United States v. Puerto Rico Indus. Dev. Co.
Opinion
BESOSA, District Judge.
Before the Court are plaintiff United States' and defendant Puerto Rico Industrial Development Company ("PRIDCO")'s cross-motions for summary judgment pursuant to Federal Rule of Civil Procedure 56 (" Rule 56"). (Docket Nos. 142 and 143.) The United States also moves to limit the scope of judicial review. (Docket No. 138.) For the reasons set forth below, the United States' motion for summary judgment is GRANTED IN PART and DENIED IN PART , PRIDCO's motion for summary judgment is DENIED , and the United States' motion to limit the scope of judicial *330review is DENIED WITHOUT PREJUDICE . (Docket Nos. 138, 142 and 143.)
I. Background
This matter concerns contaminated groundwater located on property belonging to PRIDCO in Maunabo, Puerto Rico (hereinafter, the "property").1 The United States asserts that PRIDCO is liable for "all response costs, including enforcement costs, incurred by the [Environmental Protection Agency, ("EPA") ] in connection with the [Maunabo Area Groundwater Contamination Superfund Site]" pursuant to the Comprehensive Environmental Response, Compensation and Liability Act ("CERCLA"),
Congress drafted CERCLA in 1980 to address the release or threatened release of hazardous substances into the environment.2
A. Hazardous Substances Are Located on PRIDCO's Property
PRIDCO is a government instrumentality of the Commonwealth of Puerto Rico, incorporated in 1942 to stimulate the formation of local firms and to attract foreign investment. (Docket No. 11 at p. 2; Docket No. 117, Ex. 3 at p. 2.) To accomplish these ends, PRIDCO maintains an infrastructure development program, and facilities for lease or sale to qualified investors. (Docket No. 117, Ex. 3 at p. 2.) The property, which PRIDCO acquired in 1964, is among these facilities. (Docket No. 117, Ex. 4 at p. 2.)4
*331The Puerto Rico Aqueduct and Sewer Authority ("PRASA") operates four groundwater supply wells in Maunabo, providing water to 14,000 people. (Docket No. 101, Ex. 6 at p. 12.) One of the four PRASA wells is located adjacent to the southern edge of the property (hereinafter, "Maunabo well"). (Docket No. 101, Ex. 14 at p. 17.) Between 2001 and 2004, PRASA detected volatile organic compounds ("VOC"), including trichloroethylene ("TCE") and cis-1, 2-dichloroethene ("cis-1, 2-DCE"), in the public water supply.5 (Docket No. 101, Ex. 3 at p. 23.) TCE and cis-1, 2-DCE are hazardous substances.
The EPA and the Puerto Rico Environmental Quality Board ("EQB") are responsible for the decontamination of the groundwater. (Docket No. 101, Ex. 6 at pp. 12-13.) The EPA confirmed that the groundwater from the Maunabo well is contaminated primarily with cis-1, 2-DCE. Id. at p. 26. After further investigation, the EPA discovered three plumes of contaminated groundwater throughout the Municipality of Maunabo. (Docket No. 101, Ex. 5 at p. 171.) The three plumes are referred to as: (1) cis-1, 2-DCE, (2) PCE, and (3) 1, 1-DCE. (Docket No. 101, Ex. 5 at p. 171.) The cis-1, 2-DCE plume is located below the property, "flow[ing] southwest toward [a] river, but is intercepted by [the Maunabo well]." (Docket No. 101, Ex. 6 at p. 26; Docket No. 101, Ex. 3 at p. 14.) The PCE plume is located south of the PRIDCO property near a former sugar mill. (Docket No. 101, Ex. 4 at p. 18.) The 1, 1-DCE plume is located northwest of the property. (Docket No. 101, Ex. 6 at p. 12.) Together, the three plumes comprise the Maunabo Area Groundwater Contamination Superfund Site (hereinafter, "the site"). (Docket No. 101, Ex. 6 at p. 12.).7 The EPA placed the site on the National Priorities List, a compilation of the most contaminated sites in the United States. Id. at p. 15.8
The EPA issued the Record of Decision ("ROD") in 2012, setting forth the "factual and legal basis for selecting the [applicable] remedy." (Docket No. 139, Ex. 2 at p. 7.)9 The remedy selected by the EPA incorporates air sparging for the cis-1, 2-DCE
*332plume and monitored natural attenuation for the PCE and 1, 1-DCE plumes. (Docket No. 101, Ex. 6 at p. 75.)10
The United States commenced this action on September 23, 2015. (Docket No.
