VL8 Pool, Inc. v. Glencore Ltd.

CourtDistrict Court, S.D. New York
DecidedMarch 25, 2021
Docket1:20-cv-02053
StatusUnknown

This text of VL8 Pool, Inc. v. Glencore Ltd. (VL8 Pool, Inc. v. Glencore Ltd.) is published on Counsel Stack Legal Research, covering District Court, S.D. New York primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
VL8 Pool, Inc. v. Glencore Ltd., (S.D.N.Y. 2021).

Opinion

USDC SDNY DOCUMENT UNITED STATES DISTRICT COURT ELECTRONICALLY FILED SOUTHERN DISTRICT OF NEW YORK DOCH DATE FILED: _ 3/25/2 VL8 POOL, INC., Plaintiff, 1:20-cv-02053 (ALC) -against- OPINION & ORDER GLENCORE LIMITED, Defendant. ANDREW L. CARTER, JR., United States District Judge: The Court now considers a Motion by Defendant Glencore Limited (“Glencore’’) to dismiss the Complaint of Plaintiff VL8 Pool, Inc. (‘VL8”) pursuant to Rule 12(b)(6) of the Federal Rules of Civil Procedure. For the reasons that follow, the Motion is GRANTED. VL8 is also GRANTED leave to amend the Complaint.

Background

This matter arises from a contractual relationship between VL8 and Glencore. At the time relevant to the Complaint, VL8 time chartered a vessel, M/V NAVE PHOTON (Official No. 9371608) (the “Vessel’”), from non-party Delos Shipping Corp.

Glencore is and was a seller and supplier of marine fuel with operations worldwide, and specifically in Texas. During the period of January 1, 2018, through May 31, 2018, Glencore procured marine fuel from Valero Marketing and Supply Company (“Valero”) for sale, delivery, and distribution in the Texas and U.S. Gulf of Mexico region.

VL8 ordered marine fuel through non-party Integr8 Fuels, Inc., which arranged the fueling of the Vessel with Glencore. Though Glencore and VL8 did not have direct contact, VL8 alleges that ““Glencore was aware that the beneficiary of the marine fuel being sold was VL8 and

the Vessel.” Compl. ¶ 22. Specifically, VL8 alleges that an order confirmation dated March 14, 2018 (the “Order Confirmation”) identifies the Vessel as the end user of the marine fuel and that Glencore arranged for the delivery of the marine fuel to the Vessel.

The Order Confirmation incorporated Glencore’s General Terms and Conditions dated December 2015 (the “GT&Cs”, ECF No. 1-3). Certain provisions of the GT&Cs related to Glencore’s liability are here relevant. Section 7(a) of the GT&Cs provides, in relevant part: “[Glencore’s] obligations or liabilities hereunder shall not include any consequential or indirect damages, including without limitation, deviation costs, demurrage, damage to any Vessels or Buyer’s Delivery Vessels or to their engines or tanks, and any actual or prospective loss of profits . . . .” ECF No. 1-3 § 7(a). Section 7(c) of the GT&Cs requires that “[a]ny claim as to the quality of the Marine Fuels delivered” must be sent to Glencore “within thirty (30) days after the

date of delivery, failing which, such claim shall be deemed waived and absolutely barred.” Id. § 7(c). On or about March 11, 2018, marine fuel was delivered to the Vessel at the Galveston Offshore Lightering Area (“GOLA”), Texas with a Delivery Receipt (the “Delivery Receipt”). In total, the Vessel took on approximately 120 metric tons of marine gasoil and 4,700 metric tons of HSFO originally manufactured, produced, and/or sold into the market by Valero (the

“Bunkers”).The Vessel did not immediately begin using the Bunkers after they were delivered. On or about April 4, 2018, while in the Indian Ocean en route to Zhoushan, China, the Vessel began using the Bunkers. Almost immediately upon switching over to the Bunkers the Vessel began experiencing serious operational issues. In particular, while using the Bunkers the Vessel’s fuel filters became covered with a sticky substance. The Vessel was forced to shut down its main propulsion and auxiliary engines several times to clear its fuel filters. When running, the Vessel was forced to run at reduced speeds due to the constant coating and clogging of the fuel filters. Furthermore, while using the Bunkers, the fuel pumps and injectors on the Vessel’s main and auxiliary engines clogged and fouled and had to be replaced.

