Villages of Eden & Hazelton v. Idaho Board of Highway Directors

367 P.2d 294, 83 Idaho 554, 1961 Ida. LEXIS 222
CourtIdaho Supreme Court
DecidedDecember 1, 1961
Docket9006
StatusPublished
Cited by11 cases

This text of 367 P.2d 294 (Villages of Eden & Hazelton v. Idaho Board of Highway Directors) is published on Counsel Stack Legal Research, covering Idaho Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Villages of Eden & Hazelton v. Idaho Board of Highway Directors, 367 P.2d 294, 83 Idaho 554, 1961 Ida. LEXIS 222 (Idaho 1961).

Opinions

SMITH, Justice.

Appellant is herein sometimes referred to as the State Highway Department, also as the Board.

This appeal involves the validity of a determination by appellant of the location in Jerome County, of approximately 24.8 miles of the proposed federal-aid Interstate Highway 80-N, a four lane limited access freeway. Such portion of Highway 80-N is herein sometimes referred to as the Interstate.

Appellant, in cooperation with U. S. Bureau of Public Roads, after considering ten alternate routes for this portion of the highway, deemed three as worthy of [557]*557more detailed analyses. Subsequently, during 1958, appellant’s planning and traffic division prepared an analysis designed to evaluate the advantages and disadvantages of the three proposed routes.

The plans of the proposed routes are designated “A,” “B” and “C,” respectively. All show identical easterly and westerly termini, i. e., on the west, near the junction of the proposed Interstate with U. S. Highway 95 some seven miles north of Twin Falls, and on the east, on State Highway 25 approximately one and a half miles west of the Jerome-Minidoka county line. Plan “A” would traverse six miles of desert land and 18.8 miles of rolling farm land; Plan “B,” six miles of desert land and 19.1 miles of rolling farm land, and Plan “C,” 19.4 miles of desert land and five miles of irrigated farm land.

Plan “A” proposes a route to extend from the west terminus southeasterly to a point near State Highway 50 where a proposed interchange would provide access to Twin Falls by way of Hansen Bridge. It then would continue due east past a point two miles south of the respondent Village of Eden, to the east terminus.

Plan “B” proposes a route coinciding with Plan “A”, extending from the west terminus to the proposed State Highway 50 interchange; at that point it would extend southeast to a point one-half mile south of the Plan “A” route; then would coni inue due east for 13 miles parallel to the Plan “A” route, and then curve one-half mile northeasterly to coincide again with the Plan “A” route to the east terminus.

Plan “C” would coincide with Plans “A” and “B” from the west terminus for approximately one and a half miles, then would extend due east past a point two miles north of Eden and, after crossing the Northside Canal, would extend generally in a southeasterly direction to the east terminus.

Appellant recommended the adoption of Plan “A”, based upon the following factors:

“1. Effect of the proposed route on existing road systems;
“2a. Benefits to the road-user in the form of savings in distance and time;
“b. Cost to the road-user including construction, maintenance, property damage and right-of-way acquisition;
“3. Safety of operation on the road system; and
“4. Economic loss of farm production.”

and listed the following basic data used in measuring those factors:

“1. Origin-destination traffic surveys;
“2. Volume and classification counts;
[558]*558“3. Assigned traffic;
“4. Improvement cost estimates;
“5. Accident records; and
“6. Land use and projected development.”

The “Origin-destination traffic surveys” and “Volume and classification counts” were actual surveys and counts of traffic on the highways. “Assigned traffic” is a projected ■ traffic volume figure computed mathematically on the basis of assumed normal traffic increases. The “Improvement cost estimates” involved a reconnaisance survey, followed by a detailed field inspection to determine the estimated costs of construction. The “Accident records” used were : obtained by applying to traffic figures, previously found through the counts and surveys, certain accident equations to compute the number of accidents that could be anticipated on the alternative facilities. Consideration of “Land use and projected development” was limited to an assessment of the anticipated loss in annual gross farm income, using as a basis an annual crop value per acre in the county as shown by the “1954 Census of Agriculture,” published by the U. S. Department of Commerce. In addition to these factors, appellant’s 1958 route analysis contains a chart intended to show the effect of the Interstate on travel distance and travel time between Magic Valley communities. (“Magic Valley” refers to the area in the general vicinity of Twin Fall's, and the vicinity intended to be traversed by the portion of Highway 80-N involved herein.)

Using this basic data, the route analysis sets out appellant’s major findings, as follows :

“1. Traffic generation in the Magic Valley is mainly local in nature and is centered around Twin Falls and Jerome;
“2. The second major traffic generation in the Magic Valley is also, local in nature and is centered around the Rupert-Burley area;
“3. Through traffic generation completely outside of the Magic Valley is of third importance;
“4. The Eden-Hazelton Section of the Interstate Highway will require three interchanges for access to
“a. Eden,
“b. Hazelton, and
“c. Twin Falls;
“5. Local circulation of traffic in the immediate proximity of the Interstate Highway can be maintained by a system of grade separations and frontage roads * * * ;
“6. Plans ‘A’ and ‘B’ will provide maximum relief for U. S. Highway 30 and State Highway 25;
[559]*559“7. The Interstate Highway will increase the traffic flow on State Highway 50 with each plan; and
“8. A new bridge will be required across the Snake River north of Hansen on the Twin Falls connection to the Interstate under any plan.”

Appellant, in such route analysis, then concludes :

“Plans ‘A’ and ‘B’ have the following advantages over the selection of a route north of Eden (Plan ‘C’):
“1. Increased road-user savings in vehicle operating costs more than offset the additional construction cost and loss of farm production incurred with the alternates south of Eden * * *. Benefits to local traffic in reduced travel time and distances between communities * * *;
“2. Increased road-user safety resulting from a higher traffic transfer from the more hazardous existing highways * * *;
“3. Greater net gain to the economy in the amount of $195,000 per year for Plan ‘A’ * * *. A similar comparison for Plan ‘B’ would result in $149,-000 net gain per year;
“4. Conformance to the criteria established by the U. S. Bureau of Pub-lie Roads for the selection of Interstate Routes, i. e.:
“a ‘connect as directly as possible the maximum number of cities of various population groups;’
“b ‘traverse the most populous band of rural territory;’

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Spencer v. Idaho First National Bank
678 P.2d 108 (Idaho Court of Appeals, 1984)
Smith v. State
473 P.2d 937 (Idaho Supreme Court, 1970)
Reynolds Construction Co. v. County of Twin Falls
437 P.2d 14 (Idaho Supreme Court, 1968)
James v. State
397 P.2d 766 (Idaho Supreme Court, 1964)
Franklin v. State
392 P.2d 552 (Idaho Supreme Court, 1964)
Belts v. State ex rel. Department of Highways
388 P.2d 982 (Idaho Supreme Court, 1964)
Mabe v. State Ex Rel. Rich
385 P.2d 401 (Idaho Supreme Court, 1963)

Cite This Page — Counsel Stack

Bluebook (online)
367 P.2d 294, 83 Idaho 554, 1961 Ida. LEXIS 222, Counsel Stack Legal Research, https://law.counselstack.com/opinion/villages-of-eden-hazelton-v-idaho-board-of-highway-directors-idaho-1961.