Free access — add to your briefcase to read the full text and ask questions with AI
BESOSA, District Judge.
Before the Court are plaintiff United States' and defendant Puerto Rico Industrial Development Company ("PRIDCO")'s cross-motions for summary judgment pursuant to Federal Rule of Civil Procedure 56 (" Rule 56"). (Docket Nos. 142 and 143.) The United States also moves to limit the scope of judicial review. (Docket No. 138.) For the reasons set forth below, the United States' motion for summary judgment is GRANTED IN PART and DENIED IN PART , PRIDCO's motion for summary judgment is DENIED , and the United States' motion to limit the scope of judicial *330review is DENIED WITHOUT PREJUDICE . (Docket Nos. 138, 142 and 143.)
I. Background
This matter concerns contaminated groundwater located on property belonging to PRIDCO in Maunabo, Puerto Rico (hereinafter, the "property").1 The United States asserts that PRIDCO is liable for "all response costs, including enforcement costs, incurred by the [Environmental Protection Agency, ("EPA") ] in connection with the [Maunabo Area Groundwater Contamination Superfund Site]" pursuant to the Comprehensive Environmental Response, Compensation and Liability Act ("CERCLA"),
Congress drafted CERCLA in 1980 to address the release or threatened release of hazardous substances into the environment.2
A. Hazardous Substances Are Located on PRIDCO's Property
PRIDCO is a government instrumentality of the Commonwealth of Puerto Rico, incorporated in 1942 to stimulate the formation of local firms and to attract foreign investment. (Docket No. 11 at p. 2; Docket No. 117, Ex. 3 at p. 2.) To accomplish these ends, PRIDCO maintains an infrastructure development program, and facilities for lease or sale to qualified investors. (Docket No. 117, Ex. 3 at p. 2.) The property, which PRIDCO acquired in 1964, is among these facilities. (Docket No. 117, Ex. 4 at p. 2.)4
*331The Puerto Rico Aqueduct and Sewer Authority ("PRASA") operates four groundwater supply wells in Maunabo, providing water to 14,000 people. (Docket No. 101, Ex. 6 at p. 12.) One of the four PRASA wells is located adjacent to the southern edge of the property (hereinafter, "Maunabo well"). (Docket No. 101, Ex. 14 at p. 17.) Between 2001 and 2004, PRASA detected volatile organic compounds ("VOC"), including trichloroethylene ("TCE") and cis-1, 2-dichloroethene ("cis-1, 2-DCE"), in the public water supply.5 (Docket No. 101, Ex. 3 at p. 23.) TCE and cis-1, 2-DCE are hazardous substances.
The EPA and the Puerto Rico Environmental Quality Board ("EQB") are responsible for the decontamination of the groundwater. (Docket No. 101, Ex. 6 at pp. 12-13.) The EPA confirmed that the groundwater from the Maunabo well is contaminated primarily with cis-1, 2-DCE. Id. at p. 26. After further investigation, the EPA discovered three plumes of contaminated groundwater throughout the Municipality of Maunabo. (Docket No. 101, Ex. 5 at p. 171.) The three plumes are referred to as: (1) cis-1, 2-DCE, (2) PCE, and (3) 1, 1-DCE. (Docket No. 101, Ex. 5 at p. 171.) The cis-1, 2-DCE plume is located below the property, "flow[ing] southwest toward [a] river, but is intercepted by [the Maunabo well]." (Docket No. 101, Ex. 6 at p. 26; Docket No. 101, Ex. 3 at p. 14.) The PCE plume is located south of the PRIDCO property near a former sugar mill. (Docket No. 101, Ex. 4 at p. 18.) The 1, 1-DCE plume is located northwest of the property. (Docket No. 101, Ex. 6 at p. 12.) Together, the three plumes comprise the Maunabo Area Groundwater Contamination Superfund Site (hereinafter, "the site"). (Docket No. 101, Ex. 6 at p. 12.).7 The EPA placed the site on the National Priorities List, a compilation of the most contaminated sites in the United States. Id. at p. 15.8
The EPA issued the Record of Decision ("ROD") in 2012, setting forth the "factual and legal basis for selecting the [applicable] remedy." (Docket No. 139, Ex. 2 at p. 7.)9 The remedy selected by the EPA incorporates air sparging for the cis-1, 2-DCE
*332plume and monitored natural attenuation for the PCE and 1, 1-DCE plumes. (Docket No. 101, Ex. 6 at p. 75.)10
The United States commenced this action on September 23, 2015. (Docket No. 21.) The Court granted the United States' motion to trifurcate this litigation into a Liability Phase ("Phase I"), a Cost Phase ("Phase II"), and a Contribution Phase ("Phase III"). (Docket No. 85.)
