. 2 hold, which is immediately forward of No. 3 hold, has the same overall structure as No. 3. Both No. 2 and No. 3 contained a vertical ladder running the depth of the ship. At each level or compartment was a manhole for entry into the next deck via the ladder. One purpose of these accessways was to allow the crew to take periodic cheeks to confirm the security of the cargo. The accessway manhole in the No. 3 hold was at the forward bulkhead between No. 3 and No. 2 holds. The accessway in the No. 2 was aft, also at the bulkhead between No. 3 and No. 2 holds. The entrance to No. 3 manhole is at the top of the motor/generator house located on the weatherdeck.

The No. 4 hold was situated immediately aft No. 3 hold. Unlike holds No. 2 and No. 3, hold No. 4 was divided into three vertical compartments so that containers could be stowed within the hold. The vertical divisions ran fore and aft. The accessway in No. 4 was located at the forward bulkhead between the No. 4 and No. 3 holds.

On the voyage in question (Voyage 64), two Westinghouse rotors were being shipped in separate containers in No. 4 hold. In addition to this cargo, bags of flour were stowed in open spaces in No. 4 hold.

Among the cargo stowed in the No. 3 LTD were bales of cotton. Cotton is flammable and, if ignited, is very difficult to extinguish. Baled cotton can smolder indefinitely, even under water, because there is a source of oxygen within the cotton fibers themselves. Between the starboard bulkhead and the cotton was a stow of drill pipe running fore and aft. The pipe stow was secured properly by chains, which were tightened by turnbuckles.

The LESLIE sailed from her last port of call (Charleston, South Carolina) on the evening of August 27, 1976. On August 29th, the vessel encountered rough weather, the seas rolling heavily due to the fact that the vessel was sailing on the edge of a hurricane. Though the weather was rough, it was not unusual or unexpectable.

At 2315- hours on August 31, 1976, a clanking noise was heard by members of the crew, which they believed at the time had come from the No. 4 hold. No attempt was made by the crew to investigate the clanking sound at that time, even though there was access into No. 4. At the time the noise was heard, the vessel was still sailing in rough seas.

At 1212 hours on the following day, roughly twelve and one-half hours after the clanking was heard, smoke was observed from the bridge by Captain Metcalf, master of the vessel, coming from the king-post forward of the No. 3 hold. The smoke detector system indicated that a fire was in the No. 3 LTD. Although an access way was provided in No. 3 hold, access could not be obtained into No. 3 LTD because *203 bags of flour had been stowed over the manhole cover in No. 3 upper tween deck.

A thermometer was placed in the No. 4 hold at the hottest spot on the bulkhead between No. 4 and No. 3, in order to monitor the temperature and status of the fire. The thermometer placed at the starboard side of the forward bulkhead of No. 4 hold originally indicated a temperature of 130 degrees. The bulkhead temperatures indicated that the fire was in the vicinity of the starboard aft section of No. 3 LTD, where the cotton and drill pipes had been stowed.

The vessel was equipped with a C02 injection system in each hold. Therefore, the weatherdeck hatch of the No. 3 hold was sealed with tape to prevent as much as possible the leakage of C02. Also, the blowers of the vessel’s ventilator system were shut off and taped to avoid providing the fire any ventilation.

Captain Metcalf ordered the release of 24 bottles of C02 into No. 3 LTD, in accordance with the directions provided by the manufacturer of the C02 system. Pursuant to those instructions, the crew continued to introduce C02 into No. 3 LTD until the vessel arrived at El Ferrol, Spain, at which time the thermometer that had been placed on the bulkhead indicated the temperature had dropped to 110 degrees.

Soon after the introduction of C02, the smoke abated, as indicated by the smoke detector. Neither the smoke detector nor the kingpost ventilator revealed any indication of smoke from September 1st until the opening of the No. 3 weatherdeck hatch at El Ferrol on September 8.

The vessel had left Charleston with 72 full cannisters of C02. By the time it reached El Ferrol, only 2 cannisters remained full. Due to the concern that the supply of C02 might run low, steam was introduced into No. 3 LTD, in addition to the insertion of C02 into the compartment. This was accomplished by drilling five Vito %-inch holes in the bulkhead of No. 4 hold just above the location of the stow of drilling pipes located in No. 3 LTD. Steam lances were inserted into the holes.

While at sea, Captain Metcalf discussed the events taking place with Lykes’ managing personnel at New Orleans by radiotelephone each day, from the time fire was first detected. He considered and followed some suggestions for fighting the fire made by Lykes’ vice-president in charge of maintenance and repair, Joseph Bernstein.

Mr.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Fain v. Crouch
S.D. West Virginia, 2022
Commercial Metals Co. v. M/V LINDOS
390 F. Supp. 2d 571 (S.D. Texas, 2005)
Ambraco, Inc. v. Project Europa MV
119 F. App'x 676 (Fifth Circuit, 2005)
United States v. Ocean Bulk Ships, Inc.
248 F.3d 331 (Fifth Circuit, 2001)
Hale Container Line, Inc. v. Houston Sea Packing Co.
137 F.3d 1455 (Eleventh Circuit, 1998)
Hale Container v. Houston Sea
137 F.3d 1455 (Eleventh Circuit, 1998)
Banana Services, Inc. v. M/V Tasman Star
68 F.3d 418 (Eleventh Circuit, 1995)
Damodar Bulk Carriers, Ltd. v. Damodar Tanabe
903 F.2d 675 (Ninth Circuit, 1990)
Klingler v. Yamaha Motor Corp., U.S.A.
738 F. Supp. 898 (E.D. Pennsylvania, 1990)
Sigri Carbon Corp. v. Lykes Bros. Steamship Co.
655 F. Supp. 1435 (W.D. Kentucky, 1987)
Union Oil Company Of California v. M/V Point Dover
756 F.2d 1223 (Fifth Circuit, 1985)
Union Oil Co. v. M/V Point Dover
756 F.2d 1223 (Fifth Circuit, 1985)

Cite This Page — Counsel Stack

Bluebook (online)
734 F.2d 199, 1985 A.M.C. 247, 1984 U.S. App. LEXIS 21534, Counsel Stack Legal Research, https://law.counselstack.com/opinion/westinghouse-electric-corporation-cross-appellants-v-mv-leslie-lykes-ca5-1984.