The operational issues onboard the Vessel caused by the Bunkers persisted and became so severe that the Vessel experienced an engine breakdown in the Indian Ocean several days from any port of refuge. As a result of this engineering breakdown, the Vessel was forced to arrange for salvage services to be towed into port. Additionally, VL8 was forced to place the Vessel “off-hire” periodically between April 9 and May 2, 2018, due to the operational issues caused by the use of the Bunkers. The vessel also deviated to Colombo, Sri Lanka, to take on fresh marine fuel because the Bunkers were not safe to use, which fuel was more expensive. The

Vessel also suffered physical damage to its fuel tanks, piping, fuel system, and to its engines and engine components. Plaintiff had initially tested the Bunkers to see if they were on specification. However, after the operational problems Plaintiff conducted further testing. The further testing ordered by Plaintiff revealed that the Bunkers contained the presence of various fatty acids and other materials which are not normally found in marine fuels. It also revealed that the Bunkers did not

meet industry-wide specification or the basic international standard for marine fuel. VL8 alleges that from January 1, 2018 to May 31, 2018, non-party Valero directly or indirectly sold, supplied, and delivered thousands of metric tons of marine fuel which were contaminated, off-spec, unfit for consumption and capable of causing serious physical damage to main propulsion engines, auxiliary engines, and other equipment of vessels consuming such fuel. VL8 further alleges that “Glencore, despite having actual knowledge that the marine fuel product manufactured by Valero that it sold into the market from January 1, 2018, through May 31, 2018, was defective, off-spec, and dangerous to use by vessels, never notified or warned its customers or the end users of its marine fuel products of the known defects in said products.” Compl. ¶ 19.

Based on the foregoing allegations, VL8 brings claims for Breach of Contract and Breach of Warranty (Count I), Negligence (Count II), Product Liability (Count III), and Indemnity and Contribution (Count IV). On August 10, 2020, Glencore moved to dismiss the Complaint. On August 24, 2020, VL8 opposed the Motion to Dismiss. On August 31, 2020, Glencore filed a reply in further support of the Motion to Dismiss.

Standard of Review When considering a motion to dismiss under Federal Rules of Civil Procedure 12(b)(6), a court should “draw all reasonable inferences in [the plaintiff’s] favor, assume all well-pleaded factual allegations to be true, and determine whether they plausibly give rise to an entitlement to relief.” Faber v. Metro. Life Ins. Co., 648 F.3d 98, 104 (2d Cir. 2011) (internal quotation marks omitted). Thus, “[t]o survive a motion to dismiss, a complaint must contain sufficient factual matter, accepted as true, to ‘state a claim to relief that is plausible on its face.’ “ Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009) (quoting Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007)).

A court’s function on a motion to dismiss is “not to weigh the evidence that might be presented at a trial but merely to determine whether the complaint itself is legally sufficient.” Goldman v. Belden, 754 F.2d 1059, 1067 (2d Cir. 1985). The Court should not dismiss the complaint if the plaintiff has stated “enough facts to state a claim to relief that is plausible on its face.” Twombly, 550 U.S. at 570.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

IMTT-Gretna v. Robert E. Lee SS
993 F.2d 1193 (Fifth Circuit, 1993)
Pemeno Shipping Co. v. Louis Dreyfus Corp.
238 F. App'x 6 (Fifth Circuit, 2007)
Robins Dry Dock & Repair Co. v. Flint
275 U.S. 303 (Supreme Court, 1927)
Bell Atlantic Corp. v. Twombly
550 U.S. 544 (Supreme Court, 2007)
Ashcroft v. Iqbal
556 U.S. 662 (Supreme Court, 2009)
G & G Steel, Inc. v. Sea Wolf Marine Transportation, LLC
380 F. App'x 103 (Second Circuit, 2010)
Faber v. Metropolitan Life Insurance
648 F.3d 98 (Second Circuit, 2011)
American Dredging Co. v. Plaza Petroleum Inc.
799 F. Supp. 1335 (E.D. New York, 1992)
American Dredging Co. v. Plaza Petroleum Inc.
845 F. Supp. 91 (E.D. New York, 1993)
Plaza Marine, Inc. v. Exxon Corp.
814 F. Supp. 334 (S.D. New York, 1993)
Kalisch-Jarcho, Inc. v. City of New York
448 N.E.2d 413 (New York Court of Appeals, 1983)
Appliance Giant, Inc. v. Columbia 90 Associates, LLC
8 A.D.3d 932 (Appellate Division of the Supreme Court of New York, 2004)
Preston v. Frantz
11 F.3d 357 (Second Circuit, 1993)
Goldman v. Belden
754 F.2d 1059 (Second Circuit, 1985)

Cite This Page — Counsel Stack

Bluebook (online)
VL8 Pool, Inc. v. Glencore Ltd., Counsel Stack Legal Research, https://law.counselstack.com/opinion/vl8-pool-inc-v-glencore-ltd-nysd-2021.