B. Phase I: PRIDCO is Prima Facie Liable for the Release of Hazardous Substances
The United States moved for summary judgment as to liability in Phase I. (Docket No. 101.) PRIDCO opposed summary judgment, emphasizing that "the technical data available to date does not support the proposition [that the property] is the source of contamination." (Docket No. 116 at p. 5.)11 The source of contamination, however, is immaterial to the prima facie liability analysis. See Robertshaw Controls Co. v. Watts Regulator Co.,
II. Standard of Review
A court will grant summary judgment if "there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law." Fed. R. Civ. P. 56(a). "A dispute is genuine if the evidence about the fact is such that a reasonable jury could resolve the point in the favor of the non-moving party. A fact is material if it has the potential of determining the outcome of the litigation." Dunn v. Trs. of Bos. Univ.,
The role of summary judgment is to "pierce the boilerplate of the pleadings and assay the parties' proof in order to determine whether trial is actually required." Tobin v. Fed. Exp. Corp.,
Once a properly supported motion has been presented, the burden shifts to the nonmovant "to demonstrate that a trier of fact reasonably could find in [its] favor." Santiago-Ramos v. Centennial P.R. Wireless Corp.,
When parties file cross-motions for summary judgment, a court must "consider each motion separately, drawing all *334inferences in favor of each non-moving party in turn." AJC Int'l, Inc. v. Triple-S Propiedad,
III. Summary Judgment as to PRIDCO's Affirmative Third-Party Defense is Warranted
The United States moves to foreclose PRIDCO from asserting the third-party defense. Docket No. 142;
A. The Third-Party Defense
The third-party defense provides PRIDCO with a potential reprieve from the strict liability scheme in CERCLA. To invoke this defense, PRIDCO must establish by a preponderance of the evidence that "an act or omission of a third party other than an employee or agent of [PRIDCO], or than one whose act or omission occurs in connection with a contractual relationship" caused the groundwater contamination. U.S.C. § 9607(b)(3).14 CERCLA sets forth two variations of the third-party defense: (1) the innocent landowner defense, and (2) the contiguous property defense. 42 U.S.C. 9607(b)(3) and (q) ; United States v. A & N Cleaners & Launderers,
B. PRIDCO is Not Eligible to Invoke the Third-Party Defense
PRIDCO misconstrues the third-party defense by repeatedly assigning the burden of proof to the United States. (Docket Nos. 143, 153 and 161.) The linchpin of PRIDCO's third-party defense is that the United States "lacks any physical or hard evidence to demonstrate that [PRIDCO's] property is the source of contamination [of] the cis-1, 2-DCE plume." (Docket No. 143 at pp. 9-10.) Pursuant to CERCLA, however, PRIDCO shoulders the burden of proving that acts or omissions of an unrelated third-party were the sole cause of the groundwater contamination.
Moreover, the National Contingency Plan provides that "persons seeking to establish [the third-party defense] must conduct investigations ... to identify conditions indicative of releases or threatened releases."
*336PRIDCO emphasizes that the source of contamination is unknown. (Docket No. 143 at p. 45.) This proposition only underscores that the third-party defense is inapplicable. Contending that the "likely source of contamination is not within the PRIDCO property, but rather, at the upgradient property of Navarro" is insufficient. (Docket No. 153 at p. 2) (emphasis added); Fairchild Indus., 766 F.Supp. at 411 ("The detailed provisions of [ Section 9607(b)(3) ] demonstrate that Congress did not intend there to be a general third-party defense; instead, a party must allege and prove a specific set of facts [among which are]: that the third party was the sole cause of the release; [and] that the third party was not an employee or agent of the defendant."). The third-party defense is triggered only by proving that the sole cause of contamination originated with an unrelated third-party, not that a third-party likely caused or contributed to the contamination.
