This text of 216 A.D. 603 (West Shore Railroad v. State) is published on Counsel Stack Legal Research, covering Appellate Division of the Supreme Court of the State of New York primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
West Shore Railroad v. State, 216 A.D. 603, 215 N.Y.S. 684, 1926 N.Y. App. Div. LEXIS 9283 (N.Y. Ct. App. 1926).

Opinion

Clark, J.

Claimant, the West Shore Railroad Company, owns, and the New York Central Railroad Company, as lessee of the West Shore Railroad Company, is in possession of, a two-track steel girder bridge, which crosses Seneca river near Montezuma, practically at right angles. Claimants own the fee of the entire river bed and the adjacent uplands at the site of said crossing. [604]*604This bridge is a long one resting on twenty piers about fifty-four feet apart. Some years after the bridge was constructed the westerly half Was filled in and made into a solid embankment, leaving the rest of the bridge with fourteen girder spans each some thirty feet long resting on concrete piers being supported on piles without timber grillages.

Seneca river has no tide, is wholly within the State of New York, and formerly passed in a northerly direction in the vicinity of the location of claimants’ bridge in three different channels, one of which was a dredged channel.

Prior to the passage of the Barge Canal Act in 1903 (Chap. 147), Seneca river was not a portion of the canal system of the State. When the State entered upon its Barge canal construction in the vicinity of claimants’ said bridge, the canal at that point was located in a new channel, constructed by the State on higher ground some 400 feet east of the bridge and wholly outside any of the channels of Seneca river, the new channel extending from a point some 3,000 feet south of the bridge, and striking the river again two miles north of the bridge. This new channel was cut through lands of claimants appropriated by the State and has been paid for. Following the cutting of this new channel waters of the river were diverted through it with the result that the waters of the river as it passed under the bridge were permanently lowered from three to four feet, thus exposing the timber grillages and tops of piles to the air, and they decayed to such an extent that in 1920 claimants were obliged to .replace them at an expense of $26,357.57.

Claimants demand compensation as for an appropriation for the permanent lowering and diverting the waters of Seneca river, the destruction of two of the piers of the bridge, and damages to the other piers and grillages, and for the estimated cost of relocating and reconstructing of the foundations, piers, etc.

The Court of Claims dismissed the claim, holding that the State did not divert the waters of the river, but merely lowered the level; that it had not appropriated said waters, and that whatever it did in the premises was necessary for the development of the canal enterprise and was done under legislative authority and without trespass or negligence, and that any damages not already paid for under their settlement agreement of August 11, 1911, were consequential damages for which the law can afford claimants no remedy.

The Court of Claims found that the waters of Seneca river at this location have been permanently lowered below their prior, natural and usual elevation by reason of the construction, maintenance and operation of the Barge canal, and that since the construction of said canal the elevation of the water in Seneca river [605]*605and the flow thereof in the vicinity of claimants’ bridge has been and is controlled by the Barge canal. The court also found that since the construction of the canal the water table has been below the level of the tops of the grillages east of the dredged channel for a considerable time and has alternately risen above and fallen below the level of the tops of the piles west of the dredged channel. The court also found that so long as. the river flowed in its natural condition without any changes arising from the acts of the State in connection with its Barge canal operations, the piles and timber grillages supporting the substructure of claimants’ bridge remained as originally constructed, but that since the Barge canal construction the tops of the piles and the grillages supporting the piers and abutments of the bridge have been and are exposed to conditions alternately wet and dry and that the damage to the grillages at piers 17 and 18 of the bridge, which required their reconstruction in 1920, was caused by work in connection with the Barge canal construction, but such damage was consequential in its nature resulting from a public work in the public interests and in pursuance of legislative authority and without negligence or trespass on lands of claimants, and that there can be no recovery.

There is no dispute about the fact that the State appropriated a portion of claimants’ right of way for the new Barge canal channel and that before the new channel was dug the West Shore railroad crossed these lands so appropriated on an earth embankment, and that it was necessary to construct a bridge in place thereof to carry the tracks over the newly-constructed channel. This bridge was constructed and the State paid for it, and now claims that it was a settlement of all damages resulting from the Barge canal construction at this point.

This is a fallacy, as will be shown by the maps filed showing what was appropriated for the new channel, and what the settlement agreement shows on its face was included therein.

The land appropriated according to the maps filed was 1.491 acres upon which there is an earth embankment,” and it says it covers merely lands, buildings and other structures, but there is no express appropriation of waters.. The river did not flow on this appropriated parcel of land, and there was high land between that parcel and the east end of the West Shore railroad bridge.

The settlement agreement provided, among other things, for a bridge “ carrying said railroad tracks over said canal,” and claimants undertook to erect and maintain such bridge. They also undertook to construct suitable false work for carrying the tracks over the canal with an opening forty-five feet wide for the passage of the contractor’s dredge.

[606]*606The amount of damages paid by the State under that agreement included items for building the bridge and approaches and false work, and for raising the bridge W. 467 (which is the bridge claimed to be damaged), engineering supervision, maintenance and renewals. These items as specified in the settlement clearly had reference to the new bridge which was to be constructed over the new canal channel on the appropriated land, and had no reference to the old bridge W. 467. This idea is strengthened by the fact that in the settlement agreement it was specified what was intended to be included in the settlement, and so far as the old bridge is concerned nothing was included and nothing was within the contemplation of the parties except the estimated cost of raising bridge W. 467, $37,016.80.” If it had been the intention of the parties to include in the settlement all damages that might be caused to the old bridge and all damages of every kind that might be due to the permanent lowering the waters of the river, it is reasonable to conclude that it would have been so specified in the agreement, as it was with reference to raising the old bridge.

The State when it appropriated the high land of claimants some distance east of the east end of the old bridge for the new canal channel, did not appropriate the right to lower the waters of the river or disturb them.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Fulton L., H. P. Co. v. . State of N.Y.
94 N.E. 199 (New York Court of Appeals, 1911)
Hinkley v. . State of New York
137 N.E. 599 (New York Court of Appeals, 1922)
American Woolen Co. v. State
195 A.D. 698 (Appellate Division of the Supreme Court of New York, 1921)
Hinkley v. State
202 A.D. 570 (Appellate Division of the Supreme Court of New York, 1922)
Weismantle v. State
210 A.D. 608 (Appellate Division of the Supreme Court of New York, 1924)
Standen v. New Rochelle Water Co.
36 N.Y.S. 92 (New York Supreme Court, 1895)
Comm'rs of Canal Fund v. Kempshall
26 Wend. 404 (New York Supreme Court, 1841)

Cite This Page — Counsel Stack

Bluebook (online)
216 A.D. 603, 215 N.Y.S. 684, 1926 N.Y. App. Div. LEXIS 9283, Counsel Stack Legal Research, https://law.counselstack.com/opinion/west-shore-railroad-v-state-nyappdiv-1926.