PRIDCO also maintains that establishing liability without identifying the source of contamination "is not in the spirit of CERCLA." (Docket No. 143 at p. 25.) The Court disagrees. CERCLA is a comprehensive and at times severe statute, holding property owners strictly liable for hazardous substances located on their property. See Consolidation Coal Co. v. Ga. Power Co.,
Holding PRIDCO liable for response costs pertaining to the cleanup of the cis-1, 2-DCE plume is consistent with Congress's intent to promote expeditious remediation at contaminated sites, adequate compensation to public coffers, and the imposition of accountability. See United States v. Davis,
IV. Phase II: The United States Seeks $ 5,398,161.04 in Response Costs
According to the United States, "there is no question of material fact that [it] incurred at least $ 5,398,161.04 through February 28, 2018 in response costs related to the cis-1, 2-DCE plume." (Docket No. 142 at p. 9.) Because PRIDCO is liable for the contaminated groundwater, the United States is entitled to "all costs of removal or remedial action ... not inconsistent with the national contingency plan."
A. National Contingency Plan
The NCP is "essentially the federal government's toxic waste playbook, detailing the steps that government must take to identify, evaluate, and respond to hazardous substances in the environment." Niagara Mohawk Power Corp. v. Chevron U.S.A., Inc.,
The Court presumes that the United States implemented removal and remedial actions that are consistent with the NCP. City of Bangor v. Citizens Communs. Co.,
The removal and remedial actions implemented by the EPA in response to the contaminated groundwater in Maunabo are reviewed pursuant to an arbitrary and capricious standard. Id.; United States v. JG-24, Inc.,
Judicial review of "any issues concerning the adequacy of any response action" is limited to the administrative record.
*339B. Removal and Remedial Costs
Removal and remedial costs are defined liberally, encompassing expenses incurred throughout the course of decontamination efforts. W.R. Grace & Co.-Conn. v. Zotos Int'l, Inc.,
C. Summary Judgment as to Costs is Not Appropriate
Summary judgment as to costs is not warranted for two reasons. First, genuine issues of material fact concerning the final amount of costs are in dispute. Second, the cost assessments presented by the United States are inconsistent. PRIDCO is liable *340for costs that correspond to response actions. The response actions cited by the United States, however, vary with the circumstances.
1. Issues of Material Fact Concerning the Final Amount of Costs are in Dispute
The evidence proffered by the United States bolsters the Court's determination that summary judgment is not proper. In support of its motion for summary judgment, the United States submitted declarations from Wiley Wright ("Wright"), Bill Kime ("Kime"), and Christopher Osborne ("Osborne"). (Docket No. 142, Exs. 9-11.) Wright and Kime are certified public accountants.
The Court concurs with the United States that "affidavits and cost summaries ... in support of summary judgment on the issue of CERCLA cost recovery are admissible and sufficient to establish the amount of these costs." Docket No. 142 at p. 11; see Hardage,
Wright concedes that the "EPA is collecting the work performed documents for five small dollar contracts and two small dollar cooperative agreements, [all of which] will be produced to all parties as soon as they are available." (Docket No. 142, Ex. 9 at p. 7.) PRIDCO is entitled to review the accuracy of these "small" costs, and whether they reflect actions that comport with the NCP. An incomplete record cannot sustain summary judgment disposition, particularly when the amount of costs is subject to exact computation. Union Carbide Corp. v. Thiokol Corp.,
2. The United States Fails to Designate Which Remedial Actions Underlie Recoverable Costs
In its motion for summary judgment and motion to limit the scope of judicial review, the United States takes inconsistent positions regarding the actions for which PRIDCO must pay. (Docket Nos. 138 and 142.)
a. Costs Requested in the Motion for Summary Judgment
In its motion for summary judgment, the United States contends that the "second phase of this litigation addresses the United States' past response costs." (Docket No. 142 at p. 7.) The United States reiterates that CERCLA permits the recovery of "all costs of removal or remedial action."
*341
According to Kime, the Environmental and Natural Resources Division of the Department of Justice incurred $ 529,441.79 in costs associated with this action. (Docket No. 142, Ex. 10 at p. 5.) Osborne set forth the method by which the EPA calculates indirect costs, including expenses that "cannot be accounted for on a site-specific basis but are necessary for both the administration and operation of the Superfund program and for site-specific cleanup efforts." (Docket No. 142, Ex. 11 at p. 4.) Wright asserts that "total unreimbursed Site costs incurred ... through February 28, 2018 are $ 7,497,445.89." (Docket No. 142, Ex. 9 at p. 7.)23 Of this amount, the "EPA's total unreimbursed Site TCE-cis-1, 2-DCE Plumes costs incurred (including prejudgment interest) through February 28, 2018 are $ 5,398,161.04."
b. Costs Requested in the Motion to Limit Judicial Review
The United States moves to limit the scope of judicial review, requesting that "any challenge to the adequacy of the response actions at the Site be evaluated on the basis of the administrative record and that [Konard Banaszak's] expert opinion challenging the EPA's selection of a response action at this Site be precluded based upon statutory and administrative law requirements." (Docket No. 138 at p. 3.)26 Other than Banaszak's expert opinion, the United States makes no mention of the specific documents it seeks to preclude from the administrative record. Essentially, the United States opposes the *342Court's consideration of Banaszak's expert opinion but refrains from proposing records that are eligible for review.
PRIDCO opposed the United States' motion to limit the scope of judicial review, noting that the EPA conducted soil studies on multiple occasions after issuing the Record of Decision in 2012. (Docket No. 148 at pp. 5-7.) Pursuant to the NCP, the administrative record shall include, inter alia , "[d]ocuments containing factual information, data and analysis of the factual information, and data that may form a basis for the selection of a response action."
Despite previous requests to recover "all costs" associated with the cis-1, 2-DCE plume, the United States replied that "in this matter [it] is only seeking its past costs, i.e. , primarily the costs of investigating the contamination, in making the remedy selection, and in conducting enforcement actions, but no costs for implementing the selected remedy ." (Docket No. 159 at p. 1) (emphasis added). The United States purports that PRIDCO's arguments regarding the administrative record "are premature and should be considered only if the United States brings a future action against PRIDCO seeking to require it to implement or pay for the remedy for the Maunabo Site."
[It] is not seeking, in this matter, an order requiring PRIDCO to implement the 2012 remedy or to recover any costs that the EPA itself incurs in implementing the 2012 remedy. The United States will bring such claims, if ever, in a future action against PRIDCO.
These statements contradict all previous pleadings submitted by the United States, including the amended complaint and motion for summary judgment. See Docket No. 8 at p. 9; Docket No. 142 at p. 8. The EPA initially estimated that the selected remedy, i.e. air sparging for the cis-1, 2-DCE plume and monitored natural attentional for the reaming two plumes, would cost $ 4.9 million. (Docket No. 139, Ex. 2 at p. 38.) Wiley Wright disclosed that the "EPA has provided the majority of work performed (e.g. contracts, statements of work, and/or work assignment) for the Site contractor costs." (Docket No. 142, Ex. 9 at p. 7.) If the United States is, indeed, not seeking to recover costs stemming from air sparging (the remedy), then the costs *343cited by Wiley Wright may need to be modified. Consequently, the critical question posed by the inconsistent positions articulated by the United Sates is: What removal and/or remedial actions implemented by the EPA to address the cis-1, 2-DCE plume form the basis of the costs requested by the United States? The United States is ORDERED to specify which response actions (e.g. removal actions, remedial actions) underlie the costs that it purports PRIDCO is liable for paying. Trial for Phase II will commence after the United States reconciles the inconsistent cost assessments. The United States' motion to limit the scope of judicial review is DENIED WITHOUT PREJUDICE . (Docket No. 138.)
V. CONCLUSION
For the reasons set forth above, the United States' motion for summary judgment is GRANTED IN PART and DENIED IN PART . (Docket No. 142.) PRIDCO's motion for summary judgment is DENIED . (Docket No. 143.) The United States' motion to limit the scope of judicial review is DENIED WITHOUT PREJUDICE . (Docket No. 138.) The United States is ORDERED to specify which response actions (e.g. removal actions, remedial actions) underlie the costs for which PRIDCO is purportedly liable, and to reconcile its inconsistent cost assessments, no later than April 25, 2019 .
Trial regarding Phase II, if necessary, will be scheduled by separate order.
IT IS SO ORDERED.
368 F. Supp. 3d 326 (United States v. Puerto Rico Indus. Dev. Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.